§ 12.4 — Flood Hazard Development Permit

Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances, Land Use Code § 12.4

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/bc781ea7-b0aa-4011-9611-8866191cba55

12.4 FLOOD HAZARD DEVELOPMENT PERMIT

12.4.1 Permit required A. The Zoning Administrator shall be designated as the local floodplain administrator. The floodplain administrator shall have the authority to implement the commitment made to administer and enforce the requirements for participation in the National Flood Insurance Program. B. Before any construction or other development as defined Subsection 12.3.2, including the placement of manufactured homes, begins within any areas of special flood hazard, a Flood Hazard Development Permit shall be obtained from the Building Authority, except as established in Section 12.5. This permit shall be required prior to issuance of a building permit, if one is required, and shall be in addition to any other permit, site plan, and subdivision review which may be required pursuant to the codes and ordinances of the City of Portland. If only a site plan is required for a development, the Flood Hazard Development Permit shall be obtained prior to approval of the site plan. 12.4.2 Filing of application The application for a Flood Hazard Development Permit shall be submitted in writing to the Building Authority and shall include the following: A. A final site plan, where applicable, showing information as required by Article 13. B. A final subdivision plat, where applicable, providing information as required in Article 14. C. The name, address, and phone number of the applicant, owner, and contractor. D. A map with address indicating the location of the development site. E. A plan showing the location of existing and proposed development, including but not limited to specific dimensions of existing and proposed structure(s), wastewater disposal facilities, water supply facilities, areas to be cut and filled, and the dimensions of the lot. F. A statement of the intended use of any structure and/or development. G. A statement of the cost of the development including all materials and labor. H. A statement of the type of wastewater disposal system proposed. I. Specification of dimensions of the proposed structure and/or development. J. For new construction and substantial improvements, the elevation in relation to the National Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD), or to a locally established datum for Zone A only, of the: 1. Base flood at the proposed site of all new or substantially improved structures, which is determined: a. In Zones AE, AO, AH, , and VE from data contained in the Flood Insurance Study — Cumberland County, Maine. b. In Zone A: i. From any base flood elevation data from federal, state, or other technical sources (such as FEMA’s Quick-2 model, FEMA 265), including information obtained pursuant to Subsection 12.4.5(M) and 12.4.4.(B)4, or ii. In the absence of all data described in Subsection 12.4.2(J)(1)(b)(i), information to demonstrate that the structure shall meet the elevation requirement in Subsections 12.4.5(H)(4)(b), 12.4.5(I)(4)(b), or 12.4.5(J)(4)(b). 2. Highest and lowest grades at the site adjacent to the walls of the proposed building. 3. Lowest floor, including basement, and whether or not such structures contain a basement. 4. Lowest machinery and equipment servicing the building. 5. Level, in the case of nonresidential structures only, to which the structure will be floodproofed. K. For new construction and substantial improvements, a description of an elevation reference point established on the site of all new developments for which elevation standards apply as required in Subsection 12.4.5. L. For new construction and substantial improvements, a written certification by: 1. A professional land surveyor that the grade elevations shown on the application are accurate. 2. A professional land surveyor, registered professional engineer or architect that the base flood elevation shown on the application is accurate M. For new construction and substantial improvements, the following certifications as required in Subsection 12.4.5 by a registered professional engineer or architect: 1. A floodproofing certificate (FEMA form FF-206-FY-22-153, as amended) to verify that the floodproofing methods for any nonresidential structures will meet the floodproofing criteria of Subsection 12.4.5(I); and other applicable standards of Subsection 12.4.5. 2. A V-Zone Certificate to verify that the construction in coastal high hazard areas, Zones VE and Coastal AE, will meet the criteria of Subsection 12.4.5(R); and other applicable standards in Subsection 12.4.5. 3. A Hydraulic Openings Certificate to verify that engineered hydraulic openings in foundation walls will meet the standards of Subsection 12.4.5(N)(2)(a) N. A certified statement from a registered professional engineer or architect that bridges will meet the standards of Subsection 12.4.5(O) O. A certified statement from a registered professional engineer or architect that containment walls will meet the standards of Subsection 12.4.5(P). P. A description of the extent to which any watercourse will be altered or relocated as a result of the proposed development. Q. A statement of construction plans describing in detail how each applicable development standard in Subsection 12.4.5 will be met. R. Cross section(s) of the site acceptable to the Public Works Authority. 12.4.3 Fee A nonrefundable Flood Hazard Development Permit fee as established by the City Council for all minor development and for all new construction and substantial improvements shall be paid to the Building Authority, and a copy of a receipt for the same shall accompany the application. An additional fee may be charged if the Code Enforcement Officer, Planning Board, and/or Board of Appeals needs the assistance of a professional engineer or other expert. The expert’s fee shall be paid in full by the applicant within 10 days after the City submits a bill to the applicant. Failure to pay the bill shall constitute a violation of the ordinance and be grounds for issuance of a stop work order. An expert shall not be hired by the City at the expense of an applicant until the applicant has either consented to such hiring in writing or been given an opportunity to be heard on the subject. An applicant who is dissatisfied with a decision to hire expert assistance may appeal that decision to the Board of Appeals. 12.4.4 Review procedure A. Upon determination by the Building Authority that an application is complete, the Building Authority shall coordinate review of the application by the City to assure that proposed developments are reasonably safe from flooding. No permit shall be issued until the Building Authority finds that the development proposal is in compliance with the standards of this article. Compliance with the provisions of this article shall be required prior to beginning any development as defined herein. B. The Building Authority shall, when reviewing subdivisions under Article 14 and other proposed developments that require review under Article 13 or federal law, state law, or local ordinances or regulations and all projects on five or more acres, or in the case of manufactured home parks divided into two or more lots, assure that: 1. All such proposals are consistent with the need to minimize flood damage. 2. All public utilities and facilities, such as sewer, gas, electrical and water systems are located and constructed to minimize or eliminate flood damages. 3. Adequate drainage is provided so as to reduce exposure to flood hazards. 4. All proposals include base flood elevations, flood boundaries and, in a riverine floodplain, floodway data. These determinations shall be based on engineering practices recognized by the Federal Emergency Management Agency. 5. Any proposed development plan must include a condition of plan approval requiring that structures on lots in the development be constructed in accordance with Subsection 12.4.5 of this article. Such requirement shall be included in any deed, lease, purchase and sale agreement, or document transferring or expressing an intent to transfer any interest in real estate or structure, including but not limited to a time-share interest. The condition shall clearly articulate that the municipality may enforce any violation of the construction requirement. The construction requirement shall also be clearly stated on any map, plat, or plan as part of the approval process. C. In the review of all Flood Hazard Development Permit applications for compliance with the standards herein: 1. The Building Authority shall utilize: a. The base flood and floodway data contained in the Flood Insurance Study – Cumberland County, Maine, as described in Section 12.2. b. In special flood hazard areas where base flood elevation and floodway data are not provided in the above cited study, the Building Authority shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from federal, state, or other technical sources, including information obtained pursuant to Subsection 12.4.2(J)(1)(b)(i), 12.4.5(M), and 12.4.4(B)(4), in order to administer this article. c. When a base flood elevation is established in a Zone A by methods outlined in Section 12.4.2(J)(1)(b)(ii), that data shall be submitted to the Maine Floodplain Management Program. 2. The Building Authority shall make interpretations of the location of boundaries of special flood hazard areas shown on the maps described in Section 12.2. 3. Prior to approval of issuance of the Flood Hazard Development Permit, the Building Authority shall determine that all necessary permits have been obtained from those federal, state, and local authorities from which prior approval is required by federal or state law, including but not limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972 (33 U.S.C. 1344 as may be amended from time to time), provided, however, that conditional approval may be granted pending proof of receipt of any required permits, but no Flood Hazard Development Permit shall be finally issued until proof of issuance of all such other permits is received by the Building Authority. 4. The Building Authority shall notify adjacent municipalities, the Maine Department of Environmental Protection and the Maine Floodplain Management Program, prior to any alteration or relocation of a watercourse, and submit copies of such notifications to the Federal Emergency Management Agency. 5. The Building Authority shall maintain, as a permanent record, copies of all Flood Hazard Development Permit applications, corresponding permits issued, and data relevant thereto, including reports of the Board of Appeals on variances granted under the provisions of Section 12.7 of this article, and copies of elevation certificates, floodproofing certificates, certificates of compliance, and certifications of design standards required under the provisions of Sections 12.4 and 12.6. 12.4.5 Review standards All development in areas of special flood hazard shall meet the following standards: A. All development. All development shall: 1. Be designed or modified and adequately anchored to prevent flotation (excluding piers and docks), collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. 2. Use construction materials that are resistant to flood damage. 3. Use construction methods and practices that will minimize flood damage. 4. Use electrical, heating, ventilation, plumbing, and air conditioning equipment, and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during flooding conditions. B. Water supply. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the systems. C. Sanitary sewage systems. All new and replacement sanitary sewage systems shall be designed and located to minimize or eliminate infiltration of flood waters into the system and discharges from the system into flood waters. D. On-site waste disposal systems. On site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during floods. E. Altered or relocated watercourses. All development associated with altered or relocated portions of a watercourse shall be constructed and maintained in such a manner that no reduction occurs in the flood carrying capacity of the watercourse. F. Utilities. New construction or substantial improvement of any structure (including manufactured homes) located within: 1. Zones A, AE, AO, and AH shall have the bottom of all electrical, heating, plumbing, ventilation and air conditioning equipment, permanent fixtures and components, HVAC ductwork and duct systems, and any other utility service equipment, facilities, machinery, or connections servicing a structure, elevated to at least two feet above the base flood elevation. 2. Zone VE shall meet the requirements of Subsection 12.4.5(R)(2)(a). G. Physical changes to the natural landscape. Certain development projects, including but not limited to, retaining walls, sea walls, levees, berms, and rip rap, can cause physical changes that affect flooding conditions. 1. All development projects in Zones AE, Coastal AE, and VE that cause physical changes to the natural landscape shall be reviewed by a qualified professional to determine whether or not the project changes the base flood elevation, zone, and/or the flood hazard boundary line. For the purposes of this article, qualified professional shall mean an individual either licensed by the State of Maine or qualified in another manner to perform the specified work in accordance with all applicable design standards and codes, and whose qualifications indicate that the work as designed and as performed will not increase flood risk to public safety. If the qualified professional is not licensed by the State of Maine, the local permitting authority shall request that the qualified professional identify their qualifications in writing. a. If the qualified professional determines, through the use of standard practices, that the project would not necessitate a Letter of Map Revision (LOMR), a certified statement shall be provided. b. If the qualified professional determines that the project may cause a change, a hydrologic and hydraulic analysis that meets current FEMA standards shall be performed. 2. If the hydrologic and hydraulic analysis performed indicates a change to the base flood elevation, zone, and/or the flood hazard boundary line, the applicant may submit a Conditional Letter of Map Revision (C-LOMR) request to the Federal Emergency Management Agency for assurance that the as-built project will result in a change to the Flood Insurance Rate Map. Once the development is completed, a request for a Letter of Map Revision (LOMR) shall be initiated; or 3. If the hydrologic and hydraulic analysis performed show a change to the base flood elevation, zone, and/or the flood hazard boundary line, as soon as practicable, but no later than six months after the completion of the project, the applicant shall submit the technical data to FEMA in the form of a Letter of Map Revision request. H. Residential. New construction or substantial improvement of any residential structure located within: 1. Zones AE, AO, and AH shall have the lowest floor (including basement) elevated to at least two feet above the base flood elevation. 2. Zones AO and AH shall have adequate drainage paths around structures on slopes, to guide flood water away from the proposed structures. 3. Zone AO shall have the lowest floor (including basement) elevated above the highest adjacent grade: a. At least two feet higher than the depth specified in feet on the Flood Insurance Rate Map, or b. At least three feet if no depth number is specified. 4. Zone A shall have the lowest floor (including basement) elevated: a. To at least two feet above the base flood elevation utilizing information obtained pursuant to Subsections 12.4.2(J)(1)(b)(i))(), 12.4.4(C), or 12.4.4(B)(4), or b. In the absence of all data described above, to at least two feet above the highest adjacent grade to the structure. 5. Zones VE and Coastal AE shall meet the requirements of Subsection 12.4.5(R). I. Nonresidential. New construction or substantial improvement of any nonresidential structure located within: 1. Zones AE, AO, and AH shall have the lowest floor (including basement) elevated to at least two feet above the base flood elevation, or together with attendant utility and sanitary facilities shall: a. Be floodproofed to at least two feet above the base flood elevation so that below that elevation the structure is watertight with walls substantially impermeable to the passage of water; b. Have structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy; and c. Be certified by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this section. Such certification shall be provided with the application for a Flood Hazard Development Permit, as required by Subsection 12.4.2(M)(N), and (O) and shall include a record of the elevation above mean sea level to which the structure is floodproofed. b. In the absence of all data described in Subsection 12.4.5(I)(4)(a), to at least two feet above the highest adjacent grade to the structure, or c. Together with attendant utility and sanitary facilities, be floodproofed to two feet above the base elevation established in Subsection 12.4.5(I)(4)(a) or (b) above and meet the floodproofing standards of Subsection 12.4.5(I)(1)(a), (b), and (c). 5. Zones VE and Coastal AE shall meet the requirements of Subsection 12.4.5(R). J. Manufactured homes. New or substantially improved manufactured homes located within: 2. Zones AO and AH shall have adequate drainage paths around structures on slopes, to guide flood water away from the proposed structures. 3. Zone AO shall have the lowest floor (including basement) elevated above the highest adjacent grade: a. At least two feet higher than the depth specified in feet on the Flood Insurance Rate Map; or b. At least three feet if no depth number is specified; or c. Together with attendant utility and sanitary facilities be floodproofed to meet the elevation requirements of this subsection and floodproofing standards of Subsection 12.4.5(I). 4. Zone A shall have the lowest floor (including basement) elevated: a. To at least two feet above the base flood elevation utilizing information obtained pursuant to Subsections 12.4.2(K)(1)(b)(i), 12.4.4(C), 12.4.4(B)(4); or 1. Zones AE, AO, and AH shall: a. Be elevated such that the lowest floor is at least two feet above the base flood elevation; b. Be on a permanent foundation, which may be poured masonry slab or foundation walls, with hydraulic openings, or may be reinforced piers or block supports, any of which support the manufactured home so that no weight is supported by its wheels and axles; and c. Be securely anchored to an adequately anchored foundation system to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to: i. Over the top ties anchored to the ground at the four corners of the manufactured home, plus two additional ties per side at intermediate points (manufactured homes less than 50 feet long require one additional tie per side). ii. Frame ties at each corner of the home, plus five additional ties along each side at intermediate points (manufactured homes less than 50 feet long require four additional ties per side). iii. All components of the anchoring system shall be capable of carrying a force of 4,800 pounds. 2. Zones AO and AH shall have adequate drainage paths around structures on slopes, to guide flood water away from the proposed structures. 3. Zone AO shall have the lowest floor (including basement) elevated above the highest adjacent grade: a. At least two feet higher than the depth specified in feet on the Flood Insurance Rate Map, or b. At least three feet if no depth number is specified, and c. Meet the anchoring requirements of Subsection 12.4.5(J)(1)(c). 4. Zone A shall: a. Be elevated on a permanent foundation, as described in Subsection 12.4.5(J)(1)(b), such that the lowest floor (including basement of the manufactured home is at least two feet above the base flood elevation utilizing information obtained pursuant to Subsection 12.4.2(J)(1)(b)(i), 12.4.4(C), or 12.4.4(B)(4), or b. In the absence of all data described in Section 12.4.5(J)(4)(a), to at least two feet above the highest adjacent grade to the structure, and c. Meet the anchoring requirements of Subsection 12.4.5(J)(1)(c). 5. Zones VE and Coastal AE shall meet the requirements of Subsection 12.4.5(R). K. Recreational vehicles. Recreational vehicles located within: 1. Zones A, AE, AO, and AH shall either: a. Be on the site for fewer than 180 consecutive days, and b. Be fully licensed and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only be quick disconnect type utilities and security devices, and has no permanently attached additions, or c. Be permitted in accordance with the elevation and anchoring requirements for manufactured homes in Subsection 12.4.5(J)(1). 2. Zones VE and Coastal AE shall meet the requirements of either Subsection 12.4.5(K)(1)(a) and(b), or 12.4.5(R). L. Accessory structures. New construction or substantial improvement of accessory structures, as defined in Subsection 12.3.1, shall be exempt from the elevation criteria required Subsections 12.4.5(H) and (I) if all other requirements of Subsection 12.4.5 and all the following requirements are met. 1. Accessory structures located within Zones A, AE, AO, AH shall: a. Meet the requirements of Subsection 12.4.5(A)(1) to (4) as applicable. b. Be limited in size to a one-story two-car garage. c. Have unfinished interiors and not be used for human habitation. d. Have hydraulic openings, as specified in Subsection 12.4.5(N)(2), in at least two different walls of the accessory structure. e. Be located outside the floodway. f. When possible be constructed and placed on the building site so as to offer the minimum resistance to the flow of flood waters and be placed further from the source of flooding than is the primary structure. g. Have only ground fault interrupt electrical outlets. The electric service disconnect shall be located above the base flood elevation and when possible outside the special flood hazard area. h. Be located outside the Coastal AE Zone. 2. Accessory structures in Zones VE and Coastal A shall meet the requirements of Subsection 12.4.5(R). M. Floodways 1. In Zone AE riverine areas, encroachments, including fill, new construction, substantial improvement, and other development shall not be permitted within a regulatory floodway designated on the Flood Insurance Rate Map unless a technical evaluation certified by a registered professional engineer is provided demonstrating that such encroachments will not result in any increase in flood levels within the city during the occurrence of the base flood discharge. 2. In Zones A and AE riverine areas for which no regulatory floodway is designated, encroachments, including fill, new construction, substantial improvement, and other development shall not be permitted in the floodway as determined in (3) below, unless a technical evaluation certified by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing development and anticipated development: a. Will not increase the water surface elevation of the base flood more than one foot at any point within the city. b. Is consistent with the technical criteria contained in FEMA’s guidelines and standards for flood risk analysis and mapping. 3. In Zones A and AE riverine areas for which no regulatory floodway is designated, the regulatory floodway is determined to be the channel of the river or other watercourse and the adjacent land areas to a distance of 1/2 the width of the floodplain as measured from the normal high-water mark to the upland limit of the floodplain. Encroachments, including fill, new construction, substantial improvement, and other development shall not be permitted unless a technical evaluation certified by a registered professional engineer is provided meeting the requirements of (2) above. N. Hydraulic openings/flood vents. New construction or substantial improvement of any structure in Zones A, AE, AO, and AH that meets the development standards of Subsection 12.4.5, including the elevation requirements of Subsection 12.4.5(H), (I), or (J) and is elevated on posts, columns, piers, piles, or crawl spaces may be enclosed below the base flood elevation requirements provided all the following criteria are met or exceeded: 1. Enclosed areas are not basements as defined in Article 3. 2. Enclosed areas shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of flood water. Designs for meeting this requirement must either: a. Be engineered and certified by a registered professional engineer or architect, or b. Meet or exceed the following minimum criteria: i. A minimum of two openings having a total net area of not less than one square inch for every square foot of the enclosed area; ii. The bottom of all openings shall be below the base flood elevation and no higher than two feet above the lowest grade. iii. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the entry and exit of flood waters automatically without any external influence or control such as human intervention, including the use of electrical and other non-automatic mechanical means. 3. The enclosed area shall not be used for human habitation. 4. The enclosed areas are usable solely for building access, parking vehicles, or storing of articles and equipment used for maintenance of the building. O. Bridges. New construction or substantial improvement of any bridge in Zones A, AE, AO, AH, and VE shall be designed such that: 1. When possible, the lowest horizontal member (excluding the pilings, or columns) is elevated to at least two feet above the base flood elevation. 2. A registered professional engineer shall certify that: a. The structural design and methods of construction shall meet the elevation requirements of this section and the floodway standards of Subsection 12.4.5(M). b. The foundation and superstructure attached thereto is anchored to resist flotation, collapse, and lateral movement due to the effects of wind and water loads acting simultaneously on all structural components. Water loading values used shall be those associated with the base flood. P. Containment walls. New construction or substantial improvement of any containment wall shall meet the following requirements by zone: 1. Zones A, AE, AO, AH, and VE shall: a. Have the containment wall elevated to at least two feet above the base flood elevation; b. Have structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. c. Be certified by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this section. Such certification shall be provided with the application for a Flood Hazard Development Permit, as required by Subsection 12.4.2(M), (N), and (O). 2. Zones AO and AH shall have adequate drainage paths around containment walls on slopes, to guide flood water away from the proposed walls. 3. Zone AO shall have the top of the containment wall elevated above the highest adjacent grade: a. At least two feet higher than the depth specified in feet on the Flood Insurance Rate Map, or b. At least three feet if no depth number is specified, and c. Shall meet the requirements of Subsection 12.4.5(P)(1)(b) and (c). Q. Wharves, piers, and docks. New construction or substantial improvement of wharves, piers, and docks are permitted in and over water and seaward of the mean high tide if the following requirements are met: 1. In Zones A, AE, Coastal AE, AO, and AH, permanent wharves, piers, and docks shall comply with all applicable local, state, and federal regulations, must be reasonably safe from flooding, and shall not increase flood risk or 2. In Zone VE, permanent wharves, piers, and docks shall have a qualified professional develop or review the structural design and specifications, must be designed to be reasonably safe from flooding, and shall not increase flood risk. R. Coastal floodplains 1. All new construction located within Zones AE and VE shall be located landward of the reach of mean high tide except as provided in Subsection 12.4.5(R)(8). 2. New construction or substantial improvement of any structure located within Zones VE or Coastal AE shall: a. Have the bottom of all electrical, heating, plumbing, ventilation and air conditioning equipment, permanent fixtures and components, HVAC ductwork and duct systems, and any other utility service equipment, facilities, machinery, or connections servicing a structure, elevated to at least two feet above the base flood elevation. Systems, fixtures, equipment, and components shall not be mounted on or penetrate through walls intended to break away under flood loads. b. Be elevated on posts or columns such that: i. The bottom of the lowest horizontal structural member of the lowest floor (excluding the pilings or columns) is elevated to two feet above the base flood elevation. ii. The pile or column foundation and the elevated portion of the structure attached thereto is anchored to resist flotation, collapse, and lateral movement due to the effects of wind and water loads acting simultaneously on all building components. iii. Water loading values used shall be those associated with the base flood. Wind loading values used shall be those required by applicable state and local building standards. c. Have the space below the lowest floor: i. Free of obstructions, or ii. Constructed with open wood lattice work or insect screening intended to collapse under wind and water without causing collapse, displacement, or other structural damage to the elevated portion of the building or supporting piles or columns, or iii. Constructed with non-supporting breakaway walls which have a design safe loading resistance of not less than 10 or more than 20 pounds per square foot. d. Require a registered professional engineer or architect to: i. Develop or review the structural design, specifications, and plans for the construction, which must meet or exceed the technical criteria contained in the Coastal Construction Manual (FEMA-55). ii. Certify that the design and methods of construction to be used are in accordance with accepted standards of practice for meeting the criteria of Subsections 12.4.5(R)(2)(b), (c), and (d). 3. The use of fill for structural support in Zones VE and Coastal AE is prohibited. 4. Human alteration of sand dunes within Zones VE and Coastal AE is prohibited unless it can be demonstrated that such alterations will not increase potential flood damage. 5. The area below the lowest floor may be used solely for parking vehicles, building access, and storage. 6. Physical changes to the natural landscape in Zone VE are subject to the minimum requirements of Subsection 12.4.5(G). 7. Wharves, piers, and docks in Zone VE are subject to the requirements of Subsection 12.4.5(Q). 8. Lobster sheds and fishing sheds may be located seaward of mean high tide and shall be exempt from the elevation requirement in Subsection 12.4.5(I) only if reviewed and approved as a conditional use by the Zoning Board of Appeals, as provided in Section 12.5, and if all the following requirements of Subsections 12.4.5(A), (M), and (N) are met: a. The conditional use shall be limited to low value structures such as metal or wood sheds 200 square feet or less and shall not exceed more than one story. b. The structure shall be securely anchored to the wharf or pier to resist flotation, collapse, and lateral movement due to the effect of wind and water loads acting simultaneously on all building components. c. The structure will not adversely increase wave or debris impact forces affecting nearby buildings. d. The structure shall have unfinished interiors and shall not be used for human habitation. e. Any mechanical, utility equipment and fuel storage tanks must be anchored and either elevated or floodproofed to two-feet above the base flood elevation. f. All electrical outlets shall be ground fault interrupt type. The electrical service disconnect shall be located on shore above the base flood elevation and when possible outside the special flood hazard area. If a flood hazard permit application is granted, the applicant shall be notified in writing that flood insurance is not available for structures located entirely over water or seaward of mean high tide. 12.4.6 Permit A. Upon determination that the development or substantial improvement plan is in compliance with this article, the Building Authority shall issue one of the following Flood Hazard Development Permits based on the type of development: 1. Two-part Flood Hazard Development Permit for elevated structures. Part I shall authorize the applicant to build a structure to and including the first horizontal floor only above the base flood level. At that time the applicant shall provide the Code Enforcement Officer with an “under construction” elevation certificate (FEMA form FF-206-FY-22-152) completed by a professional land surveyor based on the Part I permit construction, “as built,” for verifying compliance with the elevation requirements of Subsections 12.4.5(H), (I), (J), or (R). Following review of the elevation certificate data, which shall take place within 72 hours of receipt of the application, or as soon as practicable thereafter, the Code Enforcement Officer shall issue Part II of the Flood Hazard Development Permit. Part II shall authorize the applicant to complete the construction project. 2. Flood Hazard Development Permit for floodproofing of nonresidential structures. This permit shall apply for nonresidential structures that are new construction or substantially improved nonresidential structures that are not being elevated but that meet the floodproofing standards of Subsection 12.4.5(I)(1). The application for this permit shall include a floodproofing certificate signed by a registered professional engineer or architect. 3. Flood Hazard Development Permit for minor development. This permit shall apply for all other development and building permits that are not new construction or a substantial improvement, such as repairs, maintenance, renovations, or additions, whose value is less than 50% of the market value of the structure. This includes, but is not limited to: accessory structures as provided for in Subsection 12.4.5(L), mining, dredging, filling, grading, paving, excavation, drilling operations, storage of equipment or materials, deposition or extraction of materials, public or private sewage disposal systems or water supply facilities that do not involve structures, and nonstructural projects such as bridges, dams, towers, fencing, pipelines, wharves, and piers. B. For development that requires review and approval as a conditional use, as provided for in this article, the Flood Hazard Development Permit application shall be acted upon by the Zoning Board of Appeals as required under Section 12.5.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.