§ 8-6-7 — Additions to Section 106 of 2015 Michigan Rehabilitation Code for Existing Buildings, Construction Documents
2019 Detroit City Code (Supp. No. 4: codified through Ordinance No. 2024-17, effective March 26, 2024, and Ordinance No. 2024-32, effective June 25, 2024) · Detroit City Code § 8-6-7
Corpus is an independent public-information project, not the official City of Detroit website. Stable reference: corpuslaw.us/code/019597f9-9801-4f61-9bb7-8cbc073a77f8
Sec. 8-6-7. - Additions to Section 106 of 2015 Michigan Rehabilitation Code for Existing Buildings, Construction Documents.
In accordance with Section 8b(11) of the Stille-DeRossett-Hale Single State Construction Code Act, being MCL 125.1508b(11), the City adds to Section 106 of the 2015 Michigan Rehabilitation Code for Existing Buildings, Construction Documents, the following provisions, which were contained in the 1984 Detroit City Code prior to July 31, 2001, and concern administration and enforcement: 106.1 Submittal of documents. Construction documents, special inspection and structural observation programs, investigation and evaluation reports, and other data shall be submitted in three sets with each application for a permit. The construction documents shall be prepared by, or under the direct supervision of, a registered design professional when required by 1980 P.A. 299, being MCL 339.101 to 339.2721. When special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional. Exception: The Building Official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that reviewing of construction documents is not necessary to obtain compliance with this code. R 408.30562 106.3.1 Approval of construction documents. When the Code Official issues a permit, the construction documents shall be approved, in writing or by stamp, as "Reviewed for Code Compliance." One set of the three sets of construction documents so reviewed shall be retained by the Code Official. The second and third sets shall be returned to the applicant. The second set shall be kept by the applicant at the work site, and be open to inspection by the Code Official or a duly authorized representative while the third set shall be retained by the applicant for his or her records.
Ask a question about Detroit law
Corpus searches the Detroit sections it holds and shows the ones that match, with their citations. Free, no sign-in.