§ 8-13-13 — Additions to Section 3 of ASME Standard, Equipment Design and Construction Requirements

2019 Detroit City Code (Supp. No. 4: codified through Ordinance No. 2024-17, effective March 26, 2024, and Ordinance No. 2024-32, effective June 25, 2024) · Detroit City Code § 8-13-13

Corpus is an independent public-information project, not the official City of Detroit website. Stable reference: corpuslaw.us/code/821055e8-5734-4bae-909e-65459295d6d5

Sec. 8-13-13. - Additions to Section 3 of ASME Standard, Equipment Design and Construction Requirements.

Section 3 of the ASME Standard, Equipment Design and Construction Requirements, is amended to read as follows: 3.1.4.1 Sign required on platform. The manufacturer shall permanently and conspicuously affix a metal sign with letters at least one-half inch in height on the platform, indicating the maximum loads, which shall read as follows: MAXIMUM CAPACITY PERSONS: [MAXIMUM NUMBER] Materials and equipment: Only those necessary for window washing, exterior building maintenance, or inspection and maintenance of the hoist. Max. Concentrated Load:_______ Max. Capacity Load:___________ 3.3.3 Operating Controls for Powered Roof Carriage. [Subsections (a) and (b)] (c) Powered platforms designed for use by two individuals shall be provided with two continuous pressure, weatherproof, electric type controls. The platform shall be provided with an approved means of preventing the platform from inclining more than eight degrees out of level and/or an approved alarm which will sound when the platform inclines eight degrees or more out of level. 3.10.9 Replacement of wire ropes. The wire ropes used in hoisting the powered platform shall be replaced whenever there are six or more broken wires in any one lay of the wire rope, or whenever the ropes are damaged or in a deteriorated condition, but in any case at intervals not in excess of the following: Drum or Sheave Diameter/Rope Diameter Ratio | Replacement- Maximum Interval 10 to less than 20 | 18 months 20 to less than 30 | 24 months 30 to less than 40 | 30 months 40 and over | 36 months 3.10.10 Four-point suspension required. Powered platforms shall be suspended by at least four wire ropes attached at points not more than 25 percent of the length of the platform measured from each end of the platform, provided, that the Buildings, Safety Engineering, and Environmental Department may accept two wire ropes used for actually hoisting the platform if a least two other wire ropes, serving as approved safety back-up suspension means in the judgment of the Department, are installed.

(Code 1964, §§ 5.2, 5.3, 5.6, 5.7; Ord. No. 310-H, § 1(5.2, 5.3, 5.6, 5.7), eff. 3-2-1979)