§ 16-20.6 — Requirements and standards
Revised Code of Ordinances, City of Old Town Maine (eCode360 publication OL4196 current through legislation adopted 2025-12-01 (imported 2026-11-16)) · Revised Code of Ordinances, City of Old Town Maine § 16-20.6
Corpus is an independent public-information project, not the official City of Old Town website. Stable reference: corpuslaw.us/code/81b66de7-6b29-4eaf-ba0b-e52cd83bdc0d
§ 16-20.6: Requirements and standards.
The enforcement authority shall determine if the following standards are met in accordance with Appendix 1. (a) Qualified professional. The Erosion and Sedimentation Control Plan has been prepared by a qualified professional. (b) Timing of installation and maintenance. The Erosion and Sedimentation Control Plan requires that erosion and sedimentation control BMPs shall be in place before construction begins, additional measures phased in if phasing is used, and shall be maintained until permanent stabilization is achieved. (c) Inspection. The Erosion and Sedimentation Control Plan provides for inspection of the site by the applicant to confirm that erosion and sedimentation control BMPs are in place and functioning. The Erosion and Sedimentation Control Plan also provides for corrective action if erosion is occurring or there is a discharge of sediment or turbid water from the construction site. (d) Spill prevention. The Erosion and Sedimentation Control Plan includes measures that prevent construction site pollution and spills from entering stormwater. (e) Groundwater protection. The Erosion and Sedimentation Control Plan restricts the storage or handling of liquid petroleum products and other hazardous materials that may drain to an "infiltration area." (f) Fugitive sediment and dust. The Erosion and Sedimentation Control Plan includes provisions to prevent erosion of soils, tracking or migration of soils into the right-of-way, discharge of sediment from the site, and fugitive dust emissions during or after construction. (g) Debris. The Erosion and Sedimentation Control Plan includes provisions to minimize the exposure of construction materials and waste to stormwater runoff and prevent them from migrating off-site. (h) Excavation dewatering. The Erosion and Sedimentation Control Plan must include provisions to remove or properly disperse the collected water in a manner that prevents sediment from entering stormwater. (i) Non-stormwater discharges. The Erosion and Sedimentation Control Plan minimizes non-stormwater discharges and, if non-stormwater discharges are allowed, they are identified in the Erosion and Sedimentation Control Plan with appropriate pollution measures for discharge.
Ask a question about Old Town law
Corpus searches the Old Town sections it holds and shows the ones that match, with their citations. Free, no sign-in.
