§ 13.02 — Impact studies
Code of Ordinances of the City of Kentwood, Michigan (Codified through Ordinance No. 6-26, adopted June 2, 2026. (Supp. No. 18)) · Kentwood Code of Ordinances § 13.02
Corpus is an independent public-information project, not the official City of Kentwood website. Stable reference: corpuslaw.us/code/c4e491da-4996-44a0-b00e-450af318f616
Section 13.02. - Impact studies.
A. The city may require a development impact assessment, or traffic impact assessment or study of the potential impact of any development encompassing a total of five acres or more for site plan review, special land use review, or rezoning. The assessments will be in conformance with the requirements of B and C, below and prepared by persons qualified by education and experience. B. Development impact assessment. 1. A development impact assessment may be required to permit the city to determine the potential impact of the proposed development on: a. Municipal services (fire, police, sewer, water, library, roads, solid waste disposal and parks), b. Natural environment (soils, wildlife, vegetation, stormwater, air and water quality and natural water courses), and c. Adjacent land uses (noise, property values and compatibility in bulk, height, design and open space). 2. The development impact assessment will contain information adequate to allow a determination as to the overall effect of the proposed development on the area affected by the proposed development and to the city as a whole. The zoning administrator shall, upon consultation with the staff review team, determine the level of detail and the elements required in the development impact assessment. The extent to which the development conforms with the city's master plan shall be considered in determining the necessity and elements of the development impact assessment as well as the level of required detail. 3. The planning commission or city commission, upon review of the submitted development impact assessment, may require additional information it deems necessary to adequately assess the overall effect of the development. C. Traffic impact assessment, traffic impact study. 1. [Level of details.]The level of detail required for either a traffic impact assessment or study is based upon the expected amount of traffic to be generated by the proposed use, based on generally accepted traffic engineering sources such as the Michigan Handbook "Evaluating Traffic Impact Studies." 2. Traffic impact assessment. A traffic impact assessment shall be required for projects expected to generate either between 50—99 directional trips during peak hour traffic or 500—750 directional trips during a typical day. The assessment shall evaluate current and future inbound and outbound traffic operations at site access points and shall support and describe proposed access design and other mitigation measures that will positively affect traffic operations at these points. 3. Traffic impact study. A traffic impact study shall be required for projects expected to generate either 100 or more directional trips in the peak hour or over 750 trips on an average day. The impact study shall evaluate current, background and future traffic operations at site access points and major signalized or nonsignalized intersections in proximity to the site. The impact study must also describe and support proposed access design and other mitigation measures that will positively affect traffic operations at the site and nearby intersections. The impact study shall evaluate pedestrian access, circulation and safety. The traffic impact study must take into account the master plan in analyzing future traffic developments.
Ask a question about Kentwood law
Corpus searches the Kentwood sections it holds and shows the ones that match, with their citations. Free, no sign-in.
