§ 112.07 — Waiver of provisions

Revised Code of Ordinances, City of Old Town Maine (eCode360 publication OL4196 current through legislation adopted 2025-12-01 (imported 2026-11-16)) · Old Town Zoning Ordinance § 112.07

Corpus is an independent public-information project, not the official City of Old Town website. Stable reference: corpuslaw.us/code/ea7b4858-69b7-4146-8e49-85e0fe28085c

§ 112.07: Waiver of provisions.

Any facility owner/generator may seek a waiver to the provisions governing the establishment, alteration, operation or closing of the waste facilities subject to this section by using the procedures described below. It is the responsibility of the owner/generator to demonstrate that its proposal will comply with the intent of these rules. Note: The Planning Board intends, through this section of "Waivers" to allow for flexibility and creativity in meeting the requirements of these rules. Differences in waste characteristics, facility size, geologic conditions and management capacities may be taken into consideration. (a) Waivers affecting location, facility design, and construction. (1) The Planning Board has determined that the requirements of these rules affecting location criteria for new waste facilities are best able to ensure that a facility will not pollute any waters of the state, contaminate the ambient air, constitute a hazard to health or welfare, or create a nuisance. Whenever a facility owner/generator seeks to vary from the requirements of these rules relating to location criteria, facility design and construction, the owner/generator must present clear and convincing evidence that the facility site's location, design or construction is distinctive in some way that allows for compliance with the intent of the ordinances of the City of Old Town. (2) Application or plans that vary from the requirements of these rules shall identify the provisions from which literal compliance is sought, the proposed alternative, and such clear and convincing evidence as is necessary to demonstrate affirmatively that the intent of the ordinances will be met. The Planning Board shall consider the waiver as part of its comprehensive review of a complete application. (b) Variances affecting the contents of the application and the facility closure plan. Specific requirements of this ordinance relating to the contents of an application for review under this section or the contents of a waste facility closure plan may be varied with the approval of the Planning Board. Particular waste characteristics, handling, site conditions and engineering designs may necessitate a greater or lesser need for data acquisition as determined by the Planning Board. (c) Waivers affecting operation. Whenever any facility owner/generator seeks to vary any aspect of a facility's operation from the operating requirements of this ordinance, application may be made to the Planning Board for a special condition to the approval. (1) Criteria. The Planning Board may grant a waiver only when it finds that a facility will not contaminate any waters of the state, contaminate the ambient air, constitute a hazard to health and welfare, or create a nuisance, and, specifically, that compliance with the intent of the ordinance is affirmatively demonstrated. (2) Contents of application. Requests for a waiver properly submitted to the Planning Board shall include, but not be limited to: a. Identification of the specific provisions of these ordinances from which waiver is sought; b. The alternative operational procedure proposed and the reasons why it meets the intent of the ordinance; c. The reasons for which a waiver is requested, including the environmental, economic and technological justifications; and d. Any other relevant information the Planning Board may request or the applicant may wish to provide. (3) Term and renewal of conditions. The term of the waiver shall be concurrent with the term of the approval or for such lesser term as the Planning Board may specify. (d) 300-foot waiver. If the Planning Board shall determine from an examination of soil conditions, ground water characteristics, climatic conditions, topography, the nature and amount of the solid waste and other appropriate factor, that the deposit of solid waste within an area less than 300 feet from any classified body of surface water, will not result in an unlicensed direct or indirect discharge of pollutants to such body of surface water, it may, after notice and hearing, permit the deposit of solid waste within such area, upon such terms and conditions as it deems necessary. Permits issued pursuant to this section shall be for a term of not more than two years but maybe renewed for successive two-year terms after re-examination pursuant to this section. (e) Prohibitions. The Planning Board shall not grant a waiver for a new or expended solid waste disposal facility when that facility: (1) Overlies a significant sand and gravel aquifer as that term is defined in 38 M.R.S.A. § 1310-N (2-A) (A); or (2) When the proposed facility poses an unreasonable threat to the quality of a significant sand and gravel aquifer which it does not overlie; or (3) When the proposed facility poses an unreasonable threat to the quality of an underlying fractured bedrock aquifer as that term is defined in 38 M.R.S.A. § 1310-N (2-A)(B).

Ask a question about Old Town law

Corpus searches the Old Town sections it holds and shows the ones that match, with their citations. Free, no sign-in.