For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-72 — General requirements

Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 34-72

Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/f21ba81b-89b2-41ff-83e0-61e1278a1558

Sec. 34-72. - General requirements.

(a) Any earth changes shall be conducted in such a manner which will effectively reduce accelerated soil erosion and resulting sedimentation. (b) All persons engaged in earth changes shall design, implement and maintain acceptable soil erosion and sedimentation and control measures, in conformance with part 91 of Public Act No. 451 of 1994, as amended, and all official rules promulgated pursuant thereto, which are hereby adopted by reference as part of this Code. (c) All earth changes shall be designed, constructed, and completed in such a manner which shall limit the exposed area of any disturbed land for the shortest possible period of time. (d) Sediment caused by accelerated soil erosion shall be removed from runoff water before it leaves the site of the earth change. (e) Any temporary or permanent facility designed and constructed for the conveyance of water around, through, or from the earth change area shall be designed to limit the water flow to a non-erosive velocity. (f) A person shall install temporary soil erosion and sedimentation control measures before or upon commencement of the earth change activity and shall maintain the measures on a daily basis. A person shall remove temporary soil erosion and sedimentation control measures after permanent soil erosion measures are in place and the area is stabilized. A person shall stabilize the area with permanent soil erosion control measures under approved standards and specifications as prescribed by section 34-74. (g) A person shall complete permanent soil erosion control measures for all slopes, channels, ditches, or any disturbed land area within five calendar days after final grading or the final earth change has been completed. If it is not possible to permanently stabilize a disturbed area after an earth change has been completed or if significant earth change activity ceases, then a person shall maintain temporary soil erosion and sedimentation control measures until permanent soil erosion control measures are in place and the area is stabilized. (h) The applicant for a building permit shall file with his/her request a contour map showing the proposed contours of the land after the completion of the final grading of the land. Such map shall show the grading of the site and contour of the land of that site in relation to adjoining properties. The map must contain a certification by a professional engineer, architect, landscape architect, or registered land surveyor that the finished topography of the site will not have any adverse effect on adjoining lands because of any change in the flowage of surface water. The requirement and acceptance of the contour map shall not impose any liability upon the city, nor does the city incur any further duty of enforcement of the grading of the property.

(Code 1994, ch. 102, § 8.313; Ord. No. 961, 5-21-2002)

Ask a question about East Lansing law

Corpus searches the East Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.