Sec. 42-275. - Provider and authority responsibilities; application information; shot clocks; tolling; deemed approved; basis for denial; resubmittal; batch applications; application fees; micro wireless facility exemption; alternate siting; decommissioning sites.
(a) This section applies to activities of a wireless provider within the public right-of-way. (b) Except as otherwise provided in subsection (e) below, the provider/applicant shall seek an authority ROW access permit to colocate a small cell wireless facility or install, modify, or replace a utility pole on which a small cell wireless facility will be colocated as required of all ROW users. The processing of an application for such a permit is subject to all of the following: (1) In-kind contributions to the authority are not permitted in lieu of rates and fees described above. (2) The provider shall provide all the information and documentation required by the authority to enable the authority to make an informed decision with regard to its criteria for authorizing ROW access including the following: a. A certificate of compliance with FCC rules related to radio frequency emissions from a small cell wireless facility; b. Proof of notification to every other affected authority and all necessary permits, permit applications, or easements to ensure all necessary permissions for the proposed activity are obtained; [and] c. An attestation that the small cell wireless facilities will be operational for use by a wireless services provider within one year after the permit issuance date. Failure to abide by this term shall result in termination of any permit issued in reliance on such attestation. (3) Within 25 days after receiving an initial application, the authority shall notify the applicant in writing whether the application is complete. If incomplete, the notice will delineate all missing documents or information. The notice tolls the running of the time for approving or denying an application under subsection (5) below. (4) If the applicant makes a supplemental submission in response to the authority's notice of incompleteness, the authority will so notify the applicant in writing within ten days, delineating the previously requested and missing documents or information. The time period for approval or denial is tolled in the case of second or subsequent notices under the procedures identified in subsection (3), above. (5) The authority shall approve or deny the application and notify the applicant in writing within the following period of time after the application is received: a. Colocation shot clock. For an application for the colocation of small cell wireless facilities on a utility pole, 60 days, subject to the following adjustments: 1. Add 15 days if an application from another wireless provider was received within one week of the application in question. 2. Add 15 days if a timely extension is requested. b. New or replacement 40-foot pole and limited equipment. For an application for a new or replacement utility pole that meets the height requirements of section 42-274(e)(1) and associated small cell facility, 90 days, subject to the following adjustments: 1. Add 15 days if an application from another wireless provider was received within one week of the application in question. 2. Add 15 days if a timely extension is requested. (6) Deemed approved. A completed application is considered to be approved if not timely acted upon by the authority and, if the authority receives a notice not less than seven days before, the applicant may proceed with the work pursuant to this automatic approval. (7) Basis for denial. The authority may deny a completed application for a proposed colocation of a small cell wireless facility or installation, modification, or replacement of a utility pole that meets the height requirements in section 42-274(e)(1) if the proposed activity would do any of the following: a. Materially interfere with the safe operation of traffic control equipment. b. Materially interfere with sight lines or clear zones for transportation or pedestrians. c. Materially interfere with compliance with the Americans with Disabilities Ordinance of 1990, Public Law 101-336, or similar federal, state, or local standards regarding pedestrian access or movement. d. Materially interfere with maintenance or full unobstructed use of public utility infrastructure under the jurisdiction of an authority. e. With respect to drainage infrastructure under the jurisdiction of an authority, either of the following: 1. Materially interfere with maintenance or full unobstructed use of the drainage infrastructure as it was originally designed. 2. Not be located a reasonable distance from the drainage infrastructure to ensure maintenance under the drain code of 1956, 1956 PA 40, MCL 280.1 to 280.630, and access to the drainage infrastructure. f. Fail to comply with reasonable, nondiscriminatory, written spacing requirements of general applicability adopted by resolution that apply to the location of ground-mounted equipment and new utility poles and that do not prevent a wireless provider from serving any location. g. Fail to comply with all other applicable codes. h. Fail to comply with section 42-274(g) or (h). i. Fail to meet reasonable, objective, written stealth or concealment criteria for small cell wireless facilities applicable in a historic district or other designated area, as specified in an ordinance or otherwise and nondiscriminatorily applied to all other occupants of the ROW, including electric utilities, incumbent or competitive local exchange carriers, fiber providers, cable television operators, and the authority. (8) Reasons for denial; resubmission and 30-day shot clock. If the completed application is denied, the notice under subsection (7) shall explain the reasons for the denial and, if applicable, cite the specific provisions of applicable codes on which the denial is based. The applicant may cure the deficiencies identified by the authority and resubmit the application within 30 days after the denial without paying an additional application fee. The authority shall approve or deny the revised application within 30 days. The authority shall limit its review of the revised application to the deficiencies cited in the denial. (9) Batch applications. An applicant may file an application and receive a single permit for the colocation of up to 20 substantially similar small cell wireless installations. The authority may approve or deny one or more small cell wireless facilities included in such consolidated application. (10) Approval of an application authorizes the wireless provider to undertake the installation, colocation and maintenance of such facilities. (11) The authority shall not institute a moratorium on filing, receiving, or processing applications or issuing permits for the colocation of small cell wireless facilities or the installation, modification, or replacement of utility poles on which small cell wireless facilities will be colocated. (12) The authority and an applicant may extend a time period under this subsection by mutual agreement. (c) Application fee for a permit under section 42-275 shall be the lesser of the following: (1) Two hundred dollars for each small cell wireless facility alone. (2) Three hundred dollars for each small cell wireless facility and a new utility pole to which it will be attached. (d) The authority may revoke a permit, upon 30 days' notice and an opportunity to cure, if the permitted small cell wireless facilities and any associated utility pole fail to meet the requirements of this article. (e) Micro wireless facility exempt. The authority shall not require a permit or any other approval or require fees or rates for ordinance compliant replacement, maintenance or operation of a small cell wireless facility or ordinance compliant installation, replacement, maintenance or operation of a micro wireless facility that is suspended on cables strung between utility poles or wireless support structures in compliance with applicable codes. (f) Alternate siting. Upon receipt of an application to place a new utility pole, the authority may propose and the applicant shall use an alternate location within the ROW or on property or structures owned or controlled by an authority within 75 feet of the applicant's proposed location if reasonably achievable. (g) Decommissioning sites. A wireless provider shall notify the authority in writing before discontinuing use of a small cell wireless facility, utility pole, or wireless support structure. The notice shall specify when and how the wireless provider intends to remove the small cell wireless facility, utility pole, or wireless support structure. The wireless provider shall return the property to its pre-installation condition. If the wireless provider does not complete the removal within 45 days after the discontinuance of use, the authority may complete the removal and assess the costs of removal against the wireless provider. A permit under this section for a small cell wireless facility expires upon removal of the small cell wireless facility. (h) A provider shall obtain a permit for any work that will affect traffic patterns or obstruct vehicular or pedestrian traffic in the ROW.
(Ord. No. 1459, 11-19-2019)