For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 43-6-27 — Construction of driveways generally

2019 Detroit City Code (Supp. No. 4: codified through Ordinance No. 2024-17, effective March 26, 2024, and Ordinance No. 2024-32, effective June 25, 2024) · Detroit City Code § 43-6-27

Corpus is an independent public-information project, not the official City of Detroit website. Stable reference: corpuslaw.us/code/9682f903-4e4d-402e-9afb-20337c7f664d

Sec. 43-6-27. - Construction of driveways generally.

All driveways crossing sidewalk space shall be constructed of concrete from the curbline to the lot line and placed, at a grade to be fixed by the Director of the Department of Public Works, according to specifications furnished by the Director, provided, that driveways constructed on unpaved streets may be constructed of crushed stone, slag, crushed brick, or bituminous material from the outer line of the gutter to the sidewalk.

(Code 1964, § 58-3-14; Code 1984, § 50-4-22)

Ask a question about Detroit law

Corpus searches the Detroit sections it holds and shows the ones that match, with their citations. Free, no sign-in.