§ 27-83 — Utilities
Code of Ordinances of the City of Farmington Hills, Michigan (Codified through Ordinance No. C-9-2025, adopted October 27, 2025. (Supp. No. 36)) · Farmington Hills Code of Ordinances § 27-83
Corpus is an independent public-information project, not the official City of Farmington Hills website. Stable reference: corpuslaw.us/code/9c75360f-71a0-4881-b7b2-204729ed9b35
Sec. 27-83. - Utilities.
(a) Underground wiring. The proprietor and/or subdivider of every subdivision shall make arrangements for all local distribution lines for telephone or electric services, exclusive of main supply and perimeter feed lines when located on section or quarter section lines, to be placed entirely underground throughout a subdivided area; provided, however, that when a subdivision overlaps a section or quarter section line, main supply and perimeter feed lines located on such section or quarter section line shall be placed underground. The planning commission may waive or modify this requirement where, in its judgment, circumstances exist which render compliance impractical. Conduits or cables shall be placed within private easements provided to the service companies by the proprietor and/or subdivider or within public ways. Those telephone and electrical facilities placed in dedicated public ways shall be planned so as not to conflict with other underground utilities. All telephone and electrical facilities shall be constructed in accordance with standards of construction approved by the state public service commission. (b) Sewage disposal. A sanitary sewer system or a septic tank system approved by the county health department and the city engineering division including all appurtenances shall be required in all subdivisions. (c) Water supply. A water distribution system or individual wells shall be required as per plans approved by the council and in conformance with the regulations of the state department of health and the city engineering division relating to municipal water supplies. (d) Storm drainage. (1) Storm drainage shall be provided as per plans approved by the council when required. (2) Adequate provisions shall be made for proper drainage of stormwater runoff from residential rear yards. Each yard shall be self-contained and shall be drained from rear to front except where topography or other natural features require otherwise. (3) Storm sewers shall be provided to accommodate direct underground connections for all sump pumps for the purpose of stormwater drainage. The connection between storm sewers and sump pumps shall be approved by the engineering division. (4) Storm water detention areas shall be provided for all subdivision plats and site condominium plans, subject to the following: a. Open water detention basins shall not be located on a lot or condominium site that is to be used for one-family residential purposes. b. A landscape plan shall be submitted for water detention areas. The plan shall be submitted with the preliminary plan and shall be arranged in accordance with the applicable landscape design principles adopted by the planning commission. c. The minimum distance between the freeboard line of the water detention and any existing or proposed property line of a one-family residential use shall be fifteen (15) feet. This distance may be reduced by the planning commission provided that, the area set aside is equal in square feet to the area that would have been required by fifteen (15) feet. d. Adequate access to the water detention area shall be provided for maintenance purposes. (5) Storm drainage shall be provided in accordance with the engineering design standards adopted by the city.
(Code 1981, § 61.330; Ord. No. C-60-85, § 1, 11-18-85; Ord. No. C-2-01, § 1, 2-12-01; Ord. No. C-11-2005, § 1, 11-28-05)
Ask a question about Farmington Hills law
Corpus searches the Farmington Hills sections it holds and shows the ones that match, with their citations. Free, no sign-in.
