§ 25.10.05 — Development standards
City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 25.10.05
Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/90e79755-599f-483c-a0b7-33167fc0cb7d
Sec. 25.10.05. - Development standards.
a. Table of development standards. Zone | Minimum Lot Dimensions | Building Envelope Requirements | Lot Coverage | Additional Regulations Minimum Setbacks | Max. Height | Max. Lot Coverage (All main and accessory buildings) (See Sec. 25.10.05.b) | Maximum Impervious Surface in Front Yard 1 Front | Side | Rear Area | Width at Front Setback Line | Width at Front Lot Line | Standard | Where established setback exceeds standard (See Sec. 25.10.05.e.2) | Where street abuts | Where land abuts R-400 | 40,000 sq ft | 150' | 25' | 50' | Est. setback up to 100' | 30' | 20' | 50' | 40' | 15% | 10% R-200 | 20,000 sq ft. | 100' | 25' | 35' | Est. setback up to 100' | 25' | 13' | 35' | 40' 2 | 25% | 20% R-150 | 15,000 sq ft | 90' | 25' | 35' | Est. setback up to 60' | 30' | 13' | 30' | 40' | 25% | 25% R-90 | 9,000 sq ft | 80' | 25' | 30' | Est. setback up to 60' | 20' | 11' | 25' | 35' | 25% | 30% | See Sec. 25.10.09 for limitations on building height in R-60, R-75 & R-90 zones R-75 | 7,500 sq ft | 70' | 40' | 25' | Est. setback up to 50' | 20' | 9' | 20' | 35' | 35% | 35% R-60 | 6,000 sq ft | 60' | 35' | 25' | Est. setback up to 50' | 20' | 8' | 20' | 35' | 35% | 40% R-60 qualifying undersized lots | 5,000 sq ft | 50' | 35' | 25' | Est. setback up to 50' | 20' | 7' | 20' | 35' | 35% | 40% | See Sec. 25.08.03 R-40 | 4,000 sq. ft. | 40' | 25' | 25' | Est. setback up to 50' | 25' | 10' | 20' | 35' | 40% | 45% | Single unit detached dwellings: R-60 standards in lieu of R-40 standards Lincoln Park Conservation District | 6,000 sq ft | 60' | 35' | 25' | Est. setback up to 50' | 20' | 8' | 20' | 25' | 1,500 square feet | 40% | See Sec. 25.14.03 1 Impervious surfaces include driveways, parking areas and sidewalks. In cases where the Department of Public Works approves a pervious paving material, the area of the front yard devoted to vehicle movement and parking is still limited to the percentage shown in the table above. 2 In the case of an institution of higher learning located on a site greater than seventy-five (75) acres, the maximum building height is 75 feet where the use adjoins property in a single dwelling unit residential zone or a park zone, and building height cannot penetrate a layback slope formed by an angle of thirty (30) degrees measured from the property boundary of the adjoining residential or park zone. b. Maximum lot coverage. 1. Inclusion of accessory buildings. Maximum lot coverage includes accessory buildings; however, historic accessory buildings, located in a historic district zone, are exempt from the calculation. 2. Special provision in the R-200 zone. In the R-200 zone, the maximum lot coverage is twenty-five (25) percent, except as provided for in subsections 25.15.02.j. and 25.15.02.k. for housing for senior adults and persons with disabilities and life care facilities. c. Impervious surface limits for corner lots and through lots. 1. Corner lots. On corner lots, the maximum impervious surface limits for the front yard are one-half (½) the percentage requirements shown in the development standards table in subsection 25.10.05.a. above. 2. Through lots. On through lots, the maximum impervious surface limits for the two (2) front yards are calculated as follows: Each front yard is defined as the area along the full width of the lot and the depth of the minimum front yard setback required in the zone. Each front yard must not exceed the maximum impervious surface limits shown in the development standards table in subsection 25.10.05.a. above. d. Exclusions from impervious surface requirements. Institutional uses in the single dwelling unit residential zones must normally meet the requirements set forth in subsection 25.10.05.a. above for the maximum impervious surface area in a front yard. However, through site plan review in accordance with the provisions of article 7, the approving authority may waive this requirement if it finds that such a waiver will reduce impacts of paved areas on adjoining residential uses, provide more efficient on-site traffic circulation, or address practical difficulties. e. Setbacks. 1. Side setbacks where street abuts. A street along a side lot is deemed to be a side street only if the lot abutting the rear of the subject lot does not front on the street, otherwise the front setback requirement must apply. 2. Front setback where established setback exceeds the standard setback. In cases where more than half of the lots located on one (1) side of a street between two (2) intersecting streets are occupied by buildings having a front setback different from the normal specified, any building hereafter must conform to the setback line up to the maximum specified in the development standards table in subsection 25.10.05.a. above. 3. Minimum setbacks. A 50-foot setback is required from a right-of-way of limited access and a major or arterial highway unless the lot or lots are shown on an approved preliminary subdivision plan or an approved final record plat prior to January 1, 1980.
(Ord. No. 29-09, § 10, 10-26-09; Ord. No. 16-10, § 3, 9-13-10; Ord. No. 13-22, 7-18-22)
Ask a question about Rockville law
Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
