4:12 — Determination of necessity
Code of the City of Ann Arbor, Michigan (Supp. No. 26: codified through Ordinance No. 26-22, enacted July 20, 2026) · Ann Arbor City Code § 4:12
Corpus is an independent public-information project, not the official City of Ann Arbor website. Stable reference: corpuslaw.us/code/7dc8999c-1463-40c9-827e-f4c566bc7eda
4:12. - Determination of necessity.
The necessity for such sewer and water connections shall be determined by the Administrator, which determination shall be based upon the size, shape and area of each abutting lot or parcel of land, the lawful use of such land under the zoning regulations of the city, the character of the locality and the probable future development of each abutting lot or parcel of land. The Administrator shall give written notice of the intention to install such sewer and water connections and to charge the cost of the same to the premises, to each owner of land abutting the street, to be furnished with such connections, as shown by the records of the City Assessor in accordance with section 1:11 of this Code. Any owner objecting to the installation of any such sewer or water connection, shall file his objections in writing within 7 days after service of such notice, with the Administrator who shall, after considering each such objection made in writing, make a final determination of the sewer and water connections to be installed.
(Ord. No. 45-75, 2-17-76)
Ask a question about Ann Arbor law
Corpus searches the Ann Arbor sections it holds and shows the ones that match, with their citations. Free, no sign-in.
