§ 22A-8 — Supplemental permit application requirements
Revised Code of Ordinances, City of Old Town Maine (eCode360 publication OL4196 current through legislation adopted 2025-12-01 (imported 2026-11-16)) · Revised Code of Ordinances, City of Old Town Maine § 22A-8
Corpus is an independent public-information project, not the official City of Old Town website. Stable reference: corpuslaw.us/code/c3402d7f-275b-456a-9e88-f9864bd3aaae
§ 22A-8: Supplemental permit application requirements.
Applicants for a solid waste facility permit shall also provide the following supplemental information; provided, however, that for a proposed expansion of the West Old Town Landfill, this supplemental information shall be for both the solid waste landfill in existence at the time of application and the proposed expansion thereof, except that as to the requirements for Subsection (i), Waste characteristics (except for types of solid waste not listed in Exhibit 2), Subsection (m), Impact on existing uses and scenic character, Subsection (n), Water quality, and Subsection (p), Environmental monitoring program, such supplemental information shall be that related to the proposed expansion only. (a) An executive summary of the MDEP application(s) for the facility or expansion, demonstrating compliance with Maine solid waste laws and solid waste management rules. The applicant may submit relevant portions of the MDEP application in lieu of or along with the information requested herein. (b) Maps/surveys/aerial photography. (1) Location map: the most-recent U.S. Geological Survey topographic map (7 1/2-minute series) of the area, showing property boundaries and waste facility and expansion boundary. (2) A boundary survey made and certified by a Maine licensed land surveyor. (3) Maps. Maps no larger than 24 inches by 36 inches shall be submitted at an appropriate scale to show needed detail. Maps shall cover the area of development within the solid waste facility site and a minimum of 1,000 feet beyond in all directions. The boundaries of the area to be mapped, scale and contour intervals shall be determined in consultation with the CEO. The maps shall show the following as appropriate: name and address of owner; scale, North arrow, and date; property boundaries; and topography, existing and after closure. Within the area to be developed, the maps shall show roads, walkways, parking areas, and loading/unloading facilities; culverts; structures; streams, intermittent streams, water bodies and wetlands; cross-section lines; buffer zones; wells, springs, or any other source for private or public water supplies; utilities, existing and proposed; the proposed solid waste landfill and expansion boundary; zone districts; signs, fences and permanent outdoor fixtures; exterior lighting; easements and rights-of-way; and erosion and sedimentation control measures. (4) The proposed solid waste boundary of the landfill or expansion thereof and the property boundary shall be clearly outlined on one photo. (c) Financial and technical capacity. (1) A description of how the applicant will comply with the MDEP license requirements regarding financial capacity. (2) A statement of the applicant's prior experience or appropriate training, or both, relating to the construction and operation of the proposed solid waste facility or expansion. (3) A description of the personnel who will be employed to design, construct, operate and maintain the proposed solid waste facility or expansion. (4) A timeline for the permitting, construction, and commencement of operations at the solid waste facility or expansion and for closure activities at the solid waste facility and expansion. (d) Traffic. (1) An estimate of the number, weight (loaded and unloaded), and types of vehicles that will be transporting waste to and leachate from the facility and expansion, including the estimated number of trips per day for vehicles entering and/or leaving the facility and expansion. (2) A map clearly delineating existing and proposed haul routes (within City limits) to be used by vehicles serving or using the facility and expansion, describing legal weight limits and restrictions, such as winter road closures and seasonal weight limits for each road, if applicable. (3) A detailed plan describing procedures the applicant shall employ to discourage overweight vehicles from accessing the facility and expansion and to prevent vehicles carrying leachate from the facility and expansion from exceeding applicable vehicle weight limits. The plan shall include the applicant's maintenance of a quarterly overweight truck log as provided in § 22A-14(l). The plan shall also include measures to minimize litter and nuisance odor from trucks and vehicles hauling solid waste and/or leachate to and from the facility and expansion. (4) An identification of all sections of roads, bridges and intersections along existing and projected haul routes within the City limits that are: a. Congested locations, which shall include at least the area known as the City's "downtown"; and/or b. Not rated to handle the weights or types of vehicles expected to transport solid waste and leachate to or from the facility. Identification of vehicle routing decisions that were made based on these limitations and a description of any corrective actions the applicant proposes to take (5) A Maine Department of Transportation inventory and analysis of traffic accidents on roads and at intersections on any proposed haul routes within a quarter mile of the Facility and expansion entrances and exits during the most-recent three-year period, or an equivalent study. The inventory must include identification of high accident locations within the City limits and identification of feasible countermeasures based on discernible accident patterns at any high accident location. (6) Sight distances at the proposed solid waste facility and expansion entrances and exits and a design guide copy of the Maine Department of Transportation entrance permit, if applicable, or, if the solid waste facility and expansion entrance is not located on a state-supported highway, evidence that a qualified professional has certified that safe sight distances will exist in all directions. This review must be conducted in conformance with the standards specified in "A Policy on Geometric Design of Highways and Streets," American Association of State Highway and Transportation Officials (1994), and the "Highway Design Guide," Maine Department of Transportation (September 1990). (7) A traffic study, if required by the Planning Board. The Planning Board will require a traffic study if the application does not contain sufficient information to determine that all of the traffic standards of this chapter will be met. A traffic study may also be required to evaluate whether there are modifications the applicant could make that might enable the applicant to comply with a traffic standard otherwise not met. The Planning Board's determination that a traffic study is required may be based on information or comments provided by the Maine Department of Transportation (MDOT). A decision on the need for a traffic study may be delayed until after review by the Planning Board's traffic consultant or the public hearing. The applicant may be required to supplement or update traffic information, including a traffic study, at any time during the permit review process if the Planning Board determines that a supplement or update is necessary to evaluate the application under the traffic criteria of this chapter. (8) Elements of a traffic study. The year for which the study results are to be characterized is the projected first year of full operation. If the proposed solid waste facility or expansion is a multi-phase project with a projected completion date more than five years after the year of the study, the Planning Board may require that the study results be characterized for the year that corresponds to the opening of the first major phase or to the timing of transportation system improvements, such as a major bridge construction project. The Planning Board may narrow the scope of the traffic study to particular roads or areas, if concerns are limited to particular roads, intersections or areas of the City. The traffic study must contain the following, unless otherwise provided by the Planning Board: a. A regional map showing the solid waste facility and expansion, and proposed haul routes to and from the facility on City streets and state highways within the City limits for the vehicles that will use or serve the facility. b. A description of existing traffic conditions and anticipated traffic increases from sources other than the solid waste facility and expansion that are likely to occur in the vicinity of the proposed solid waste facility or expansion during the study period. At a minimum, the study must identify development or redevelopment proposals which have been approved, either locally or by the Department, and development or redevelopment proposals for which complete applications have been filed with and accepted by the City or the Department at the time of the traffic study. c. Trip generation calculations for the solid waste facility and expansion and for other proposed development and redevelopment projects in the vicinity of the facility. If data from the "Trip Generation Guide" of the Institute of Transportation Engineers is not available, trip generation must be estimated in accordance with a methodology approved by the Planning Board. d. A diagram of the traffic volume on roads and intersections in the vicinity of the solid waste facility and expansion for both the estimated annual average daily traffic and the a.m./p.m. peak-hour traffic, including turns during the peak hour. Traffic diagrams must show the following: 1. Traffic attributable to the facility and other developments, including a description of the types of traffic. 2. Existing traffic volume. All traffic counts must be actual counts whenever possible. Traffic counts from the MDOT may be used if not more than two years old. 3. Projected traffic volume for the hours required above at the time the facility will begin full operation. 4. Documentation, including all new traffic counts and analysis worksheets, as to how the various volumes were derived. e. A capacity analysis to determine the level of service for each road and intersection in the vicinity of the solid waste facility and expansion and an analysis of the physical condition and ability of each such road to accommodate the volume and types of existing and anticipated traffic. Capacity calculations must be made for the 30th-highest hour of traffic during the year that the facility or expansion would begin operation, or any other appropriate design hour approved by the Planning Board. Where it is shown that the capacity analysis methodology will not accurately measure operating conditions or levels of service at a road or intersection, the Planning Board may require the applicant to analyze the operating conditions of an intersection or road using another methodology acceptable to the Planning Board. The capacity and physical condition and ability to accommodate traffic analysis must take into consideration the volume and types of existing and anticipated traffic, with reference to the anticipated weight, types and dimensions of vehicles hauling to and from the facility and expansion. f. The need for new traffic signals in the vicinity of the proposed solid waste facility and expansion must be analyzed using the warrants in the Manual on Uniform Traffic Control Devices, U.S. Department of Transportation, Federal Highway Administration (1988). Although an intersection may meet the MUTCD warrants, the Planning Board may determine that a signal is not appropriate on a City street. g. If the traffic study indicates that unsatisfactory levels of service or unsafe conditions exist or will occur at intersections or on roads in the vicinity of the proposed solid waste facility and expansion, a description of the measures recommended to correct the deficiencies, including the following: 1. Recommended improvements: a description and diagram of the location, nature, and extent of recommended improvements to roads and intersections in the vicinity of the proposed solid waste facility and expansion. Accompanying this list of improvements must be preliminary cost estimates. Of the recommended improvements, those proposed for implementation must be identified. 2. Capacity analysis after improvement: a description of the anticipated results of making these improvements. h. A clear, concise summary of the study findings. (e) Utilities. Evidence that the applicant has made adequate provision for utilities to furnish service at the required design usage, including water supplies, sewerage facilities, electricity, and solid waste disposal, and that any public utilities have adequate capacity to provide necessary services and are willing to do so. (f) Fugitive dust and odors. (1) Identify any sources or potential sources of nuisance odors from the facility and expansion. (2) Describe methods for monitoring, managing and controlling landfill odors and landfill gas. Estimate the area that would be affected by nuisance odors, based on general experience in dealing with the material or process that is the source of the odors and other available information, such as studies or journals. (3) Describe proposed systems for enclosure of nuisance odor-producing materials and processes, and proposed uses of technology to contain, control and/or eliminate odors. (4) Describe proposed methods for detecting and measuring odors to demonstrate control of nuisance odor and that the occurrence of nuisance odor from the facility and expansion will not unreasonably adversely affect air quality. ASTM E679-91 Standard Practice for Determination of Odor and Taste Thresholds by a Forced Choice Ascending Concentration Series Method of Limits, Current Ed., published October 1991, shall be used for guidance on the detection, measurement and control of nuisance odors and is adopted by reference; a copy is on file in the City Clerk's office. (5) Describe the actions the applicant will undertake to control fugitive dust from the solid waste facility and expansion so that fugitive dust will not unreasonably adversely affect air quality and of the actions to be taken if a problem attributable to the facility and expansion occurs beyond the property boundary. (g) Litter control. (1) A description of potential sources of litter at the facility and expansion, including, but not limited to, recycling or composting facilities and the working face of a landfill, and of proposed litter control measures, such as litter control fencing, berms, daily cover, monitoring, and periodic cleanup of litter. (2) A description of measures that will minimize litter from being carried off site by vehicles used to transport solid waste to and from the facility and expansion. (h) Vector and bird control. (1) A description of measures that will be used to minimize the facility and expansion's on-site population of disease vectors. (2) A description of the proposed bird control plan, which shall include a plan responding to bird habitation to various control methods. (i) Waste characteristics. (1) A summary of anticipated waste types and an estimate of the tonnage of each type of waste material to be received at the solid waste facility and expansion on an annual basis for the term of the permit. (2) A summary of the approved hazardous and special waste handling and exclusion plan, including a description of methods or procedures used to detect, identify, handle, store and transport special and hazardous wastes. (3) A description of the composition of the leachate to be generated at the facility and the expansion and how it will be handled, stored on site and transported. (4) A leachate disposal plan, including a contingency plan for handling leachate if the preferred leachate disposal facility is unavailable, addressing potential short-term and long-term interruptions in leachate disposal. (j) Noise. A description of the existing hourly sound levels at the facility site and the anticipated sound levels both within the solid waste facility site and at the property boundary and at any protected location. The applicant shall specify the sources and types of anticipated sounds, including sound from machinery, equipment and motor vehicles, and any environmental noise control devices available to reduce anticipated noise levels, both on site and at the property boundaries. (k) Air quality. Demonstrate that the proposed facility and expansion will comply with state and federal permit requirements regulating air emissions, and how the facility and expansion will limit adverse impacts from landfill gases, monitor landfill gases, and report on management activities undertaken. (l) Liability insurance. (1) A description of how the applicant will comply with the MDEP license requirements regarding liability insurance, which except public entities from having to provide proof of liability insurance. (2) Liability insurance policies shall provide for endorsements that contain conditions equivalent to the following: a. The insurer shall furnish the City Manager a signed duplicate original of the policy and all endorsements; b. Cancellation of the insurance policy, including any endorsements, whether by the insurer or the insured, shall be effective only after the expiration of 60 days after a copy of the written notice is received by the City Manager; and c. Any other termination of the insurance policy, including any endorsements, will be effective only upon written notice and only after the expiration of 30 days after a written copy of the notice has been received by the City Manager. d. A "claims made" liability insurance policy must include an endorsement providing for a discovery period of at least 12 months beyond the date of expiration or cancellation of the policy and for notice to the City Manager. (m) Impact on existing uses and scenic character. An analysis of the visual impact of the proposed facility or expansion on the existing uses and scenic character of the existing site, surrounding and neighboring properties and views in the vicinity, including views from public viewing areas that are impacted by the proposed facility or expansion, including at least the following: (1) Presentation of the facility or expansion layout, operations, methodology and sequencing options considered during the design process and the presentation of vistas and views from public viewing areas that are impacted by the proposed facility or expansion, to illustrate the analysis. (2) A description of the existing condition of the facility or expansion site and the vicinity around it, covering the area within 2,000 feet of the property boundary. This description shall include, at a minimum, terrain, vegetation, habitats, existing land uses, existing views from public viewing areas that are impacted by the proposed facility or expansion, and natural resources and how the facility or expansion will be consistent with these existing features and uses. (3) Describe the height of the proposed landfill mound at various stages of development and at the peak elevation, the use of daily and final cover and screening berms, consistent with the surrounding vegetation and terrain, nearby buildings, and views from public viewing areas that are impacted by the proposed facility or expansion. (4) A summary of the existing land uses in the vicinity of the proposed facility or expansion, including designated historic sites and protected locations. (5) The nature, location, design, and size of all buffers and visual screens within those buffers considered, retained, established or implemented in the design of the proposed facility or expansion. (n) Water quality. Demonstrate that the proposed facility or expansion will comply with the state and federal permit requirements minimizing groundwater and surface water pollution. (o) Compliance record. (1) The full name, business address, home address, date of birth, and/or federal employer identification number of the applicant, and a summary of the Maine DEP application pertaining to the civil or criminal records of the applicant (owner and operator) or any person having a legal interest in the application for the facility and expansion, as required by § 12, Criminal or Civil Records, of Chapter 400 of the Code of Maine Rules. All such information shall be supplemented as necessary for the information to be current. (2) The full name and business address of any company which collects, transports, treats, stores, or disposes of solid waste or hazardous waste in which the applicant holds an equity interest of 5% or more. (3) A listing and explanation of administrative consent agreements or consent decrees entered into by the applicant, including the operator, for violations of environmental laws administered by MDEP, the State of Maine, other New England states, the State of New York, or the United States or another country in the five years immediately preceding the filing of the application. (4) If a permit is issued, the submittal requirements of this § 22A-8(o) shall be considered an ongoing obligation of the permit holder and shall be updated annually. (p) Environmental monitoring program. A narrative describing the monitoring program for the facility or expansion, including what will be monitored, monitoring methodology and monitoring frequency; copies of applicable state and federal permits concerning environmental monitoring requirements; and a statement detailing how the applicant will comply with permit requirements. (q) Hours of operation. A description of the normal hours of operation of the facility and expansion and of any circumstances that might require extending those hours. (r) Operations and maintenance manual. A copy of the solid waste facility's and expansion's operations and maintenance manual approved by MDEP.
[ Ord. of 7-6-2015 ]
Ask a question about Old Town law
Corpus searches the Old Town sections it holds and shows the ones that match, with their citations. Free, no sign-in.