§ 34-303 — Stormwater control requirements
Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 34-303
Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/49a2e8e9-3fa2-4609-8a35-d9c145d52f14
Sec. 34-303. - Stormwater control requirements.
(a) Any development or redevelopment meeting the applicability criteria established in section 34-301 and section 34-302 must meet the following minimum stormwater management control criteria: (i) The following volume/channel protection criteria shall be met. No net increase in site runoff volume and peak flow rate from storm events up to the two-year, 24-hour event from predevelopment conditions. Specific details for compliance with this requirement are outlined in the City of East Lansing's Post-Construction Stormwater Management Guidance Manual consisting of this stormwater ordinance, the policy and procedures manual and the design manual. (ii) The following peak rate/flood control criteria shall be met. The peak discharge rate from all storms up to the 100-year, 24-hour event shall not be greater than predevelopment discharge rates. Where the runoff volume is not increased from the predevelopment condition, the peak rate corresponding to the same storms is considered controlled. If specific watershed conditions require additional peak rate control, the City of East Lansing can a) restrict the peak discharge from the 100-year, 24-hour event to a fixed release rate; or b) require additional runoff volume reduction. Specific details for compliance with this requirement are outlined in the City of East Lansing's Post-Construction Stormwater Management Guidance Manual consisting of this stormwater ordinance, the policy and procedures manual and the design manual. (iii) The following water quality criteria shall be met. Water quality criteria are met when (a) the minimum treatment volume control criteria of one inch of runoff from the entire site is retained and (b) when the following total suspended solids (TSS) criteria are met: (i.) A minimum of 80 percent of TSS has been removed as compared with uncontrolled runoff, or (ii.) A minimum discharge concentration of TSS not to exceed 80 mg/l is met. If the required minimum TSS levels are not met by the capture of one inch of runoff from the entire site, then additional treatment methods must be designed to meet the minimum TSS removal requirements. Specific details for compliance with this requirement are outlined in the City of East Lansing's Post-Construction Stormwater Management Guidance Manual consisting of this stormwater ordinance, the policy and procedures manual and the design manual. (iv) In all cases the development or redevelopment shall preserve the primary and secondary drainageways which are needed to serve stormwater management needs of other properties.
(Ord. No. 1367, 2-16-2016)
Ask a question about East Lansing law
Corpus searches the East Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.
