§ 16-4.4 — Industrial discharge permitting: existing connections
Revised Code of Ordinances, City of Old Town Maine (eCode360 publication OL4196 current through legislation adopted 2025-12-01 (imported 2026-11-16)) · Revised Code of Ordinances, City of Old Town Maine § 16-4.4
Corpus is an independent public-information project, not the official City of Old Town website. Stable reference: corpuslaw.us/code/f64c2572-3915-4ee9-8d1f-2d45f4895130
§ 16-4.4: Industrial discharge permitting: existing connections.
Any user required to obtain an industrial discharge permit who was discharging wastewater into the POTW prior to the effective date of this Part, and is not currently covered by a valid industrial discharge permit, and who wishes to continue such discharges in the future shall, within 60 days after said date, apply to the Superintendent for an industrial discharge permit in accordance with § 16-4.7 of this Part and shall not cause or allow discharges to the POTW to continue after 120 days of the effective date of this Part except in accordance with an industrial discharge permit issued by the Superintendent.
[ Ord. of 5-5-2008 ]
Ask a question about Old Town law
Corpus searches the Old Town sections it holds and shows the ones that match, with their citations. Free, no sign-in.
