§ 50-105 — Traffic impact study requirements
Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 50-105
Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/09e913b0-a69d-4e3c-af47-7374f7d29653
Sec. 50-105. - Traffic impact study requirements.
The specific information required in the traffic impact study shall be determined at a preapplication conference with the city engineer or his/her designee from the following items: (1) A description of the site, surroundings, and study area including: a. Illustrations. b. A narrative describing the adjacent roadway system. c. The surrounding land uses, expected development in the vicinity which could influence future traffic conditions, special site features and a description of any committed roadway improvements. d. Justification of the study area selected for analysis. (2) A description of the requested rezoning and a comparison of the potential uses allowed under current and proposed zoning. (3) Existing traffic conditions including: a. Peak-hour traffic volumes (and daily volumes if applicable) on street(s) adjacent to the site which are two years old or less. b. Counts and levels of service for intersections in the vicinity which are included in the study area. c. Estimated traffic generated by the current or most recent use of the site. (4) Existing roadway characteristics. (5) Existing driveways and potential turning movement conflicts. (6) Existing right-of-way along with any planned or desired expansion of the right-of-way requested by the city. (7) Traffic crash data and analysis covering the most recent three (3) years for the study area or proximity to site access points. (8) For any project requiring a Traffic Impact Statement with a completion date beyond one year at the time of the traffic study, the study shall also include a scenario analyzing forecast traffic at date of completion along the adjacent street network using a forecast based on a network traffic assignment model, historic annual percentage increases and/or future development in the area which has been approved. (9) Forecasted trip generation of the proposed use for the a.m. and p.m. peak hour and average day. The forecasts shall be based on the data and procedures outlined in the most recent edition of Trip Generation published by the Institute of Transportation Engineers (ITE). The applicant may use other commonly accepted sources of data or supplement the standard data with data from at least three similar projects in Michigan. a. For rezoning requests where a traffic study is required, the study should contrast the traffic impacts of typical uses permitted in the requested zoning district with uses permitted in the current zoning district. The determination of typical uses shall be made by the planning and zoning official. For traffic impact assessments, statements, or regional traffic analyses, the rates or formulas for the specific use(s) proposed shall be used. b. Any trip reduction for pass-by trips, transit, ridesharing, other modes, internal capture rates, etc., shall be based either on ITE findings or documented survey results acceptable to the city. The city may elect to reduce the trip reduction rates used. c. For projects intended to be developed in phases, the trip generation by phase shall be described. (10) Traffic distribution where the projected traffic generated shall be distributed (inbound v. outbound, left turn v. right turn) onto the existing street network to project turning movements at site access points, and nearby intersections where required. Projected turning movements shall be illustrated in the report. A description of the standard engineering procedures for determining the distribution should also be attached. (11) Impact analysis. a. Level of service or capacity analysis at the proposed access points using the procedures outlined in the most recent edition of the Highway Capacity Manual published by the Transportation Research Board. For projects requiring a traffic impact statement or regional traffic analysis, before and after capacity analyses shall also be performed for all street intersections where the expected traffic generated at the site will comprise at least five percent of the existing intersection capacity, and/or for roadway sections and intersections experiencing congestion or a relatively high crash rate, as determined by the city or applicable road agency. b. Gap studies for unsignalized intersections where applicable. c. The city engineer may require a regional traffic analysis which evaluates the impact on the street network over a wide area and/or for up to 20 years for a project of regional significance, if a network model is available. (12) Access design/Access management standards which shall include a map and description of the location and design of proposed access (driveways or new street intersections) including: a. Any sight distance limitations. b. Dimensions from adjacent driveways and intersections within 250 feet on either side of the main roadway. c. Data to demonstrate that the number of access points proposed is the fewest necessary and that they will provide safe and efficient traffic operation based on current standards of the city and other applicable road agencies. (13) Mitigation/alternatives that demonstrate any changes to the level of service achieved by these measures. Any alternatives or suggested phasing of improvements should be described. The mitigation measures may include items such as roadway widening, need for bypass lanes or deceleration tapers/lanes, changes to signalization, use of access management techniques or a reduction in the proposed intensity of use. Proposed mitigation measures should be discussed with the applicable road agency. The responsibility and timing of roadway improvements shall be described. (14) Description of any needed nonmotorized facilities. (15) Description of site circulation and available sight distances at site driveways. (16) If the use involves a drive-through facility, the adequacy of the (queuing stacking) area should be evaluated. (17) If a median crossover is desired, separate analysis should be provided. (18) If a traffic signal is being requested, the relationship of anticipated traffic to traffic signal warrants in the Michigan Manual of Uniform Traffic Control Devices. Analysis should also be provided on the impacts to traffic progression along the roadway through coordinated timing, etc. (19) Any additional requirements that may be necessary to reasonably evaluate and mitigate the potential traffic impacts of the proposed development.
(Ord. No. 1162, 4-17-2007)
Ask a question about East Lansing law
Corpus searches the East Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.