Sec. 5-87. - Same—Amendments.
The ICC International Building Code, 2021 Edition (IBC), is amended in the following respects: Section 101.1 of the IBC is amended to read as follows: 101.1 Title. These regulations shall be known as the Building Code of the City of Rockville, hereinafter referred to as "this code". Section 101.3.1 is added to the IBC to read as follows: 101.3.1 Application of references. References to the International Building Code shall mean the 2021 Edition of the International Building Code issued by the International Code Council Inc. Unless otherwise specified, all references to an article, section number, table, chart, etc., or to provisions not specifically identified by number and not set forth textually in this article but included by reference only, shall be construed to refer to such article, section number, table, chart, or provision as specified in the "International Building Code", which article, section or provision is hereby made part of this article and shall have the same force and effect as if set forth in this article in full. The citing of the main number of an article or section of the International Building Code shall be taken to include all of its sections or subsections. Subject to changes by the council, the other standards and specifications, or recommended regulations, or parts thereof, which are included by reference to their title and date in various parts of the " International Building Code" and sometimes identified as an "appendix" thereof, are declared to be a part of this article to the full extent of the provisions of such "appendix" or "appendices"; provided, that in the case of conflict the provisions of this article shall govern. Amendments to the International Building Codes may be promulgated from time to time by the International Code Council, shall be adopted pursuant to laws as are other ordinances or amendments thereto. Changes in the regulations or standards and specifications promulgated by the accredited authoritative agencies of the International Code Council shall be adopted as regulations, standards, and specifications of the City after being approved by ordinance of the council. Section 101.4.5 of the IBC is amended to read as follows: 101.4.5 Fire prevention. The provisions of the National Fire Protection Association (NFPA) 1 Fire Code and NFPA 101 shall apply to matters affecting or relating to structures, processes and premises from the hazard of fire and explosion arising from the storage, handling or use of structures, materials or devices; from conditions hazardous to life, property or public welfare in the occupancy of structures or premises; and from the construction, extension, repair, alteration or removal of fire suppression, automatic sprinkler systems and alarm systems or fire hazards in the structure or on the premises from occupancy or operation. All references throughout this code to the International Fire Code shall be replaced with "The fire prevention provisions identified in Section 101.4.5 of this code". Section 102.4.1 of the IBC is amended to read as follows: 102.4.1 Conflicts. Where conflicts occur between provisions of this code and referenced codes and standards, the provisions of the most restrictive provisions shall apply. Section 102.6 of the IBC is amended to read as follows: 102.6 Existing structures. The legal occupancy of any structure existing on the date of adoption of this code shall be permitted to continue without change, except as otherwise specifically provided in this code, the International Existing Building Code, the Property Maintenance Code, or the State of Maryland Fire Prevention Code. Section 105.1.3 is added to the IBC to read as follows: 105.1.3 SFD Permit application notification. Before a permit is issued for construction of a new single-family dwelling, the owner, applicant, or their agent shall post and maintain a notice furnished by the Building Official at the front lot line facing the street of the proposed structure. The placard shall be conspicuously posted so as to be visible from the public way. The SFD permit shall not be issued by the Building Official until at least 30 calendar days after the date the notice is posted on the site and verified through an inspection performed by the Building Official. Exception: Single Family Dwellings that are part of a sub-division containing more than 5 dwellings. Section 105.2 of the IBC is amended to read as follows: 105.2 Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following: Building: 1. One-story detached accessory structures, accessory to Group R-3 occupancies, used as tool and storage sheds, playhouses and similar uses, provided that the floor area is not greater than 200 square feet. 2. Fences not over 7 feet (2134 mm) high. 3. Oil derricks. 4. Retaining walls that support a surcharge and are not over 2 feet in height as measured from the lower grade level to the grade level on the high side of the wall, and/or supporting a surcharge or impounding Class I, II or IIIA liquids. 5. Water tanks supported directly upon grade if the capacity does not exceed 5,000 gallons (18,927 L) and the ratio of height to diameter or width does not exceed 2 to 1. 6. Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade and not over any basement or story below. 7. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. 8. Temporary motion picture, television and theater stage sets and scenery. 9. Prefabricated swimming pools that are less than 24 inches (610 mm) deep. 10. Shade cloth structures constructed for nursery or agricultural purposes, not including service systems. 11. Swings and other playground equipment accessory to detached one-and two-family dwellings and townhouses. 12. Window awnings supported by an exterior wall that do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support. 13. Non-fixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches (1753 mm) in height. 14. For group R-3 one- and two-family dwellings and townhouses, replacing roof covering and underlayment materials in-kind, where neither the existing roof deck nor structural members are replaced, repaired, removed or otherwise altered. 15. For group R-3 one- and two-family dwellings and townhouses, replacing the outermost exterior wall covering materials in-kind, where the existing wall sheathing, thermal envelope, water-resistive barrier and structural members are not replaced, repaired, removed or otherwise altered. 16. Patios/decks, accessory to Group R-3 one- and two-family dwellings and townhouses, that are not greater than 47-3/4 inches in height above ground level. Height is measured from top of patio/decking to ground at lowest point. 17. For detached single-family structures, removal and replacement of drywall not to exceed 320 square feet of drywall that is not part of a fire-resistance-rated assembly. Electrical: 1. Listed cord-and-plug connected temporary decorative lighting. 2. Reinstallation of attachment plug receptacles but not the outlet therefore. 3. Replacement of branch circuit overcurrent devices of the required capacity in the same location. 4. Electrical wiring, devices, appliances apparatus or equipment operating at less than 25 volts and not capable of supplying more than 50 watts of energy. 5. Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. 6. Removal and replacement of stoves, disposals, ranges. Lighting fixtures, or similar appliances and equipment, not to include base board heaters. 7. Portable generators 10KW or less. Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions but do apply to equipment and wiring for a power supply and the installations of towers and antennas. Temporary testing systems: A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus. Gas: 1. Portable heating, cooking or clothes drying appliances. 2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe. 3. Portable-fuel-cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid. Mechanical: 1. Portable heating appliances. 2. Portable ventilation appliances. 3. Portable cooling units. 4. Steam, hot or chilled water piping within any heating or cooling equipment regulated by this code. 5. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe. 6. Portable evaporative coolers. 7. Self-contained refrigeration systems containing 10 pounds (4.54 kg) or less of refrigerant or that are actuated by motors of 1 horsepower (746 W) or less. (Window AC units). 8. Portable-fuel-cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid. Plumbing: 1. The stopping of leaks in drains, water, soil, waste or vent pipe; provided, however, that if any concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in this code. 2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. Section 105.2.3 is added to the IBC to read as follows: 105.2.3 Repairs. Application or notice to the Building Official is not required for ordinary repairs to structures. Such repairs shall not include the cutting away of any wall, partition, or portion thereof. The removal or cutting of any structural beams or load bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting the egress requirements; nor shall ordinary repairs including additions to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, service, waste, vent or similar piping, electrical wiring or mechanical or other work affecting public health or general safety. Section 105.3.3 is added to the IBC to read as follows: 105.3.3 Denial of permit. The Building Official is authorized to deny a permit where the applicant or contractor has a suspended contractor license or is under investigation for alleged violations by the issuing authority. Section 105.5 of the IBC is amended to read as follows: 105.5 Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within six (6) months (180 days) after its issuance, or if the work authorized by such permit does not continue to progress or is abandoned for a period of six (6) months (180 days) after the last approved/valid inspection. The last approved/valid inspection shall be an inspection that has been passed. A failed inspection will not count as an approved/valid inspection. Before such work recommences, a new permit shall be first obtained, and the appropriate fees, per the City's Fee Schedule shall be paid. Section 105.5.1 is added to the IBC to read as follows: 105.5.1 Extensions. The Building Official may extend the time for action by the permittee if there is reasonable cause. A permittee holding an unexpired permit shall have the right to apply for an extension, in writing, for time to complete such work. The extension shall be requested for a justifiable cause. Section 107.2 of the IBC is amended to read as follows: 107.2 Construction Documents. Construction documents shall be in accordance with Sections 107.2.1 through 107.2.10 Section 107.2.1.1 of the IBC is amended to read as follows: 107.2.1.1 Building Height and Area Calculations. On the Code Data Sheet included in the construction documents, the design professional shall provide the height and area calculations used to determine if the structure meets the limitations of the building code. Sections 107.2.2.1 & 107.2.2.1.1 are added to the IBC to read as follows: 107.2.2.1 Shop Drawings. All fire protection shop drawings prepared by persons other than the fire protection engineer of record for the project shall be reviewed by the fire protection engineer of record; or where an FPEDE is required, the fire protection engineer who performed the FPEDE, prior to submittal to the City of Rockville. This section is applicable to, but not limited to, all elements or systems identified in Chapter 9 of the International Building Code. Shop drawings may include, but are not limited to, fire sprinkler plans, non-aqueous fire protection systems, fire alarm submittals, smoke control systems. The fire protection engineer shall review the plans for coordination of components and the performance of integrated systems. The fire protection engineer will also verify that the systems are designed in accordance with the appropriate standard, all fire protection systems are coordinated together to work in concert, and that all information is presented for a review. 107.2.2.1.1 Required Statement. Each set of fire protection shop drawings must have a signed and sealed statement attached to the plans by the evaluating fire protection engineer, attesting: "In my professional engineering opinion these drawings and specifications have been reviewed, coordinated with other applicable fire protection systems, and are in compliance with the fire safety provisions of all adopted State and local building code, fire codes, mechanical codes, local amendments and referenced codes and standards to the best of my knowledge and belief." Section 107.2.9 is added to the IBC to read as follows: 107.2.9 Fire Protection Engineering Design Evaluation (FPEDE). All plans and specifications for which a building permit is required for buildings of the Use Groups listed in Section 107.2.10 shall be evaluated in accordance with the requirements of this Section for design compliance with adopted fire related code requirements concerning: 1. Documentation of the title and edition of all applicable State and local Building and Fire codes and standards, and amendments thereto, on which the design is based; 2. Designated Use Group Classification(s) of all spaces; 3. Type of Construction requirements identified, with supportive calculations; 4. Documentation of fire endurance ratings of structural elements and fire rated components (walls, floors, roofs, parapets, opening protectives); 5. Detailed discussion for protection of fire rated penetrations, systems joining fire rated assemblies, perimeter fire containment, etc.; 6. Height and area limits compliance and required property line setback criteria; 7. Occupant load calculations, egress capacity and travel distance analysis; 8. Interior finishes analysis; 9. Fire protection systems required (suppression, fire alarm, smoke detection, heat detection, smoke control, other required fire protection systems); 10. Fire hydrant locations, fire department connection locations, and emergency fire and medical vehicle access; 11. Emergency lighting and emergency power systems; 12. Applicable provisions of Chapter 4 of the IBC, "Special Detailed Requirements Based on Use and Occupancy"; 13. Compliance with applicable NFPA Codes and Standards for specific processes, materials, or hazards which are referenced within the IBC, NFPA 101, Life Safety Code or NFPA 1, Uniform Fire Prevention Code; 14. Integration, coordination and performance of fire protection systems (both active and passive) with detailed information of their features; 15. Completion of the 2021 International Building Code Plan Review Record as published by the International Code Council. A written Fire Protection Engineering Design Evaluation (FPEDE) concerning these items shall be submitted with the plans accompanying the application for a building permit. It shall be in a format established by the Fire Marshal and shall be signed and stamped by the preparer. If, in the course of performing the FPEDE, the evaluating fire protection engineer determines that there are fire related code deficiencies in the drawing or specifications, all such deficiencies shall be remedied prior to the submittal of the FPEDE and the building permit application and drawings. The FPEDE must include a signed and sealed statement by both the evaluating fire protection engineer and the engineer or architect of record attesting: "In my professional engineering opinion these drawings and specifications are in compliance with the fire safety provisions of all adopted State and local Building Code, Fire Codes, Mechanical Codes, local amendments and referenced codes and standards to the best of my knowledge and belief". 107.2.9.1 FPEDE Finals. Prior to final inspection by city officials, the fire protection engineer shall personally inspect and verify that the systems are installed correctly and are prepared for an inspection. Section 107.2.10 is added to the IBC to read as follows: 107.2.10 Use Groups Requiring a Fire Protection Engineering Design Evaluation (FPEDE). An FPEDE is required when deemed necessary by the Building Official, during the pre-submittal phase, for the following buildings or fire protection systems for which a building permit application is made: (1) Use Group "A", Assembly, with an occupant load of One Thousand (1,000) persons or more; (2) Use Group "E", Educational; (3) Use Group "H", High Hazard; (4) Use Groups "I-2 and I-3", Institutional; (5) Use Group "M", all malls of Type I construction; (6) All Use Groups with an estimated construction cost of Six Million Dollars ($6,000,000.00) or more; (7) Other complex or unique structures, as determined by the City of Rockville Fire Marshal. 107.2.10.1 Qualifications of Fire Protection Design Evaluation (FPEDE) Preparer. The FPEDE must be prepared by a Fire Protection Engineer who is a registered Professional Engineer in the State of Maryland. Section 107.3.3 of the IBC is amended to read as follows: 107.3.3 Phased approval. The Building Official is authorized to issue a permit for the construction of foundations of a building or structure prior to approval of construction documents for the whole building or structure. The application for a foundation permit shall include all relevant information, including but not limited to setbacks, proposed building height and area, building construction type, and structural criteria. The holder of such permit for the foundation of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted. Section 107.3.3.1 is added to the IBC to read as follows: 107.3.3.1 Phased construction. Where construction of a building or structure is proposed to be phased, the applicant shall include a phasing plan and narrative with the submittal of construction documents. Such phasing plan shall clearly identify the extent of the work area included in each phase and clearly identify how elements such as the means of egress, active and passive fire protection, accessible routes, and restroom access will be provided or maintained during construction. Section 107.3.4.2 is added to the IBC to read as follows: 107.3.4.2 Design Professional. All commercial and multifamily construction documents shall be prepared signed, sealed and include the titleblock certification statement as required by Maryland State law (COMAR 09.21.02.04 and 09.23.03.09) Section 110.3.4.1 is added to the IBC to read as follows: 110.3.4.1 Residential Building Height. The height of residential buildings in Group R-3 shall conform with Chapter 25, Zoning Ordinance, Section 25.10.05 of the Rockville City Code. A building height certification shall be submitted to the City of Rockville after all framing and roofing is complete. No close-in inspections will be performed until the certification has been approved by the City. The building height certification shall be prepared and signed by a licensed land surveyor in the State of Maryland, a civil engineer licensed in the State of Maryland or any individual who is deemed qualified by the Building Official. Exception: (1) Residential buildings in Group R-3 where the proposed addition, alteration or reconstruction does not exceed or increase the height of the existing structure. New SFD construction shall be excluded. Sections 111.1.1, 111.1.2, and 111.1.3 are added to the IBC to read as follows: 111.1.1 New buildings. A building or structure hereafter erected shall not be used or occupied in whole or in part until the certificate of occupancy has been issued by the Building Official. 111.1.2 Buildings hereafter altered. A building or structure hereafter enlarged, extended or altered to change from one (1) use group to another or to a different use within the same use group in whole or in part, and a building or structure hereafter altered for which a certificate of occupancy has not been heretofore issued, shall not be occupied or used until the certificate shall have been issued by the Building Official, certifying that the work has been completed in accordance with the provisions of the approved permit. Any use or occupancy, which was not discontinued during the work of alteration, shall be discontinued within thirty (30) days after the completion of the alteration unless the required certificate is secured from the Building Official. 111.1.3 Change of tenant or ownership. Whenever the ownership or tenancy of any part of a non-residential building or space changes, application must be made for a certificate of occupancy. Any violations of this Section or any applicable code as related to fire or life safety codes must be corrected prior to the issuance of the certificate of occupancy. Section 111.3 of the IBC is amended to read as follows: 111.3 Temporary Occupancy. The Building Official or designee may issue a temporary occupancy permit. A temporary occupancy permit may be issued if none of the remaining conditions to be complied with are a health or safety hazard. A temporary occupancy permit may not be issued for a single-unit detached dwelling. A temporary occupancy permit is valid for a period not to exceed thirty (30) days, in the discretion of the Building Official or designee. For good cause, the Building Official or designee may extend a temporary occupancy permit when requested for additional periods, in accordance with the City of Rockville Zoning Ordinance Section 25.07.12, however no temporary occupancy permit, including any extensions, will be valid for more than sixty (60) days. Section 113.1 of the IBC is amended to read as follows: 113.1 Board of Adjustments and Appeals. Appeals of administrative interpretations or decisions made by the Building Official shall be administered in accordance with Chapter 5, Article I, Section 5-12 of the Rockville City Code. Section 115.4 of the IBC is amended to read as follows: 115.4 Unlawful Continuance. Any person who shall continue any work in or about the structure after having been issued a verbal or written stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be liable to a fine as set forth by resolution of the Mayor and Council. Section 414.1.2.2 is added to the IBC to read as follows: 414.1.2.2 Laboratory chemicals. Upon application for construction permit, the applicant shall provide a listing of chemicals to be stored and used in any structure with a laboratory. The chemical list shall contain, at a minimum, the name and quantity to be stored of each individual chemical, the Material Safety Data Sheets, and the container storage type and arrangement for review. Section 901.1 of the IBC is amended to read as follows: 901.1 Scope. The provisions of this chapter shall specify where fire protection systems are required and shall apply to the design, installation and operation of fire protection systems. These fire protection system requirements may be concurrently covered in the State of Maryland Fire Prevention Code, Public Safety Article Sections 6-101 -6-202 Annotated Code of Maryland and COMAR 29.06.01. Section 903.1.2 is added to the IBC to read as follows: 903.1.2 Sprinkler Zones. Each floor shall be zoned separately. Where atrium smoke exhaust is used, atriums shall be separately zoned to work in concert with the fire alarm zone to activate the exhaust fans. Exceptions: (1) Where the building is not protected throughout by a fire alarm system in accordance with Section 907, a zone shall not exceed 52,000 square feet (2,090m 2 ) for light hazard occupancies and 40,000 square feet for ordinary and extra hazard occupancies. (2) Single unit dwellings designed in accordance with NFPA 13D. (3) Multi-story dwelling units Section 903.3.1.1.2.1 is added to the IBC to read as follows: 903.3.1.1.2.1 Manner for Calculation of Residential Bathroom Square Footage. When calculating the area of a residential bathroom for the purpose of determining if sprinkler coverage is required, any separate rooms with doors opening into the larger room contained within the larger footprint shall be counted. The area that a shower stall or bathtub uses shall also be incorporated into the overall area calculation. Rules governing smaller rooms shall continue to apply when determining if those smaller rooms need independent sprinkler heads. Section 903.4.3.1 is added to the IBC to read as follows: 903.4.3.1 Sprinkler Floor Control Valves Arrangement. When a sprinkler system serves more than one level, each level must be consistently and separately valved by a listed and approved control valve. Control valves shall be located in an area which provides adequate and easy access by the Fire Department. Additionally, at each control valve, approved signage shall be permanently installed to advise individuals of the additional control valves and their location(s) on the floor. If the building is provided with a fire alarm system, the fire alarm zones will need to coincide with the flow switch arrangement to provide proper annunciation. Section 903.6 is added to the IBC to read as follows: 903.6 Sprinkler Plan Preservation. All buildings equipped with a new sprinkler system shall have a copy of the plans permanently mounted in the Fire Command Center or Fire Pump room or main sprinkler valve room. The plans shall be protected from deformation and located in a dedicated, labeled storage cabinet permanently mounted to the wall adjacent to the main sprinkler riser and locked. Plans can be reduced in size but must remain legible. Exceptions: Plans for tenant modifications do not need to meet this requirement. Section 903.7 is added to the IBC to read as follows: 903.7 Insulation Value for Sprinkler Piping Protection. All insulation installed near or on sprinkler piping shall have a minimum R-value of 30. R-30 insulation shall be used in the attic and in the exterior walls. Only batt insulation shall be used in the specific areas protecting sprinkler piping. Blown-in insulation shall not be used in the same channels as sprinkler piping. Appropriate width shall be provided to prevent the compaction of the insulation, thus decreasing the "R" value of the insulation. Section 903.8 is added to the IBC to read as follows: 903.8 Minimum length of "Dry" type sprinkler heads. All dry type sprinkler heads connected to wet pipe sprinkler systems shall have a minimum barrel length of 12 inches. The installation of the sprinkler head shall not have the barrel protruding from the wall/ceiling or exposed on the exterior of the wall/ceiling. Section 903.9 is added to the IBC to read as follows: 903.9 Sprinkler System Riser locations. All alarm check valves on sprinkler system risers shall be located in the same room. Exception: Where a separate alarm check valve serves a special hazard, the alarm check valve shall be permitted if the alarm valve installed in a labeled dedicated room that is located adjacent to the special hazard. The room must be arranged with drainage adequate in size to handle main drain flow tests or the drain is piped to the exterior. Special signage shall be located at the main sprinkler riser room to direct maintenance personnel, service workers and firefighters to the dedicated room. Section 907.1.2.1 is added to the IBC to read as follows: 907.1.2.1 Electric Water Flow Alarm. If an electrical alerting device is chosen as the water flow alarm on the exterior of a building, the audible bell will be equipped with a clear lens strobe immediately adjacent to the audible device. The electric audible and visual device shall be mounted immediately above all fire department connections. Section 907.2.13.2 of the IBC is amended to read as follows: 907.2.13.2 Fire department communication system. An approved two-way, fire department communication system designed and installed in accordance with NFPA 72 shall be provided for fire department use. It shall operate between a fire command center complying with Section 911, elevators, elevator lobbies, emergency and standby power rooms, fire pump rooms, areas of refuge and inside enclosed exit stairways. The fire department communication devices shall be provided on intermediate floor landings in stairwells and adjacent to fire department hose connections, unless otherwise permitted by the Building Official. Sections 907.6.4.3 and 907.6.4.4 are added to the IBC to read as follows: 907.6.4.3 Fire Alarm Zones. Each floor shall be zoned separately. Where the building is protected by an automatic sprinkler system in accordance with Section 903, the area of the fire alarm zone shall coincide with the allowable area of the sprinkler system. 907.6.4.4 Fire Alarm Zones Unprotected areas. Where the building is not protected throughout by an automatic sprinkler system in accordance with Section 903, a zone in an unprotected area shall not exceed 22,500 square feet (2090 m 2 ) and the length of any zone shall not exceed 300 feet (91440 mm) in any direction. Section 911.1.1 of the IBC is amended to read as follows: Section 911.1.1. "The fire command center shall have a door directly to the exterior of the building on the address side. The exterior door to the fire command center shall be within 50 feet of a fire department access road. A fire department access box shall be provided within 6 feet of the exterior door to the fire command center. The exterior door to the fire command center shall be identified on the exterior face as the fire command center in a manner acceptable to the fire official." Section 911.1.6 of the IBC is amended to read as follows: Item 2 "The fire department communications system which may include an in-building public safety radio enhancement system monitoring panel." Item 11 "Fire pump status indicators and remote starting." Add item 19 "A shunt trip device to disconnect the electrical service to the building." Section 913.2.3 is added to the IBC to read as follows: 913.2.3 Fire Pump Room Design. Any room housing a fire pump shall be of sufficient size to allow access to all sides of the pump that require servicing and maintenance. 913.2.3.1 Fire Pump Room Doorway. The room shall have a doorway directly to the exterior. The doorway shall be of sufficient size to allow removal of the fire pump and be a minimum of 36 inches in width. Exception: Fire Pump rooms located below grade with direct access from a fire department and maintenance accessible area are exempt from the doorway directly to the exterior. 913.2.3.2 Fire Pump Room Protection. Access to fire pump shall be maintained at all times by bollards or other vehicular protective devices installed outside of the doors. The protective devices shall be located to prevent vehicles from parking in front of the doors. 913.2.3.3 Fire Pump Room Drains. Each fire pump room shall be provided with a minimum of two drains located near the fire pump. Each drain shall have a minimum of 4-inch diameter opening. One drain shall be dedicated to the main drain from the pump discharge piping and the second drain opening shall serve the accessory drain piping from the fire pump. 913.2.3.4 Fire Pump Test Header Location. The fire pump test header shall be located in a location where it would not be confused with the sprinkler/standpipe feed connection used by the fire department. The pump test header shall be located near an area where water discharge is easily contained and directed to collection points without impacting public vehicular traffic. 913.2.3.5 Fire Pump Transfer Switch. If a secondary electrical power supply is provided for the fire pump, the fire pump controller shall be a dual service controller acting as a combination fire pump controller and transfer switch. Exception: Limited service controllers with a separate transfer switch will be permitted only if the transfer switch is installed adjacent to the limited service fire pump controller. Section 914.3 is added to the IBC to read as follows: 914.3 Internal Fire Department Access in Complex Structures. In all structures, at least one entrance to a stair shall be provided in the vicinity of the main fire department access point. Such stair must provide access to all levels of the structure. If a standpipe system is required in the building, this stair must be provided with that means of manual fire protection. The automatic fire sprinkler floor control valves shall also be located in this stair. Section 918 of the IBC is amended to read as follows: Section 918 Radio Amplification System for Emergency Service Personnel 918.1 General. The provisions of this Section shall apply to all newly constructed below ground floors of a building, all floors in buildings greater than 25000 ft 2 per floor, and to all floors of buildings greater than 3 stories in height. 918.2 Where Required. Every floor area in a building or structures which cannot achieve the required level of radio coverage as established by Montgomery County Department of Technology Services (DTS) shall be provided with in-building public safety radio enhancement system in accordance with the Montgomery County Fire Safety Code. 918.3 Inspection and Testing. Emergency responder radio coverage and in-building public safety radio enhancement systems must be tested, and inspected by approved individuals. The results of the testing and inspection shall be certified to the Building Official and Montgomery County prior to issuance of an occupancy permit. Section 919 is added to the IBC to read as follows: Section 919 Fire Hydrants 919.1 Fire Hydrant Spacing. For all newly constructed buildings, fire hydrants shall be spaced at no greater than 300 feet from all points of the structure as the fire hose would lay on the ground. The perimeter distance shall be measured, as a hose line would be laid along paved streets, through parking lot entrances, and around obstructions, in accordance with the determination of the authority having jurisdiction. If publicly maintained hydrants do not meet this spacing, then privately owned and maintained hydrants shall be provided. Exception: Fire hydrant perimeter spacing may be increased to 500 feet for a structure equipped with an automatic fire suppression installed completely throughout. The distance from a fire hydrant to the fire department connection shall remain 100 feet. 919.1.1 Fire Hydrant location. Structures equipped with a sprinkler system and/or a standpipe system shall have a fire hydrant located within 100 feet of the fire department connection. The distance shall be measured along a path accessible to foot travel. 919.2 Fire Hydrant Location Markings. All new and relocated fire hydrants, either maintained by the City of Rockville, Washington Suburban Sanitary Commission or privately owned, shall be provided with a marker installed in the roadway. The marker shall be reflective and blue in color. The location of the marker shall be dependent upon the roadway characteristics. • On unstriped roadways, blue markers shall be set in the center of the roadway. • On undivided striped roadways, blue markers shall be set 6" to the hydrant side of the center stripe. • On divided roadways, the blue marker shall be set 6" to the side of the lane striping, which is closest to the hydrant. • In locations where hydrants are situated on corners, blue markers shall be installed on both approaches, which front the hydrant. In addition, all fire hydrants shall be equipped with a vertical visual indicator to be permanently attached to the bonnet of the fire hydrant to assist in locating the hydrant when surrounded by snow. 919.3 Fire Hydrant Color Coding. A reflective tape marker shall be placed on each fire hydrant indicative of the fire hydrant's flow characteristics. The color of the band of reflective tape shall be in accordance with NFPA 291, Recommended Practice for Fire Flow Testing and Marking of Hydrants. The band shall be at least 2 inches in width and shall be wrapped around the neck of the fire hydrant, which is immediately beneath the bonnet. Exception: If the fire hydrant is manufactured where a band cannot be attached, a reflective self-adhesive tape shall be applied to the rim of the bonnet. 919.4 Fire Hydrant Protection Systems. When a fire hydrant is considered to be vulnerable to vehicular traffic by the Building Official, a protective system shall be installed to prevent any damage. The system can be composed of bollards or another accepted physical barriers capable of impact without causing damage to the fire hydrant. Section 1001.1.1 is added to the IBC to read as follows: 1001.1.1 Scope. Means of egress requirements of Chapter 10 may be concurrently covered in the State of Maryland Fire Prevention Code, Public Safety Article Sections 6-101 - 6-202 Annotated Code of Maryland and COMAR 29.06.01. Section 1028.6 is added to the IBC to read as follows: 1028.6 Construction of Path to Egress Discharge. Egress discharge paths shall be made of permanent, formed materials arranged in a manner to lead occupants to a public way. Grass lawns, gravel and other filler materials are not acceptable path bases. Section 1101.2 is added to the IBC to read as follows: 1101.2 Maryland Accessibility Code. The Maryland Accessibility Code as set forth in COMAR 09.12.53 is hereby incorporated by reference. 1101.2.1 Other laws. The provisions of this code shall not be deemed to nullify any provisions of local, state, or federal law. 1101.2.2 Conflicts. Where conflicts occur between the provisions of this Chapter and local, state, or federal law, the most restrictive provisions shall apply, provided the minimum provisions of state and federal law are met in all cases. Section 1209.2.1 is added to the IBC to read as follows: 1209.2.1 Dedicated Attic Walkways. When a commercial or multi-family residential structure is provided with an attic, dedicated and permanent walkways shall be installed to provide an easy manner for maintenance personnel to traverse the structural spans. The walkway shall be of materials consistent with the construction of the building. The walkway shall be a maximum of 18 inches wide or meeting required widths as designated by other Codes and shall not be used for storage. The walkway shall be arranged so to prevent any contact with sprinkler piping or the insulation that protects the piping. Sections 1507.1.3 and 1507.1.4 are added to the IBC to read as follows: 1507.1.3 Cool roof requirements. Roof coverings for roof slopes less than two units vertical in 12 units horizontal (less than 17-percent slope) for buildings and covered parking shall conform to this section and section 1507.1. Replacement, including any change to design or materials, of the roof of a building or structure in a Historic District Zone must be approved by the Historic District Commission. A minimum of 75% of the entire roof surface not used for roof penetrations, onsite renewable energy systems, or vegetated roofing systems shall be covered with products that comply with the following: 3. Have a minimum initial solar reflective index (SRI) of 78, as described in Section 1507.1.4 or 4. Comply with the criteria for the U.S. EPA's Energy Star Program Requirements for Roof Products - Eligibility Criteria. Exceptions: 1. Roofs used to shade or cover parking and roofs over semi-heated spaces or used as outdoor recreation space by the occupants of the building shall be permitted to be either landscaped or have a minimum initial SRI of 29. A default SRI value of 35 for new concrete without added color pigment is allowed to be used in lieu of measurements. 2. Terraces on setbacks comprising less than 25% of the area of the largest floor plate in the building. 3. Roofs ballasted at a minimum weight of 17 pounds per square foot with limestone or a ballast with a solar reflectance of at least 30% shall be permitted to comprise part or all of the 75% required area coverage. 4. Roofs where a minimum of 75% of the roof area is shaded during the peak sun angle on June 21st by permanent features of the building. 5. Vegetated roofs and onsite renewable energy systems shall be permitted to comprise part or all of the 75 percent required area coverage. 1507.1.4 Solar Reflective Index. The solar reflective index (SRI) shall be calculated in accordance with ASTM E1980 for medium-speed wind conditions. The SRI shall be based upon solar reflectance as measured in accordance with ASTM E1918 or ASTM C1549, and the thermal emittance as measured in accordance with ASTM E408 or ASTM C1371. For roofing products, the values of a solar reflectance and thermal emittance shall be determined by a laboratory accredited by a nationally recognized accreditation organization, such as the Cool Roof Rating Council CRRC-1 Product Rating Program, and shall be labeled and certified by the manufacturer. Section 2301.1.1 is added to the IBC to read as follows: 2301.1.1 Residential wood-framed decks. Wood-framed decks of group R-3 and R-4 occupancies shall be designed and constructed in accordance with this chapter, Section R507 of the 2021 International Residential Code, and the "City of Rockville Typical Deck Details" document.
(Ord. No. 11-15, § 5, 6-1-15; Ord. No. 9-17, § 1, 7-10-17; Ord. No. 22-19, § 5, 9-9-19; Ord. No. 6-24, § I, 5-20-24)
Ask a question about Rockville law
Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.