For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-545 — Alternative compliance for qualified solid bulk materials; application process; certificate of alternate compliance; fee

Code of Ordinances of the City of Dearborn, Michigan (2026 S-07: Code and Zoning updated through September 22, 2026) · Dearborn City Code § 13-545

Corpus is an independent public-information project, not the official City of Dearborn website. Stable reference: corpuslaw.us/code/8dc60ec2-2f63-4f30-944e-3e681a59bd64

Sec. 13-545. Alternative compliance for qualified solid bulk materials; application process; certificate of alternate compliance; fee.

(a) Application and eligibility for certificate of alternative compliance; renewal; alternative operating plan; exception to standards set forth in article; conditions. (1) The owner or operator of a facility that processes, handles on-site, transfers, loads, unloads, stockpiles, or stores qualified bulk solid materials shall be deemed in compliance with this article, and shall receive a certificate of alternative compliance from the department director, if the owner or operator meets all the terms and conditions of this section. (2) Exception to default standards. If the facility has an alternative operating plan, as that term is defined in Sec. 13-542, the standards set forth in the plan for fugitive dust sources or potential fugitive dust sources shall control and be enforceable under this article if they are subject to enforceable permit condition(s) or enforceable order(s) as part of the plan. a. Pile height standard exempt from exception. Regulations that address pile height for outdoor storage of bulk solid materials, including pile height of combustible materials, are exempt from the exception stated above, and control over any similar regulations found in an alternative operating plan. b. A pattern of violations under applicable local, state, or federal law related to the requirements of this article; or a pattern of violations of the standards set forth in the alternative operating plan, may result in the loss of the exception under this section, in which case all terms and conditions of this article that deviate from those set forth in the alternative operating plan shall become enforceable. (b) Submission of alternate operating plan for facility. The owner or operator must submit an alternative operating plan for the facility, as that term is defined in Sec. 13-542, subject to the review and approval of the department director or their designee. (c) Compliance with alternative operating plan. The alternative operating plan, including any amendments, must be approved by the issuing authority, in effect at the time of submission, and the owner or operator must be in compliance with the plan. (d) Fee. A non-refundable fee of $2,500.00 is due at the time an application for a certificate of alternative compliance or renewal is submitted to the department, which shall cover the costs of application review, inspections, and compliance monitoring conducted pursuant to this section and, if applicable, the article. The department reserves the right to increase this fee if it no longer covers the aforementioned costs. This fee is not inclusive of other fees that may be required by the Code of Ordinances, the Zoning Ordinance, or applicable law. (e) Contents of alternative operating plan. The applicant may submit one of the following alternative operating plans, subject to the following terms and conditions, as part of the application under this section: (1) Reliance on alternative operating plan under MCL 324.5524(5) with additional information. The state operating plan includes the information required by section 5524(5) of the Natural Resources Environmental Protection Act, being MCL 324.5524(5), and all of the following additional information is included in (i) the state operating plan, (ii) included in an active national pollutant discharge elimination system or active groundwater permit for the facility issued by the Michigan Department of Environmental Quality or Michigan Department of Environment, Great Lakes, and Energy or successor agency, or (iii) included with any supplemental information filed with the department with an application for a certificate of alternative compliance under this section: a. A site map for the facility, drawn to scale, in conformance with the requirements and standards of Zoning Ordinance Section 32.02, and providing the following additional information: 1. Facility boundaries; a. All buildings, internal roadways, and utilities on facility property; b. All roadways and transportation corridors within one quarter mile of the perimeter of the facility that are used for transport of material to or from the facility; c. The location of all floor drains, storm drains, and storm water outfalls; d. All potential emission points at the facility, including a depiction of the footprints of all bulk solid material storage piles, transfer points, conveyors, and roadways; and e. The location of all fugitive dust control devices and monitoring devices, including the fugitive dust monitor and wind monitor. 2. A description of the facility’s operations, including a list of all bulk solid materials that are construction bulk solid materials handled at, processed at, or transported to, from, or within the facility; 3. A description of the control measures, devices, and technologies to be used to minimize and control fugitive dust at the facility consistent with any applicable standard for density of emissions under Rule 336.1301 of the Michigan Administrative Code, a description of how all control measures, devices, and technologies will be maintained and calibrated to ensure their continued effectiveness, and a description of the training provided to staff regarding the proper application and operation of the control measures, devices, and technologies; 4. A description of the owner or operator’s system for recordkeeping compliant with the following requirements: a. The facility owner or operator shall record all roadway cleaning and street sweeping daily. b. The facility owner or operator shall record the application of water and/or chemical stabilizers, as applicable, as well as any instances when such application was suspended for any reason, including, but not limited to, weather conditions. c. The facility owner or operator shall maintain a schedule for routine inspections, maintenance, and testing of all fugitive dust control measures, devices, and technologies, including a schedule for inspection of bulk solid material piles, inspection of all monitors, and inspection of off-site areas for the presence of dust, and identify the person or persons responsible for conducting such inspections, maintenance, and testing. d. The system of recordkeeping for the owner or operator’s compliance with Secs. 13-545(e)(1)a.2. and 13-545(e)(1)e. of this section, and compliant with a requirement that the owner or operator keep and maintain the records described in this subparagraph at the facility and available for inspection by the department for at least 3 years after creation; b. A description of the owner or operator’s measures to comply with any applicable setback requirements under state law, rule, or permit, or applicable under the city’s Zoning Ordinance; c. A description of measures to comply with the following height limits and screening requirements relating to piles, as outlined in Sec. 13-556: 1. The vertical distance from the grade immediately adjacent to a pile to the highest point of that pile shall be no greater than 25 feet. Piles shall be screened from view from adjacent rights-of-way and properties at the level of the right-of-way. a. Exception for combustible materials. Combustible materials capable of self-ignition through chemical action of its constituents shall be no greater than 15 feet. Piles shall be screened from view from adjacent rights-of-way and properties at the level of the right-of-way. d. A description of protection for waterways consistent with the requirements of any applicable state law, rule, operating plan, or permit, or the requirements of this article, City Code, or a permit issued by the city; e. A description of the owner or operator’s measures to monitor wind speeds at the facility and to suspend disturbance of piles of qualified solid materials, including, but not limited to, outdoor loading, unloading, and any other processing, during high wind conditions unless alternate measures are implemented to effectively control dust in accordance with any applicable state operating plan or permit; and f. A description of storm water management, erosion, sediment control, and drainage measures to control runoff or migration at or from the facility in a manner consistent with requirements under any applicable state law, rule, operating plan, or permit, or with any requirement of this article, City Code, city permit, or both. (2) Reliance on state operating plan. If the owner or operator is relying only upon a state operating plan for compliance with this section, the owner or operator must file a copy of the state operating plan and any amendments to document compliance with this section and all of the following apply: a. Within 45 days of receipt, the department must review the operating plan and any amendments and inspect the facility for compliance with the requirements of this section to determine whether the operating plan and any amendments satisfy the requirements of this section and are adequate to protect the public health and the environment and to prevent the emission of fugitive dust that causes unreasonable interference with the comfortable enjoyment of life and property; b. Within 45 days of the inspection the department director, or their designee, shall determine and notify the owner or operator of the facility in writing that the owner or operator of the facility is in compliance with this section; and c. The owner or operator shall remain in compliance with this section. (3) Reliance on state permit not part of state operating plan or supplemental filing in addition to state operating plan. If the owner or operator is relying on a state permit not part of a alternative operating plan or other supplemental information filed with the department in addition to a alternative operating plan for compliance with this section, the owner or operator shall comply with all the following: a. The owner or operator shall file with the department a copy of the state operating plan and any amendments and supplemental information to document compliance with this section along with an application for alternative compliance under this section on a form determined by the department; b. Within 45 days of receipt, the department or designee: 1. Review the application and other documents submitted; 2. Inspect the facility for compliance with the requirements of this section to determine whether the application and other documents submitted satisfy the requirements of this section and are adequate to protect the public health and the environment and to prevent the emission of fugitive dust that causes unreasonable interference with the comfortable enjoyment of life and property; and 3. If applicable, issue a certificate of alternative compliance confirming compliance with this section; and c. The owner or operator remains in compliance with this section. The department director may revoke a certificate of alternative compliance issued under this section if an owner or operator does not remain in compliance with this section. (f) Local enforcement of state violation. If an owner or operator of a facility violates the requirements of the alternative operating plan or permit for the facility, or otherwise violates section 5524 of the Natural Resources and Environmental Protection Act, being MCL 324.5524, or Rule 336.1371 and 336.1372 of the Michigan Administrative Code, as amended, and the Michigan Department of Environment, Great Lakes, and Energy (“EGLE”), a successor agency, or another state officer or agency does not act to remedy or penalize the violation, the violation may be enforced as a violation under Sec. 13-562. The city reserves the right to notify EGLE, or its successor agency, of any violations pursuant to this subsection for enforcement action. (g) Nothing in this section shall be an exclusive remedy, or be construed to impair or bar any cause of action or legal or equitable remedy of any person or the public under applicable laws and regulations. (h) Application renewal. The owner or operator of a facility subject to this section shall apply for a renewal of a certificate of alternative compliance whenever their applicable alternative operating plan is renewed, modified, or amended. Renewal shall be made in the same manner as the initial application, and is subject to all applicable terms and conditions of this article. (1) The owner or operator shall have 30 days from the date their alternative operating plan is renewed, modified, or amended to submit an application for renewal. (i) Inspections. The department shall conduct semi-annual inspections for the purpose of monitoring compliance with this section and may conduct other inspections for the purpose of monitoring compliance with this article. If the department determines that an owner or operator is not complying with the requirements of this article, including, but not limited to this section, the department director shall require the owner or operator to take action to comply with this article, and shall impose fines authorized by Sec. 13-503 of this article for each day the owner or operator fails to take the action required by the department. (j) Non-compliance. An owner or operator of a facility not in compliance with this section at any time must comply with the standards set forth in Division 4 of this article. An owner or operator of a facility shall not be deemed in compliance with this section if one or more of the following apply: (1) The state or other applicable authority determines that the owner or operator is not in compliance with an alternative operating plan or state permit applicable to the facility; (2) The department determines that owner or operator has not complied with the requirements of this section; or (3) The owner or operator of the facility violates Rule 336.1901 of the Michigan Administrative Code. (k) Section definitions. For purposes of this section, the following words and phrases shall have the meanings respectively ascribed to them by this section. Words and phrases not defined in this section shall have the meanings as defined in Sec. 13-542 or in Part 55 of the Michigan Natural Resources and Environmental Protection Act, Act 451 of 1994, MCL 324.5501 et seq., or Michigan Administrative Code, Rule 336.1101 et seq.: (1) Qualified bulk solid materials. Means bulk solid materials that satisfy all of the following: a. Are bulk solid materials as defined in Sec. 13-542; b. Are not carbonaceous bulk solid material; and c. Are a fugitive dust source or a potential fugitive dust source. (Ord. No. 24-1815, 4-23-24)

Ask a question about Dearborn law

Corpus searches the Dearborn sections it holds and shows the ones that match, with their citations. Free, no sign-in.