For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-2-7 — Additions to Section 109 of 2015 Michigan Building Code, Fees

2019 Detroit City Code (Supp. No. 4: codified through Ordinance No. 2024-17, effective March 26, 2024, and Ordinance No. 2024-32, effective June 25, 2024) · Detroit City Code § 8-2-7

Corpus is an independent public-information project, not the official City of Detroit website. Stable reference: corpuslaw.us/code/869a8f19-3ccb-4e65-a901-9fd8fb256803

Sec. 8-2-7. - Additions to Section 109 of 2015 Michigan Building Code, Fees.

In accordance with Section 8b(11) of the Stille-DeRossett-Hale Single State Construction Code Act, being MCL 125.1508b(11), the City adds to Section 109 of the 2015 Michigan Building Code, Fees, the following provisions, which were contained in the 1984 Detroit City Code prior to July 31, 2001 and concern administration and enforcement: 109.1 Establishment and approval of fees; payment of fees required before work begins. (a) In accordance with Sections 10(1) and 22(1) of the Stille-DeRossett-Hale Single State Construction Code Act, being MCL 125.1510(1) and 125.1522(1), and Section 9-507 of the Charter, the Director of the Buildings, Safety Engineering, and Environmental Department is authorized to establish necessary fees with the approval of the City Council, through adoption of a resolution, for the cost of appeals, examinations, certificates, permits, inspections, re-inspections, and other fees that are required by the 2015 Michigan Building Code and by Chapter 8, Article II, of 2019 Detroit City Code, Building Code, provided, that the following formulae shall be included in each fee resolution: (1) The fee for a building permit shall be based on the volume of the building or structure, the total cost of improvement, and a schedule of unit costs for buildings and structures of all use and occupancy groups in Chapter 3 of this code and types of construction in Chapter 6 of this code; and (2) The fee for a wrecking permit shall be based on the volume of the building or structure as follows: (a) Buildings and structures with basements or cellars: The volume of the building or structure shall include all enclosed dormers, porches, penthouses, and other enclosed portions of the building or structure extending from the basement or cellar floor to the mean height of a pitched roof, or the average height to the top of the roof beams of a flat roof; (b) Buildings and structures without basements or cellars: The volume shall be based on the height measured to a level located one-fifth of the distance from the first floor level to the bottom of the footings, but not to exceed 2½ feet below the first floor level; and (c) Open buildings and structures: The volume shall be measured within the perimeter of the roof for a height from the grade line to the main roof level. The fees that are authorized by this subsection shall cover the costs that are incurred by the Buildings, Safety Engineering, and Environmental Department when rendering such services in the administration and enforcement of this article. (b) In accordance with Section 6-503(13) of the 2012 Detroit City Charter, the Director of the Buildings, Safety Engineering, and Environmental Department shall establish and collect necessary fees with the approval of the City Council, through adoption of a resolution, for the cost of licenses that are required by this article. (c) After adoption of a resolution by the City Council and approval of the resolution by the Mayor, the fees that are provided for in Subsections (a) and (b) of this section shall be: (1) Published in a daily newspaper of general circulation and in the Journal of the City Council; (2) Made available at the Buildings, Safety Engineering, and Environmental Department and at the Office of the City Clerk; and (3) Reviewed by the Director of the Buildings, Safety Engineering, and Environmental Department at least once every two years. (d) The fees prescribed by this section shall be paid to the Buildings, Safety Engineering, and Environmental Department before a permit to begin work for new construction, alteration, removal, demolition, or other building operation may be issued. In addition, an amendment to a permit necessitating an additional fee shall not be approved until the additional fee is paid. R 408.30408 [Note: Sections 109.2 through 109.6 of the International Building Code, 2015 Edition, were not adopted by the Director of the Michigan Department of Licensing and Regulatory Affairs.] 109.7 Fee refunds. Except for a permit that is fraudulently obtained, a permit issued under the provisions of this article may be canceled by the Building Official on the written request from the holder of such permit, provided, that such request is made within 180 days from the date of issuance of the permit and prior to any inspection or other action taken under the permit, including any exercise of privileges granted by the permit. In the event that any permit is canceled, the City Treasurer, upon notification in writing from the Building Official, shall make a refund of 80 percent of all fees paid in connection with the issuance of such unused permit, provided, that where a permit expires, a refund shall not be granted but the permit may be reinstated in accordance with Section 105.5 of this code. 109.8 Fee for failure to obtain permit before starting work. Any individual who, or partnership, firm or corporation which, commences work for which a permit is required by this code, without first having obtained a permit, shall pay, if legally authorized and subsequently allowed to obtain a permit, in addition to the permit fee specified by this code for such installation, a supplemental inspection fee to cover the cost of the services rendered by the Buildings, Safety Engineering, and Environmental Department, provided, that this requirement shall not apply to emergency work or installation when proved to the satisfaction of the Buildings, Safety Engineering, and Environmental Department that such work or installation was urgently necessary, and would have been impractical to have awaited the time required for application and issuance of the permit, provided further, that, even in such an emergency, the required permit shall be obtained without unreasonable delay after installation starts, and in no case more than three days during which the Buildings, Safety Engineering, and Environmental Department is open for business, or a supplemental inspection fee shall be charged in addition to the permit fee.

(Code 1964, §§ 12-11-18.1, 12-11-22.1, 12-11-22.2, 12-11-22.3, 12-11-22.4, 12-11-23.2, 12-11-23.3, 12-11-23.4; Ord. No. 290-H, § 1(12-11-18.1, 12-11-22.1, 12-11-22.2, 12-11-22.3, 12-11-22.4, 12-11-23.2, 12-11-23.3, 12-11-23.4), eff. 11-15-1978; Code 1984, § 12-11-22.3; Ord. No. 15-88, § 1(12-11-22.3), eff. 9-21-1988)

Ask a question about Detroit law

Corpus searches the Detroit sections it holds and shows the ones that match, with their citations. Free, no sign-in.