§ 16.5 — Review Process for Historic Preservation Approval
Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances, Land Use Code § 16.5
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/86db4502-e52b-4c0a-9ebe-38a312344750
16.5 REVIEW PROCESS FOR HISTORIC PRESERVATION APPROVAL
16.5.1 Applicability A historic preservation approval shall be required prior to undertaking any new construction, additions, exterior alterations, site alterations, signage, or the relocation of buildings, structures, or objects affecting any property within the boundaries of a historic designation as identified in Table 16-A. Historic preservation approval shall also be a condition precedent to the issuance of any permit authorizing any such work as noted above. Notwithstanding the above, the following activities shall be considered exempt: A. Work consisting solely of ordinary maintenance, being acts of upkeep or repair which do not include a change in the design, material, or outer appearance of a building, structure, object, or site such as repainting of previously painted surfaces or in-kind replacement of materials or plantings. B. Work consisting solely of emergency repair of a temporary nature. C. Work approved under a valid certificate of economic hardship. D. Work where the Planning Authority determines that the proposed exterior changes are not readily visible at pedestrian heights from any public way or public open space. E. Installation of new public artworks approved or acquired through the City of Portland Public Art Program. F. Changes in plantings or vegetation outside of historic landscape districts and minor changes in plantings or vegetation within historic landscape districts. G. Alterations to existing grave markers or tombs made for the purpose of recognizing additional decedents or installation of grave markers or tombs recognizing new interments within an existing cemetery. H. Roof-mounted solar energy systems where the system: 1. Is consistent with all other city requirements, 2. Is installed reversibly with no damage to any historic roofing materials, 3. Is not installed on street-facing roof planes on landmarks or contributing buildings or structures, and 4. Any associated electrical equipment is not installed on street-facing facades. I. Ground-mounted heat pumps and HVAC equipment where: 1. Exterior units are installed at least 30’ from public rights-of-way or behind the street-facing facades of the associated building or structure, whichever is a greater distance, and 2. Any associated line hides, conduit, vents, and other equipment or penetrations are not installed on street-facing facades. J. Installation of temporary buildings, structures, or objects for a period of less than eight consecutive months, unless such installation otherwise meets a threshold for review established in Table 16-A. K. Demolition of non-contributing buildings, structures, objects, or sites. L. Relocation of non-contributing buildings, structures, or objects to a property outside any historic designation boundary. M. Interior work of any kind. 16.5.2 Review classifications A. Applications shall be subject to administrative or Historic Preservation Board review according to the classifications in Table 16-A. B. The Planning Authority may, due to the scope or anticipated impacts of a project, reclassify an administrative review to a Historic Preservation Board review. C. At any point in the review process, an applicant may request that the Planning Authority reclassify the application from administrative to Historic Preservation Board review. TABLE 16-A: HISTORIC PRESERVATION REVIEW CLASSIFICATIONS | | Administrative Review | Board Review New construction and additions | | ≤ 500 SF | > 500 SF Dormer additions1 | | Affecting ≤ 40% of roof area (in SF) | Affecting > 40% of roof area (in SF) Alterations to contributing buildings, structures, or objects2 | Minor alterations | All | -- Alterations to contributing buildings, structures, or objects2 | Major alterations | ≤ 25% of any façade, or where work is based on clear documentation of the historic appearance | > 25% of any facade Alterations to noncontributing, buildings, structures, or objects2 | Minor alterations | All | -- Alterations to noncontributing, buildings, structures, or objects2 | Major alterations | ≤ 40% of any facade | > 40% of any facade Site alterations3 | | All | -- Signage | | All | -- Relocation of buildings, structures, or objects4 | | ≤ 500 SF | > 500 SF 1 Dormer additions include any increase in volume which does not interrupt the ridges, eaves, or rakes of an existing building or structure. 2 Minor alterations include small or routine changes such as required by building code or modern convenience which result in minimal change in exterior appearance of an existing building, structure, or object. Major alterations include changes to existing or introduction of new details or features which affect the scale, form, proportion of openings, ratio of solid to void, rhythm or placement of entrances, color or texture of materials, or relationship to the street of an existing building, structure, or object. 3 Site alterations include the construction of permanent features such as fences and retaining walls, regrading, hardscaping, and the installation of exterior utilities. 4 Relocations include the moving of a building, structure, or object on its site or to another site. 16.5.3 Historic Preservation pre-application meeting Applicants are encouraged to schedule a historic preservation pre-application meeting with the Planning Authority prior to applying for historic preservation review. The purpose of this meeting is to familiarize the applicant with the City of Portland Historic Preservation submittal requirements, applicable review standards, and to confirm the level of review required. A pre-application meeting does not confer pending proceeding status under Title 1 MRSA 302. No decisions relative to the application shall be made at the pre-application meeting, nor shall any advice or information provided by the Planning Authority be construed as a decision. 16.5.4 Applications Application for historic preservation review shall be made on a form prepared by the City and submitted to the Planning Authority along with the applicable fee. Upon receipt of an application and fee, the Planning Authority shall determine whether the application is complete and the level of review required per Table 16-A. 16.5.5 Costs All projects shall be subject to fees as established by the City Council to cover the administrative costs of review. Applicants are also required to pay fees to cover the professional and administrative costs for analysis associated with project review, including but not limited to planning, legal, or other services as needed. 16.5.6 Lapse in application An application for historic preservation review shall be diligently pursued from the date of submission. Applicants shall provide additional information as requested by the Planning Authority or Historic Preservation Board when determined to be reasonably necessary to make any determination required by this article. Failure of an applicant to provide a response to the request for additional information within 120 days of the date upon which the written request was made shall cause the application to expire and be deemed null and void. 16.5.7 Administrative review An application for historic preservation review subject to administrative review shall be reviewed by the Planning Authority for compliance with the standards of Section 16.6. The Planning Authority may request revised plans and submittals necessary to determine compliance. The Planning Authority shall approve the application, approve the application with conditions, or deny the application. 16.5.8 Historic Preservation Board review A. An application for historic preservation review subject to Historic Preservation Board review shall be reviewed by the Historic Preservation Board for compliance with the standards of Section 16.6. The Planning Authority may request revised plans and submittals necessary to determine compliance with the standards of Section 16.6 prior to scheduling a Historic Preservation Board workshop or public hearing. B. The Planning Authority shall schedule the project for review at a workshop or public hearing on a date that meets public noticing requirements and prepare a report for the Historic Preservation Board’s consideration which addresses the proposed project’s compliance with the standards of Section 16.6. C. In the case of applications being reviewed at a workshop or workshops prior to the public hearing, they shall be informational and not result in any formal approval or disapproval of the project. At a workshop, the Historic Preservation Board shall review the plans and submittals, consider the staff review with respect to the standards of Section 16.6, hear public comments and questions, and provide direction to the applicant regarding issues to be addressed to bring the application into compliance with the standards of Section 16.6. D. At a hearing, the Historic Preservation Board shall approve, approve with conditions, or deny the application based on the standards of Section 16.6. Should the Historic Preservation Board deny an application, it shall enter findings of fact concerning the relationship between the application and standards of Section 16.6 within 60 days of the close of the public hearing. Written notice of the determination of the Historic Preservation Board on the application, including a copy of the findings of fact, shall be sent by regular mail to the applicant. 16.5.9 Review process involving major site plans Site plan review by the Planning Board and historic preservation review by the Planning Authority or Historic Preservation Board shall, to the extent feasible, proceed concurrently. Any proposed major site plan required to obtain historic preservation approval under this article shall be exempt from the design standards included in Article 13, and shall comply with the standards of Section 16.6. 16.5.10 Notice of public meeting A. For all applications for historic preservation review that are subject to Historic Preservation Board review, the applicant shall be responsible for posting a notice of public meeting sign on the property where the development is to occur. The dimensions, construction, and content of the sign shall be in accordance with standards established by the Planning Authority. B. The sign shall be posted at least 10 days prior to the public workshop or hearing date, and shall be removed from the property no more than three days following the date of the meeting. C. Once the required notice of public meeting signage is posted, the applicant shall submit a completed certification of posting form to the Planning Authority. D. In the event that a required notice of public meeting sign is knocked over or made illegible, it shall be the responsibility of the applicant to promptly reset or replace the sign, though failure to do so shall not invalidate the review. 16.5.11 Conditions of approval The Planning Authority or Historic Preservation Board may impose conditions upon its approval of any application for historic preservation review to bring the application into compliance with the standards of Section 16.6. 16.5.12 Historic preservation approval A. The Planning Authority shall approve or approve with conditions by the Planning Authority or the Historic Preservation Board. B. No historic preservation approval, building, demolition, or other permit shall be issued until all current charges due under this article have been paid. The balance of any remaining review and administrative costs invoiced or incurred after an approval has been issued shall be paid in full by the applicant prior the issuance of any temporary or permanent certificate of occupancy. C. Prior to historic preservation approval the applicant shall demonstrate sufficient right, title, or interest in the property, technical capacity, and financial capacity to complete any change proposed to be undertaken under the historic preservation approval, upon reasonable request of the Planning Authority. 16.5.13 Expiration of approvals A. Unless work authorized by a historic preservation approval is commenced or a building permit for the same is issued within three years of the initial date of historic preservation approval, the approval shall expire and shall become null and void. B. When the approved work also requires a site plan approval under Article 13, the expiration of the historic preservation approval shall be concurrent with the expiration of the site plan approval, even if longer than three years. C. In the event of litigation arising out of the granting of a historic preservation approval, the approval shall remain valid until one year after the entry of final judgment in the litigation or until the end of the three-year period, whichever is later. 16.5.14 Amendments A. An applicant may apply for an amendment to a historic preservation approval by submitting an amendment application that includes a written statement of the proposed amendment, proposed amended plans, and related submittals to the Planning Authority. B. The Planning Authority is authorized to approve minor amendments under the procedures set forth in Subsection 16.5.7, provided that the proposed amendments: 1. Are generally consistent with the approved plans, 2. Meet all the standards for review of Section 16.6, 3. Do not modify the work such that Historic Preservation Board review would otherwise be required per Table 16-A, and 4. Do not affect any condition or requirement of the Historic Preservation Board. C. Major amendments include changes that exceed the limited criteria for a minor amendment under Subsection 16.5.14(B). Review procedures shall follow those for a Historic Preservation Board review, set forth in Subsection 16.5.8.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
