For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-8 — Performance standards

Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances § 31-8

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/6381bc13-451a-4bf4-9820-cab6981b4bc5

Sec. 31-8. Performance standards.

The city council shall not issue a license to operate a scrap metal recycling facility unless the applicant can demonstrate that all of the following performance standards have been and will be met: (a) Operation. The facility is operated so that it does not contaminate soil or groundwater or surface water to a level prohibited by state law or rules promulgated by the department, whichever is stricter. (b) Approval and Coordination with site plan review. For facilities established after the effective date of this ordinance, the facility has received site plan approval by the planning board pursuant to the site review ordinance, and the operation of the facility is in compliance with the approved site plan. For facilities established prior to the effective date of this ordinance, the facility has received site plan approval by the department and the operation of the facility is in compliance with the approved site plan. (c) Aquifer location prohibited. No scrap metal recycling facility shall be located over a sand and gravel aquifer or aquifer recharge areas as mapped by the Maine Geological Survey or by a licensed geologist. (d) Flood plain location prohibited. No scrap metal recycling facility shall be located within a 100-year flood plain. (e) Dismantling motor vehicles. All dismantling of motor vehicles shall e done in compliance with rules promulgated by the department. (f) Storage/handling of batteries and fluids from motor vehicles. All batteries and fluids shall be handled as required by rules promulgated by the department. (g) Storage and handling of waste. All waste shall be handled as required by rules promulgated by the department. (h) Noise impact. To reduce the impact of noise, all mechanized sorting, baling or processing of metals shall be done after 7 a.m. and before 6 p.m. Mondays through Saturdays. (i) Setback from public areas. No scrap metal recycling facility shall be located within 500 feet of any public park, public playground, and public bathing beach, school, places of worship or cemetery. (j) Setback from waterways and water supplies. No scrap metal recycling facility shall be located within 100 feet of any waterbody, watercourse or wetland, or within 300 feet of a well that serves as a public or private water supply. (k) Road/property line setbacks. No scrap metal recycling facility shall be located within 1,000 feet of the right-of-way of any highway incorporated in both the interstate system and primary system or within 600 feet of the right-of-way of any other highway or within 1,000 feet of an abutting property line except for a scrap metal recycling facility entirely screened from ordinary view from that public road or abutting property line at all times in accordance with the screening standards in the rules promulgated by the department. (l) Visual impact. Metal or other material in a scrap metal recycling facility shall be located in such a way so as not to be in ordinary view. (m) Screening. Screening may be accomplished by natural or man-made objects, planting or properly constructed fences, or any combination thereof, any of which must entirely screen the scrap metal recycling facility from ordinary view throughout the year. Screening shall be accomplished according to the standards prescribed by rules promulgated by the department. (n) Remedial action plan required. A remedial action plan will be required of the applicant or a licensee whenever the department determines that, based upon testing data or other information it has received and verified that the applicant or licensee is not in compliance with the requirements of this ordinance or regulations promulgated hereunder. Within 30 days after the department’s written request to do so, the licensee shall submit a remedial action plan and schedule to the department, for its review and approval that removes, remediates, or abates waste contamination or any other violation of this ordinance or the rules promulgated hereunder. (o) Implementation of remedial action plan. Beginning thirty (30) days after the department’s review and approval of the remedial action plan and schedule required by paragraph 31-8(n) of this article, implement the remedial action plan and schedule as modified and approved by the department. (p) Exemption from specific requirements. The requirements in subparagraphs 8(c), (d), (i) and (j) above shall not apply to facilities existing on or before the effective date of this ordinance.

(Ord. No. 255-03/04, 9-8-04; Ord. No. 136-05/06, 12-19-05; Ord. No. 286-05/06, 6-19-06)

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.