§ 32-38 — Post-construction stormwater management plan compliance
Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances § 32-38
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/0811c887-cf97-4329-a11d-0a05bd85b999
Sec. 32-38. Post-construction stormwater management plan compliance.
Any person owning, operating, or otherwise having control over a BMP required by a post-construction stormwater management plan shall maintain the BMPs in accordance with the approved plan and shall demonstrate compliance with that plan as follows: (a) Inspections. The owner or operator of a BMP shall hire a professional Qualified to perform Post-Construction BMP Annual Inspections (as defined in section 32-1 of this ordinance) to at least annually, inspect the BMPs, including but not limited to any parking areas, catch basins, drainage swales, detention basins and ponds, pipes and related structures, in accordance with all municipal and state inspection, cleaning, and maintenance requirements of the approved post-construction stormwater management plan. (b) Maintenance and repair. If the BMP requires maintenance, repair, or replacement to function as intended by the approved post-construction stormwater management plan, the owner or operator of the BMP must provide to the DPW, a record of the deficiency and corrective action(s) taken in no later than 60 days following the date the deficiency was identified. If 60 days is not possible, then the DPW must establish an expeditious schedule for the owner or operator of the BMP to complete the maintenance and establish a record of the deficiency and corrective action(s) taken. (c) Annual report. The owner or operator of a BMP shall hire a professional Qualified to perform Post-Construction BMP Annual Inspections (as defined in Section 32-1 of this ordinance), to provide on or by June 30 of each year, a completed and signed certification to the DPW in a form provided by the DPW, certifying that the person has inspected the BMP(s) and that they are adequately maintained and functioning as intended by the approved post-construction stormwater management plan. If, at the time of inspection, the BMP(s) required maintenance or repair, the professional Qualified to perform Post-Construction BMP Annual Inspections (as defined in Section 32-1 of this ordinance) hired by that person shall provide of the deficiency and corrective action(s) taken to the DPW in no later than 60 days following the date the deficiency was identified. If 60 days is not possible, then the DPW must establish an expeditious schedule for the owner or operator of the BMP to complete the maintenance and establish a record of the deficiency and corrective action(s) taken. (d) Filing fee. Any persons required to file an annual certification, under this section shall include, with the annual certification a filing fee established by the DPW to pay the administrative and technical costs of review of the annual certification. (e) Right of entry. In order to determine compliance with this article and with the post-construction stormwater management plan, DPW may enter upon property at reasonable hours with the consent of the owner, occupant, or agent to inspect the BMPs.
(Ord. No. 35-09/10, 8-17-09; Ord. 108-15/16, 11-16-2015; Ord. No. 242-23/24, 6-17-2024)
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
