§ 13-547 — Fugitive dust plan; change or expansion in operations; submission and review; public notice; contents

Code of Ordinances of the City of Dearborn, Michigan (2026 S-07: Code and Zoning updated through September 22, 2026) · Dearborn City Code § 13-547

Corpus is an independent public-information project, not the official City of Dearborn website. Stable reference: corpuslaw.us/code/15fe469c-91da-446c-b464-f2dc018d0d0a

Sec. 13-547. Fugitive dust plan; change or expansion in operations; submission and review; public notice; contents.

(a) Fugitive dust plan. The fugitive dust plan shall be submitted along with an application for a certificate of operation. Every owner or operator of a facility must prepare, submit, and follow a fugitive dust plan that complies with the following requirements: (1) Pre-existing facilities. Subject to Sec. 13-544, all facilities operating pursuant to a valid certificate of occupancy on the effective date of the ordinance that enacted this article, the first fugitive dust plan shall be submitted within 90 days of the effective date of the ordinance that enacted this article along with the initial application for a certificate of operation. (2) New and expanding facilities. For new facilities, or expansions or changes of existing facilities, that come into operation after the effective date of the ordinance that enacted this article, except those portions of expanded facilities in operation on the effective date, the first fugitive dust plan shall be submitted with the facility’3.00 shall apply. (3) Change or expansion in facility operations. If any part of the facility’s operation changes or expands, then, at least 30 days before the expansion or change in operation, the facility owner or operator shall notify the department director, submit an application to amend the certificate of operation, and submit a revised fugitive dust plan or establish to the department director’s satisfaction that the expanded or changed operation will be compliant with the existing fugitive dust plan. For purposes of determining whether an existing facility has expanded, the criteria set forth in Zoning Ordinance Article 3.00 shall apply. (4) Annual plan updates. Every owner or operator of a facility shall update their fugitive dust plan on an annual basis as part of the annual renewal application for a certificate of operation. The annual update shall be due one year to the date that the previous plan was approved by the department. (5) Review of fugitive dust plan and public input. The department shall review and approve all fugitive dust plans and all updates to fugitive dust plans. The department shall not approve any fugitive dust plan or any update to a fugitive dust plan required under this article until the public has had an opportunity to submit written comments on the fugitive dust plan. a. Public notice. The department shall post public notice of any new fugitive dust plan or any amendment to an existing fugitive dust plan on the city’s website. The department shall accept comments for a period of not less than 30 days from the date of the notice. The department shall not make a decision on the proposed fugitive dust plan or amendment until after the close of the public comment period. b. Disapproval of plan. If the department finds that the submitted fugitive dust plan is missing any required information or is insufficient to ensure compliance with this article, the department shall reject the fugitive dust plan. The applicant may resubmit a fugitive dust plan for review subject to the public notice and comment requirements of this subsection. (6) Approval requirement. Subject to the provisions of this article, an approved fugitive dust plan is required in order to obtain a certificate of operation. (7) Fugitive dust plan contents. Each fugitive dust plan must include, at a minimum, the following: a. The name and address of the facility. b. The name, address, and contact information of the owner or operator responsible for implementation of the fugitive dust plan, including phone contact, 24-hour emergency contact information, and email address. c. A site map, drawn to scale, in conformance with the requirements and standards of Zoning Ordinance Section 32.02, and providing the following additional information: 1. Facility boundaries; 2. All buildings, internal roadways, and utilities on facility property; 3. All roadways and transportation corridors within one quarter mile of the perimeter of the facility that are used for transport of material to or from the facility; 4. The location of all floor drains, storm drains, and storm water outfalls; 5. All potential emission points at the facility, including a depiction of the footprints of all bulk solid material storage piles, transfer points, conveyors, and roadways; and 6. The location of all fugitive dust control devices and monitoring devices, including the fugitive dust monitor and wind monitor. d. A description of the facility’s operations, including a list of all bulk solid materials handled at, processed at, or transported to, from, or within the facility. e. A description of the truck routes within one quarter mile of the perimeter of the facility that are used to transport material to and from the facility, including an explanation of how dust will be minimized during transport (e.g., travel on paved roads where possible, minimize truck speeds, etc.), and a description of the measures that will be used to ensure trucks are cleaned of loose material before they leave the facility. f. A calculation showing the facility’s maximum total outdoor bulk storage material storage capacity in tons or cubic yards. In the first fugitive dust plan, due within 90 days after the effective date of the ordinance that enacted this article, the calculation shall be certified by signature of an authorized representative of the owner or operator and shall be accompanied by evidence of authority to sign on behalf of the owner or operator. g. A description of all control measures, devices, and technologies to be used to minimize and control fugitive dust, a description of how all control measures, devices, and technologies will be actively maintained and calibrated to ensure their continued effectiveness, and a description of the training provided to staff regarding the proper application and operation of all such control measures, devices, and technologies. h. A dust monitoring plan that describes: 1. A description of the type, placement, operation, and maintenance of PM10 monitors. 2. The schedule and plan for quarterly testing to ensure compliance with this article. Such testing shall be: a. Conducted by a professional trained and certified to read opacity in accordance with the measurement method specified in Sec. 13-548; and b. Conducted during a range of weather conditions to ensure that representative conditions at the facility are covered. 3. A description of the facility’s recordkeeping system, which shall include a schedule for routine inspection, testing, and maintenance. i. A contingency plan describing the owner’s or operator’s planned response activities when PM10 exceeds the reportable action level. The response activities should consist of a range of increasingly aggressive measures appropriate to different levels of exceedance. j. A contingency plan for an alternative method of monitoring in the event of malfunction or failure of any required PM10 monitors. k. Other information as the department may require to facilitate its review of the fugitive dust plan. l. A fact sheet or executive summary of the fugitive dust plan designed to inform the public of the facility’s plan to control and minimize fugitive dust, which may be posted on the city’s website. (Ord. No. 24-1815, 4-23-24)