For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-1339 — Banners on rights-of-way

Code of Ordinances of the City of Dearborn, Michigan (2026 S-07: Code and Zoning updated through September 22, 2026) · Dearborn City Code § 5-1339

Corpus is an independent public-information project, not the official City of Dearborn website. Stable reference: corpuslaw.us/code/a9803921-fa37-40ec-8ee2-6d27c239986e

Sec. 5-1339. Banners on rights-of-way.

(a) Purpose. The purpose of this section is to allow the city and city authorities permitted by law, including but not limited to the Downtown Development Authority (DDA) and Warren and Dix-Vernor Corridor Authority, to promote city and authority sponsored events or activities. (b) Eligibility. Banners may display corporate logos or similar endorsements as long as they do not occupy a total of more than ten percent of the banner size. (c) Regulations. The Director of Public Works, or his designee, may regulate the installation and maintenance the banners, and impose any other conditions in the interest of the appearance of the street, as well as traffic and pedestrian safety, that are consistent with this article and the city’s Code of Ordinances and Zoning Ordinance. (d) Banner requirements. Vertical (utility pole) mounted banners shall conform to the city's existing brackets and shall have a dimension of 30 inches wide by 94 inches tall with a two inch hemmed sleeve at the top and bottom. A brass grommet shall be installed at the top and bottom to secure the banner with nylon tie-wraps. Banners shall be professionally constructed of suitable outdoor material (vinyl, sunbrella, canvas, nylon, polyester) so as to guarantee durability for the period installation. Suitable wind slits must be provided. Banners must not interfere with any traffic control devices, streetlights or streetlight controls and shall be mounted at least 12 feet above the sidewalk surface. Banners proposed for installation on bridge/overpass railings will be reviewed on a case-by-case basis. (e) Installation requirements. The permittee shall be solely responsible for the installation, maintenance and removal of the banners. To guarantee safety and minimize interference with traffic flow, all installation work shall be performed between 9:00 a.m. and 4:00 p.m. on weekdays, or during daylight hours on weekends. Pole-mounted banners may only be installed on fiberglass banner rods attached to poles by metal brackets. Only a contractor that is licensed and bonded to work in the city right-of-way may perform installations. Proper safety procedures and temporary traffic control devices must be used during the installation. A detailed schedule of banner installation must be submitted to the Director of Public Works at least seven days in advance of the proposed installation date. The director may require revisions to the schedule for purposes of safety, traffic flow or other reasons. After approval of the schedule by the director, any changes proposed by the permittee must be communicated immediately to the director and shall not be implemented until further approvals are obtained. The city will not install, maintain or remove banners except that if the permittee fails to comply with the requirements of this section, the city may abate any non-compliant banners and impose costs and fees as provided in subsection (n). In addition, the permittee will not be allowed to apply for banner permits in the future. The city will not provide any facilities for the storage of banners awaiting installation, or for equipment used in the installation process. (f) Utility pole/streetlight damage liability. The permittee shall be responsible for all costs to repair damage to utility poles, streetlights or other facilities, caused during installation, occupancy or removal of banners. (g) Duration of banner installations. Permits will not be issued for installation of banners for periods in excess of 90 days. Banners promoting events or activities must be removed within seven days of the conclusion of the event or activity. (h) Insurance. The permittee shall furnish insurance as specified. An insurance carrier must be licensed to do business in the State of Michigan. Insurance must be provided on a comprehensive form to include the following: (1) General liability insurance: Occurrence policy with a limit of not less than $1,000,000.00 per occurrence and $2,000,000.00 aggregate. The following endorsements must be included: a. Products/completed operations. b. Contractual liability. c. Personal injury. (2) Workers compensation insurance as required by State of Michigan law. a. Michigan Statutory coverage. b. Employers Liability: $500,000.00. (3) Auto liability coverage of $1,000,000.00 for all owned, scheduled, hired or non-owned vehicles. (i) Application deadlines. All permit applications must be submitted at least 60 days prior to the desired date of installation of the banners. This period is necessary to complete coordination efforts between the city and other affected organizations, such as the Michigan Department of Transportation (MDOT), Wayne County and utility companies. (j) Application procedures. The applicant must complete the city's banner application and submit it to the Director of Public Works. The application requires certain information, including: (1) The purpose of the organization, as well as the event or activity; (2) Dates and times during which the banners will be installed, displayed and removed; (3) Dates and times of the event or activity (if applicable); (4) Location and number of banners with specific utility pole/street light pole locations; (5) Color sample of the banner's design and content, as well as details of construction and materials; (6) Deposit in the form of a check payable to the City of Dearborn (see subsection (l)). (k) Application processing. Applications will be accepted on a "first-come, first-served" basis. In the event of dual and competing requests, the application with the earliest postmark shall be given priority, unless one of the applicants has received prior approval from the city, in which case that applicant will retain the first right of refusal. The city reserves the right to deny applications that are incomplete, do not meet the requirements of this policy, or represent an unreasonable burden on the city's resources. (l) Deposit. Upon submission of the permit application, the permittee shall provide a refundable deposit of $300 to cover costs to the city in the event of the permittee's non-compliance with this policy. The deposit will be refunded if the permit request is denied, the permittee has complied with all requirements of this policy, including removal of the banners by the stated removal date and after inspection by the city determines that no significant damages to poles, brackets, rods or other facilities has occurred as a result of the banner installation, occupancy and removal, or the permittee does not proceed with installation of the banners. (m) Fees. Within seven days of permit approval, the permittee shall provide to the city a fee of $100, plus $10 per banner. Such fees shall only cover the period for which the banner permits is granted and shall not be applied to any subsequent permits or permit renewals. The program fee is required to cover the costs of administering the banner permit program, minor maintenance, and repair to facilities resulting from the installation, occupancy and removal of the banners. If, after approval of the permit application, the permittee does not proceed with the banner installation, the program fee shall be refunded, less $50, to cover the city's administrative costs. (n) Maintenance. Throughout the display period, the permittee shall inspect the banners and brackets and make repairs or adjustments as required to guarantee safety and proper appearance. If the city notifies the permittee of a maintenance requirement, the permittee shall complete the necessary repairs or adjustments within 24 hours. Failure to complete such corrective action within the 24-hour period shall result in the city initiating action to perform the corrections and billing all costs, plus an administrative fee of $500, to the permittee. (o) Permits and requirements of other agencies and utilities. The majority of the utility and streetlight poles located in the city are located within the rights-of-way of MDOT and Wayne County. In addition, DTE Entergy, MDOT or the county owns most of these facilities. Each of these organizations requires specific permits to occupy the rights-of-way and to attach to their facilities. These organizations will not issue banner permits to individuals or organizations, only to the local unit of government (city). These requirements place specific burdens on the city in terms of coordination, application processes and liability. The city may require that the banner permittee pay for costs associated with these efforts. Such costs shall be determined by the city in advance of approval of the permit application. The applicant may withdraw the application if these costs are not acceptable. In such cases, the applicant's deposit and the program fee shall be refunded. (Ord. No. 17-1569, - -17; Ord. No. 18-1621, 7-17-18; Ord. No. 23-1804, 1-9-24)

Ask a question about Dearborn law

Corpus searches the Dearborn sections it holds and shows the ones that match, with their citations. Free, no sign-in.