§ 6-168 — Submissions
Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances § 6-168
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/0a07eedd-a447-4b01-ae45-551ae34fffba
Sec. 6-168. Submissions.
Upon submission of an application for a building permit for new construction or renovation projects that are required to meet the standards set forth in section 6-167, the applicant shall also submit the following, as applicable: (a) One of the following: 1. A LEED checklist, and a LEED application number (or other proof of LEED applications status); or 2. A third-party certification system document of verification from a qualified professional ; or 3. A preliminary energy model, along with a statement of certification from a licensed engineer or qualified professional that the project meets the standard(s); and (b) A written explanation of how the building will obtain the applicable standards using design plans to demonstrate compliance where applicable (example: LEED submittal templates or Passive House Pre-Certification report); and (c) Plans and documentation prepared by a qualified professional demonstrating compliance with the Better Roof Requirements contained in Section 6-175 below, including: 1. Documentation of the as-designed structural loads and plans for interconnecting a photovoltaic (PV) system to the electrical system of the building; or 2. Documentation of the as-designed structural loads and layout plans for the Living Roof system of the building.
(Ord. No. 187-08/09, 4-6-09; Ord. No. 103-11/12, 2-6-12; Ord. No. 82-13/14, 11-4-13; By Referendum, 11-3-2020)
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
