§ 32-45 — Erosion and Sediment Control Inspections
Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances § 32-45
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/0c819616-deb3-486c-8cb9-6252b4de4c12
Sec. 32-45 Erosion and Sediment Control Inspections.
(a) Inspections are required in order to ensure that all erosion and sediment control practices are installed and maintained to prevent the discharge of sediment from disturbed areas. (b) Sites with 1 acre or More of Disturbance or Major Site Plan (1) For Major Site Plans that have less than one acre of disturbance the applicant shall retain the services of a professional Qualified for Erosion & Sedimentation Control Inspections (as defined by Section 32-1 of this Ordinance). (2) For all sites with one acre or greater of disturbance, the applicant shall retain the services of a professional Qualified for Erosion & Sedimentation Control Inspections during construction (as defined by Section 32-1 of this Ordinance) The inspector for sites with greater than one acre of disturbance may not be employees, partners, or contracted consultants involved with the permitting of the project or otherwise employed by the same company or may not have ownership or financial interest in the development other than that created by being retained as the third-party inspector. (3) The site must be inspected as described herein. All areas of disturbance, impervious areas, erosion and sediment control best management practices, materials storage areas exposed to precipitation, and locations where vehicles enter or exit the Site shall be inspected: a. Once before any disturbance begins and after all Erosion and Sedimentation Control BMPs specified in the Erosion and Sedimentation Control Plan are in place; b. At least once a week as well as before and within 24 hours after a storm event (rainfall); and c. Once at project completion to ensure the Site has reached permanent stabilization and all temporary erosion and sedimentation controls have been removed. (4) The inspection is required in order to ensure that all construction and stabilization activities comply with the approved drawings and specifications; that field decisions regarding erosion control implementation, stormwater system installation, and natural resource protection are based on sound engineering and environmental considerations; and that any changes to the development’s erosion control plan, stormwater management plan, or final stabilization plan is communicated to the City of Portland for additional review and approval. (5) The inspector will submit weekly written reports to the Stormwater Coordinator(s) in the Water Resources Division of Public Works and the Development Review Coordinator(s) in Planning. Reports must include: project ID, project address, the date(s) and time(s) of inspection(s), site photographs of areas under construction, and the date(s) and approximate duration(s) of any rainfall events in the prior week. The report will identify and describe any erosion problems or discharge of pollutants and what actions will be taken to address these issues and repair any damage to other properties or natural resources, actions to eliminate the erosion source, and actions to prevent future sediment discharges from the area. (c) Minor Site Plans. The applicant is responsible for inspecting the site and maintaining erosion and sedimentation controls in good working order. In general, sites with less than 1 acre of disturbance are not required to submit an inspection report, however the City reserves the right to require reports of any project. The applicant should inspect the site as follows: (1) All areas of disturbance, impervious areas, erosion and sediment control best management practices, materials storage areas exposed to precipitation, and locations where vehicles enter or exit the Site shall be inspected: a. Once before any disturbance begins and after all Erosion and Sedimentation Control BMPs specified in the Erosion and Sedimentation Control Plan are in place; b. At least once a week as well as before and within 24 hours after a storm event (rainfall); and c. Once at project completion to ensure the Site has reached permanent stabilization and all temporary erosion and sedimentation controls have been removed. (d) The Enforcement Authority, bearing proper credentials and identification, shall have the right of entry to any site with soil disturbance for the purpose of inspecting the site to determine that all construction and stabilization activities comply with the provisions of this article and applicable standards.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.