§ 104.14: Removal of sand, gravel, rock, soil or other earth material.
(a) Topsoil, rock, sand, gravel and similar earth materials may be excavated for commercial purposes from zones where permitted under the terms of this ordinance only after a special permit for such operations has been issued by the building inspector. Such a permit may only be issued provided that: (1) A plan is submitted by the applicant and approved by the Planning Board showing existing grades in the area from which the materials are to be removed and finished grades at the conclusion of the operation. (2) When the removal of materials is completed, the finished grades as specified in the plan and approved are covered with not less than four inches of topsoil and seeded with a suitable cover crop except when ledge rock is exposed. (3) A bond is posted with the treasurer of the City by the applicant in an amount approved by the Planning Board as sufficient to guarantee conformance with provisions of this ordinance. (4) There is at least 75 feet between the digging or quarrying activities and the property lines. (5) Dust or other air pollutants are kept to a minimum by appropriate landscaping, paving, oiling or fencing. (6) Appropriate fencing or landscaping is provided to screen the site of digging operations from any public right-of-way and from any dwelling within 250 feet of the property lines of the excavation site. (b) The Planning Board may waive any or all of the requirements listed in (b) through (f) above if the proposed excavation or quarrying, in the opinion of the board, will have no adverse effect on the health, safety or welfare of the community or the neighborhood and will have no measurable effect on property values in the neighborhood. (c) If 1,000 yards or more of excavation or quarry material is not removed from any existing or future operation in any five-year period, or by January 1, 1997, then further commercial excavation or quarry activity will require a new permit and approval of the Planning Board under this section. For the purposes of this section, all commercial operations shall keep records as to the amount of material removed in each calendar year.
[ Ord. of 2-6-1995 ]
Ask a question about Old Town law
Corpus searches the Old Town sections it holds and shows the ones that match, with their citations. Free, no sign-in.