§ 34-402 — Contents of post construction stormwater management concept plan (stormwater plan)
Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 34-402
Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/41a3322a-ed6f-483d-9fa4-a5b49c4f8e29
Sec. 34-402. - Contents of post construction stormwater management concept plan (stormwater plan).
(a) The post construction stormwater management concept plan (stormwater plan) shall utilize to the maximum extent practicable low impact development site planning and design techniques that reduce runoff rates, volumes, and pollutant loads. Such techniques include, but are not limited to, minimization and/or disconnection of impervious surfaces; development design that reduces the rate and volume of runoff; restoration or enhancement of natural areas such as riparian areas, wetlands, and forests; and distributed practices that intercept and treat runoff from developed areas. (b) The stormwater plan shall be prepared in accordance with section E of the stormwater policy and procedures manual.
(Ord. No. 1367, 2-16-2016)
Ask a question about East Lansing law
Corpus searches the East Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.
