Sec. 25-48. Acceptance of streets and ways not previously dedicated for public travel.
A street or way constructed on private lands by the owner thereof, and a street or way not dedicated for public travel prior to July 7, 1948, shall be laid out and accepted as a public street or way by the city only upon the following conditions: (a) Deed from owners. The owners shall give the city a deed to the property within the boundaries of the street. (b) Minimum width. The street or way shall have a minimum width of fifty (50) feet. However, the street or way may have a lesser width if the plan thereof, showing such lesser width, has been approved by the planning board and the public works authority; provided that any such street or way located on any of the islands in Casco Bay, which is not considered to be a collector street in the opinion of the public works authority and the planning board, may have a minimum width of thirty-two (32) feet. In such cases, all other provisions of this article shall apply except that not more than sixteen (16) feet of such street or way shall be required to be developed for travel and only six (6) inches of gravel shall be required, but the entire width of such street or way shall be cleared of all stumps, roots, brush, perishable material and trees not intended for preservation as specified by the public works authority. There shall be no exceptions to the provisions of this article in the case of collector streets as determined as set forth above. (c) Recorded plan. A plan of the street or way shall be recorded in the county registry of deeds. (d) Petition. A petition for the laying out and acceptance of the street or way shall be submitted to the city council upon a form to be prescribed by the public works authority. The petition shall be accompanied by a plan, plot plan, profile and cross-section of the street or way as follows: 1. A plan and a plot plan drawn, when practicable, to a scale of forty (40) feet to one (1) inch, and to be on one (1) or more sheets of paper not exceeding twenty-four (24) inches by thirty-three (33) inches in size. The plot plan shall show the north point, the area of all lots, the length of all lot lines, the location and ownership of all adjoining subdivisions and adjacent acreage, passageways, street lines, buildings, boundary monuments, waterways, topography and natural drainage courses with contours at not greater than six (6) foot intervals, all angles necessary for the plotting of the street and lots and their reproduction on the ground, the distance to the nearest established street line, and any buildings abutting on the street or way, together with the stations of their side lines. 2. A profile of the street or way drawn to a longitudinal scale of forty (40) feet to one (1) inch and a vertical scale of four (4) feet to one (1) inch. The profile shall show the profile of the side lines and center lines of the street or way and the proposed grades thereof. Any buildings abutting on the street or way shall be shown on the profile. 3. A cross-section of the street or way drawn to a horizontal scale of five (5) feet to one (1) inch and a vertical scale of one (1) foot to one (1) inch. 4. The location and size of the proposed water mains in accordance with this article. (e) Specifications. The street or way shall be previously constructed in accordance with the following specifications: 1. Residential areas. The roadway shall be built with a minimum thickness of fifteen (15) inches of road gravel, and three (3) inches of aggregate base gravel, both of which shall be satisfactory to the public works authority. The roadway shall be surfaced with two (2) inches of hot bituminous concrete properly prepared and laid in two (2) courses of one (1) inch each, in accordance with specifications of the public works authority. The sidewalks shall be built of gravel six (6) inches in depth and the driveways, including that part crossing the sidewalk, shall be built of gravel ten (10) inches in depth; both to be covered by a two (2) inch top of hot bituminous concrete, properly prepared and laid in two (2) courses of one (1) inch each, in accordance with the standard specifications of the public works authority. Curbing shall be provided as required in article IV of chapter 14. The street or way shall be constructed by the following method: It shall be cleared of all stumps, roots, brush, perishable material and all trees not intended for preservation. All loam, loamy material and clay shall be removed from the street or way to the depths specified by the public works authority. The street shall then be graded to a subgrade of not less than twenty (20) inches in the roadway location and not less than twelve (12) inches in the driveway areas, below and parallel to the finished grade as shown on the plans, profiles and cross-section of the street or way. The subgrade shall be carefully shaped and thoroughly compacted before the gravel is placed. When a minimum length of three hundred (300) feet, or the entire length of street if less than three hundred (300) feet, has been excavated to subgrade and this subgrade properly prepared for the gravel, the public works authority shall be notified and after inspection his or her approval obtained for placing the gravel. The gravel shall then be placed and compacted in layers of not more than six (6) inches in the roadway and driveway area and not more than eight (8) inches in the sidewalk areas. Before the roadway is paved, and the bituminous concrete laid in the sidewalk and driveway areas, the work shall again be inspected and approved by the public works authority. Suitable forms or headers must be used for the construction of the bituminous top to insure proper alignment and grade. 2. Industrial areas. Roadways shall be paved with a high type pavement in accordance with the standard specifications of the public works authority. (f) Engineering work. All engineering work, including the setting of grade stakes, necessary for the construction of the street and sidewalks, shall be performed by the developer at his or her expense. (g) Sewers and drains. Any sewers and appurtenances, drains, including house drains and catch basins, which are to be built iii the street or sidewalks, and all underground utilities and their respective services, shall be constructed before any road material is placed, except for house connections to serve lots where no construction has begun prior to the placing of such road material. In any event a minimum of seventy-five (75) percent of all lots on any one (1) street within the section of the subdivision being constructed shall have the house connections completed within the street right-of-way before the aggregate base course is placed thereon. If a hardship is created by strict compliance with the above requirements, request for a variance may be made in writing to the public works authority who shall respond in writing to the city council stating approval or disapproval. Whenever it shall be deemed necessary by the public works authority that a sanitary sewer or storm sewer be constructed to serve the street under consideration, such sanitary sewer or storm sewer shall be completed before the gravel or road material is placed thereon. The sewer shall be built by the developer in accordance with one (1) of the following methods: 1. The developer shall cause the sanitary sewers and storm sewers and appurtenances, including catch basins to be built to the specifications of the public works authority and under his or her supervision. Such construction shall be by competitive bids, duly advertised, and to the satisfaction of the public works authority. When the sewer and an easement therefor have been deeded to the city, the city may make payment to the developer of the cost of any catch basins plus one-third of the total remaining costs thereof, as determined by the public works authority, the city's engineering costs to be included in the total cost and deducted from the city's payment. 2. The developer shall cause the sanitary sewers and storm sewers and appurtenances, including catch basins, to be built to the specifications of the public works authority and under his or her supervision, but without regard to competitive bids. When the street has been accepted, the sewer shall be deeded to the city as a public sewer at no cost to the city. 3. When the public works authority requires such sewer to be of a larger size than would be needed for the development under consideration, the added cost for the excess size as determined by the public works authority may be paid by the city upon authorization by the city council, provided the sewer is built through competitive bidding, properly advertised, and to the satisfaction of the public works authority. (h) Water main. A reasonably available water main of at least eight (8) inches in diameter must exist for the use of buildings, residents and occupants of the street to be accepted and the chief of the fire department must, in writing, certify that adequate water service for sufficient fire protection hydrants exists. In the case of a street or way located on the islands in Casco Bay, no water main need be provided when the chief of the fire department and the planning board shall certify in writing that no water supply is reasonably available to serve such street or way. Provided, however, that the city council may accept a street with a water main of less than eight (8) inches in diameter when the chief of the fire department and the planning board, in writing, certify that a water main of less than eight (8) inches in diameter will furnish adequate water service for sufficient fire protection hydrants for the street to be accepted and any future extension or extensions of the street. If shall be the policy of the city to cause the installation of such hydrants as may be required for fire protection at the same time as the installation of the water main.
(Code 1968, § 707.3; Ord. No. 405A-73, §§ 1--6, 6-18-73)