For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12-111 — Disposal of construction and demolition debris generated within the city

Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances § 12-111

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/94c6a170-9b4e-4ae1-9992-30b768192fb3

Sec. 12-111. Disposal of construction and demolition debris generated within the city.

(a) Construction and demolition debris to go to city facility. All construction and demolition debris generated within the city shall be disposed of at the city construction and demolition debris disposal facility until such time as the city receives written notification from Regional Waste Systems that RWS is accepting construction and demolition debris pursuant to the terms of the demolition materials handling agreement. After the city receives the notice and gives thirty (30) days prior notice to waste haulers, all construction and demolition debris shall be disposed of at the RWS construction and demolition debris disposal facility. Subparts (b), (c), (d) and (e) of this section 12-111 shall remain effective until thirty (30) days following receipt of notification to the haulers by the city that all construction and demolition debris shall be disposed of at the RWS construction and demolition debris disposal facility. (b) Permit required. No person shall collect, recycle, haul or transport construction and demolition debris without first obtaining a construction and demolition debris disposal facility permit as described in this section. (1) All persons who obtain a building or demolition permit from the city shall simultaneously obtain a construction and demolition debris disposal facility permit from the office of building inspections. This requirement shall not apply to a residential homeowner whose project will create three (3) cubic yards or less of construction and demolition debris. (2) Prior to the issuance of a building or demolition permit, the city's building inspector or his designee shall inspect the premises for which the building or demolition permit is sought to determine whether hazardous or special wastes are present on the premises; if hazardous or special wastes are present on the premises, the parties seeking the building or demolition permit must furnish the city with evidence of lawful disposal of the hazardous or special wastes in order to receive the building or demolition permit and construction and demolition debris disposal facility permit. (3) In any case where the city issued a building or demolition permit before the effective date of paragraph (b)(1) above, the construction and demolition debris disposal facility permit must be purchased from the public works authority by the person transporting the waste or the waste generator. (4) The demolition debris disposal facility permit shall authorize the person to whom it is issued to dispose of construction and demolition debris from the premises for which the building or demolition permit is issued, at the city construction and demolition debris disposal facility. (c) Permit fee. The fee for the initial construction and demolition debris disposal permit shall be calculated by the office of building inspections on a case-by-case basis. It shall depend on fees established by council order. The fee shall be nonrefundable. The disposal permit shall authorize the permittee to dispose of a specified amount of waste at the city construction and demolition debris disposal facility and shall only be valid for the amount stated on the face of the permit. If the amount of the original permit is too low, the permit holder shall purchase a subsequent permit or permits from the public works authority. If the amount of disposal authorized by the original permit or subsequent permits is too high, the permit owner may obtain a transferable credit from the public works authority for future disposal at the city construction and demolition disposal facility so long as the building inspector has issued a certificate of occupancy or completion and the owner applies within two (2) months of the date upon which the building inspector's certificate was issued. The maximum credit allowed will be fifty (50) percent of the total amount paid for construction and demolition debris permits for the project. (d) Sorting requirement. At any site for which a building permit is issued, any person or entity that owns or controls the site must sort the waste generated by any construction project on the site in such a manner that acceptable solid waste, metal, and construction and demolition debris without metal, are distinct and can be separately moved. Under no circumstances may these types of waste be mixed in any type of disposal container or in any vehicle. All sorting must be done at the generation site. The metal sorting requirement does not apply to nails and other fastening devices made out of metal. Wood waste may be separated and recycled at the discretion of the generator if it is unacceptable waste. Metal waste may be recycled at the discretion of the generator if it is unacceptable waste. The city may allow clean inert fill to be disposed of at a location designated by the city without a fee providing that applicants receive prior written approval from the city's public works authority. (e) Rejected loads. The city's public works authority is the only authority to designate a load of demolition debris as unacceptable for disposal at the city's construction and demolition debris disposal facility. If a load is rejected, the public works authority will retain the transporter's trip ticket or coupon and give the waste transporter a reasonable opportunity to bring the load into compliance. If the load is not brought into compliance, the ticket or coupon and the value that it represents shall be forfeited to the city, and the transporter shall be given permission to take the load out of the city. (f) Controlling provisions. To the extent that any of the provisions in this article are inconsistent with the demolition materials handling agreement entered into between the city and RWS, the provisions of the agreement shall control, except that any provisions requiring disposal at the RWS construction and demolition debris disposal facility shall not control until RWS is accepting construction and demolition debris at such facility pursuant to the terms of the demolition materials handling agreement.

(Ord. No. 192A-93, 1-25-93)

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.