For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 50-792 — Regulating plan

Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 50-792

Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/327b47d2-8637-40e4-9264-02683a5aa7b5

Sec. 50-792. - Regulating plan.

East Village District has four form-based zones (Fig. 2): A. Grand River Avenue/Bogue Street Area. B. Grand River Avenue Area I. C. Grand River Avenue Area II. D. Water's Edge Area. Note: Exact boundaries for each zone are subject to change based on development plans that are consistent with the district master plan. [image omitted; see the official code] Figure 2. Regulation plan delineating the four zones of the district E. General requirements for each zone. (1) Intent. The intent of the East Village Form-Based Zoning Codes are to provide for the economic, social, and environmental benefits of the East Village District. (2) Economic. a. In order to maximize the economic benefits of the district, redevelopment plans shall provide for an increase in density of the area while providing a mixture of uses, quality architecture, adequate parking facilities and site access. b. Building height. 1. Buildings in each zone can be up to eight stories or 112 feet in height and may provide a mixture of residential uses or office uses. Depending on the zone in which the building will be constructed, a building may be required to provide for office and retail uses on the first floor of the building. 2. The city council may, upon an affirmative vote of three-fourths of all members of the city council, permit a maximum building height up to ten stories or 140 feet, as long as the additional building height will cause no significant negative impact on adjacent properties, public streets and parking facilities, or public utility and services. 3. Additional stories above the maximum building height may be added in accordance with the provisions of article VII, division 8, building and site incentives. The first floor of any building may include various office, public/semi-public uses and lobbies for upper levels. Traffic impact and parking studies prepared by a professional transportation consultant are required to assure adequate access and that parking is neither insufficient nor excessive to accommodate the proposed mixture of uses. It is the responsibility of the developer to submit the plans prior to receiving preliminary site plan approval. (3) Social. a. In order to maximize the social benefits of the district, redevelopment plans shall provide for services and amenities which diversify such offerings within the zones. b. Class A multi-family redevelopment plans shall provide mixed-market rental units, and may provide owner occupied housing, and low to moderate income housing. c. Redevelopment plans shall demonstrate acceptable motorized and non-motorized circulation through the district and easy access for the surrounding neighborhoods and the university. d. Redevelopment plans shall provide pedestrian-oriented, human-scale, street-level environments. This will be made possible through the requirements for first story transparency, build-to lines, minimum sidewalk widths, minimum and maximum building heights, and landscaping. It is the city's objective that alleys, patio seating, parks, and plazas designed to function for a variety of public events be incorporated through public/private cooperation and partnership as part of redevelopment plans for the district. It is also the city's objective that other elements such as outdoor dining and rooftop gardens be included in redevelopment plans where appropriate. (4) Environmental. a. In order to maximize the environmental benefits of the district, redevelopment plans must protect and improve the condition of the Red Cedar River and its banks. b. When appropriate, the city shall contract a consultant specializing in floodplain/floodway remediation to prepare a floodplain/floodway remediation plan that shall provide the technical information needed to determine where and when remediation would benefit the environmental integrity of the river as well as the development opportunities along the river edge. The city may require, the preparation of a riverbank improvement plan by a consultant specializing in riverbank restoration shall be the responsibility of the developer. Such plan will be secondary to any floodplain/floodway remediation plan. When requested, the plan shall provide the technical information needed to determine where and how to improve the riverbank. The completion of this plan, when required, is necessary in order to grant final approval of redevelopment plans. c. Stormwater management techniques, as determined by the city engineer, shall exceed minimum requirements of the city's stormwater management in areas that have the potential to pose the most significant threat to the quality of the river environment. Stormwater management techniques will also be required to cover as little usable open space as necessary to maintain proper function. This may require underground storage in certain areas. F. Description of East Village Zones. (1) Grand River Avenue Area I and Grand River Area II Zones. a. These two zones are characterized by shallow depth, high visibility along Grand River Avenue, and premium river frontage (Fig. 4). [image omitted; see the official code] Figure 4. Section showing development possibilities in the Grand River Avenue Area Zone utilizing required methods to develop within the confines of the Red Cedar River. b. Note: Project sites may be required to provide a 25-foot riverbank buffer based on the findings of the floodplain/floodway remediation plan. c. Any development frontage on Grand River Avenue is required to comply with setback standards and if the development contains housing, it shall contain a mixture of market rate housing types and contain office and retail uses on the ground floor unless waived by a three-fourths vote of the city council because of the availability of adjacent or nearby retail preexisting uses. (2) Grand River Avenue/Bogue Street Area Zone. a. This zone is characterized by its frontage on two major streets, with increased visibility for businesses and its accessibility from campus. [image omitted; see the official code] Figure 5. A graphic representation looking north on Bogue Street showing the potential character of the district as redeveloped under the intent of the Master Plan, Bondy Studio. b. Redevelopment within this zone is required to meet setback standards and if the redevelopment contains housing, it is required to consist of a mixture of market rate housing opportunities and may provide for owner occupied and/or low to moderate income housing. Redevelopment projects in this zone are also required to contain office and retail uses on the ground floor in any Grand River Avenue frontage unless waived by a three-fourths vote of the city council because of the availability of adjacent or nearby retail preexisting uses. c. Redevelopment projects within this zone with frontage on the river are required to also comply with the standards set forth in subsection E(4). (3) Waters Edge Area Zone. This zone is characterized by its premium river frontage and its central location between the other two zones in the district. The size and shape of the zone could accommodate public spaces large enough to support a variety of public events (Fig. 6). [image omitted; see the official code] Figure 6. A graphic representation showing the character of the Red Cedar River Corridor as intended in the Master Plan, Bondy Studio. a. Redevelopment within this district shall be consistent with all design standards applicable to the district except major street setback requirements. b. Any redevelopment project within this zone that includes frontage on the river must comply with the requirements set forth in subsection F(1)b. above.

(Ord. No. 1139, 6-6-2006; Ord. No. 1270, 5-1-2012; Ord. No. 1403, 8-15-2017; Ord. No. 1429, 7-17-2018; Ord. No. 1462, 2-25-2020; Ord. No. 1536, 11-19-2024)

Ask a question about East Lansing law

Corpus searches the East Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.