§ 5-292 — Same—Amendments
City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 5-292
Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/5dd9992c-f295-4b36-bd0f-d6a3937ee7b8
Sec. 5-292. - Same—Amendments.
The ICC International Existing Building Code, 2021 Edition (IEBC), as incorporated by reference and amended in COMAR 09.12.58, is amended in the following respects: Section 101.1 of the IEBC is amended to read as follows: 101.1 Title. These regulations shall be known as the Existing Building Code of the City of Rockville, hereinafter referred to as "this code." Section 101.6 of the IEBC is amended to read as follows: 101.6 Appendices. Appendices A and C, and Resource A are adopted as part of this code. Section 101.2.1 of the IEBC is amended to read as follows: 101.2.1 Application of fire code. Where work regulated by this code is also regulated by the construction requirements for existing buildings in Chapter 9 of the Rockville City Code, such work shall comply with applicable requirements in both codes. Section 102.4.1 of the IEBC is amended to read as follows: 102.4.1 Conflicts. Where conflicts occur between provisions of this code and referenced codes and standards, the most restrictive provisions shall apply. Section 102.6 is added to the IEBC to read as follows: 102.6 Relation to the Maryland Building Rehabilitation Code. Where conflicts occur between provisions of the Maryland Building Rehabilitation Code and this code, the most restrictive provisions shall apply. In all cases, the minimum requirements of the Maryland Building Rehabilitation Code shall be met. Sections 102.7 is added to the IEBC to read as follows: 102.7 Relation to the Maryland Accessibility Code. The Maryland Accessibility Code (COMAR 09.12.53) is incorporated by reference. Where conflicts occur between provisions of the Maryland Accessibility Code and this code, the provisions providing the greatest level of access, as determined by the Building Official, shall apply. In all cases, the minimum requirements of the Maryland Accessibility Code shall be met. Section 103 of the IEBC is deleted in its entirety. Section 105.2 of the IEBC is amended to read as follows: 105.2 Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following: 1. Building: 1. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. 2. Temporary motion picture, television, and theater stage sets and scenery. 3. Shade cloth structures constructed for nursery or agricultural purposes, and not including service systems. 4. Window awnings supported by an exterior wall of Group R-3 or Group U occupancies. 5. Nonfixed and movable cases, counters and partitions not over 5 feet 9 inches (1753 mm) in height. 2. Electrical: 1. Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. 2. Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions, but do apply to equipment and wiring for power supply, the installations of towers and antennas. 3. Temporary testing systems: A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus. 3. Gas: 1. Portable heating appliance. 2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe. 4. Mechanical: 1. Portable heating appliance. 2. Portable ventilation equipment. 3. Portable cooling unit. 4. Steam, hot or chilled water piping within any heating or cooling equipment regulated by this code. 5. Replacement of any part that does not alter its approval or make it unsafe. 6. Portable evaporative cooler. 7. Self-contained refrigeration system containing 10 pounds (4.54 kg) or less of refrigerant and actuated by motors of 1 horsepower (746 W) or less. 5. Plumbing: 1. The stopping of leaks in drains, water, soil, waste or vent pipe; provided, however, that if any concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work, and a permit shall be obtained and inspection made as provided in this code. 2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided that such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. Section 106.2.1.1 is added to the IEBC to read as follows: 106.2.1.1 Design Professional. All commercial and multifamily construction documents shall be prepared by a Maryland Licensed registered design professional. Construction documents shall be signed, sealed, and include the titleblock certification statement as required by Maryland State law (COMAR 09.21.02.04 and 09.23.03.09) Section 106.2.3 of the IEBC is amended to read as follows: 106.2.3 Means of egress. The construction documents shall show in sufficient detail the location, construction, size and character of all portions of the means of egress in compliance with the provisions of this code. The construction documents shall designate the number of occupants to be accommodated in every work area of every floor and in all affected rooms and spaces. Section 106.3.3 of the IEBC is amended to read as follows: 106.3.3 Phased approval. The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure prior to the construction documents for the whole building or structure having been approved. The application for foundation permit shall include all relevant information, including but not limited to: setbacks, proposed building height and area, building construction type, and structural criteria. The holder of such permit for the foundation of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted. Section 106.3.3.1 is added to the IEBC to read as follows: 106.3.3.1 Phased construction. Where construction of a building or structure is proposed to be phased, the applicant shall include a phasing plan and narrative with the submittal of construction documents. Such phasing plan shall clearly identify the extent of the work area included in each phase and clearly identify how elements such as the means of egress, active and passive fire protection, accessible routes, and restroom access will be provided or maintained during construction. Section 108.2 of the IEBC is amended to read as follows: 108.2 Schedule of permit fees. The fees shall be as established by resolution of the Mayor and Council. Section 108.4 of the IEBC is amended to read as follows: 108.4 Work commencing before permit issuance. Any person who commences work on an existing building, except as provided for in Section 105.1. before obtaining the necessary permits shall be subject to an investigation fee as set forth by resolution, and 100 percent of the usual permit fee. Section 108.6 of the IEBC is deleted in its entirety. Section 110.1.1 is added to the IEBC to read as follows: 110.1.1 Change of tenant or ownership. Whenever the ownership or tenancy of any part of a non-residential building or space changes, application must be made for a certificate of occupancy. Any violations of this Section or any applicable code as related to fire or life safety codes must be corrected prior to the issuance of the certificate of occupancy. Section 110.3 of the IEBC is amended to read as follows: 110.3 Temporary Occupancy. The building official may issue a temporary occupancy permit. A temporary occupancy permit may be issued if none of the remaining conditions to be complied with are a health or safety hazard. A temporary occupancy permit may not be issued for a single-unit detached dwelling. A temporary occupancy permit is valid for a period not to exceed thirty (30) days. in the discretion of the Building Official. For good cause, the Building Official may extend a temporary occupancy permit when requested for additional periods, in accordance with the City of Rockville Zoning Ordinance Section 25.07.12; however no temporary occupancy permit, including any extensions, will be valid for more than sixty (60) days. Section 112.1 of the IEBC is amended to read as follows: 112.1 Board of Adjustments and Appeals. Appeals of administrative interpretations or decisions made by the Code Official shall be administered in accordance with Chapter 5, Article I, Section 5-12 of the Rockville City Code. Sections 112.2, 112.3 and 112.4 of the IEBC are deleted in their entirety. Notwithstanding Section 09.12.58.03(C)(6) of the Maryland Rehabilitation Code, Section 306 of the IEBC shall apply to existing buildings. Section 306.2 of the IEBC is amended to read as follows: 306.2 Design. Buildings and facilities shall be designed and constructed to be accessible in accordance with this code, the Maryland Accessibility Code (COMAR 09.12.53), and the alteration and existing building provisions in ICC A117.1, as applicable. Chapter 16 of the IEBC is amended by replacing all references to the International Fire Code with Chapter 9 of the Rockville City Code.
(Ord. No. 6-24, § I, 5-20-24)
Ask a question about Rockville law
Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
