Sec. 78-125. - Private property drainage.

(a) Building openings. (1) Any building in a flooding influence area of a swale, drainageway, floodway, ditch, culvert, detention pond or any device which controls flooding shall strictly control the lowest building opening elevation so as to preclude building damage. (2) No building opening shall be constructed below the following elevations: a. One foot above the 100-year floodplain established under the National Flood Insurance Program. b. The building opening established at the time of the plat or development approval and on file in the inspection department. c. Three feet above the top of any downstream culvert. d. Four feet above the bottom of any permanent and defined drainageway. e. Five feet above the bottom of any drainageway that could be enclosed in pipe in the probable future. (3) A waiver from meeting elevations outlined in subsection (a)(2) of this section can be granted by the city engineer following receipt of a certified letter from a registered professional engineer which supports the proposed elevation as being nonhazardous. (4) The construction of any minimum building opening specified by this article or an approved grading plan must be certified, upon its completion, by a registered land surveyor. This certification, attesting that the building opening meets the specified standards, must be submitted by the permittee to the city engineer's office before the foundation inspection is performed. If the surveyor should find that the minimum building opening is below the specified elevation, that opening must be raised or protected by using a method which meets the approval of the city building official. The reconstruction must then be certified by the registered land surveyor before additional construction is undertaken. (b) Lot drainage. (1) Any drainage situation not involving any public property water is the responsibility of the property owner. (2) In plat and site plan review, the city will only review private property drainage for the purpose of ensuring that private property can be drained. (3) Lot grading and private property drainage is a civil matter among the property owners affected. (4) The city will provide technical advice to a property owner on drainage matters, but help will be limited to advice only. (5) To aid contractors and builders in grading private property, a lot grading plan will be required on all developments and such information shall be disbursed along with the building permit. The lot grading plan must show the following: a. Any established minimum building opening. b. Floodway elevations. c. All storm sewers and the size, grade, invert elevation and top of casting elevations. d. All storm sewer laterals. e. All utility and drainage easements and their full description. f. Minimum basement elevation for the sanitary sewer. g. Direction of drainage on each lot. h. Elevation of any constructed surface drainage facility. i. Surface grading of the entire parcel. (6) A minimum rear yard of 25 feet prior to any drainage encumbrance is required. This will allow an opportunity for rear yard use for sheds, play equipment, etc., without concern about water damage or inconvenience. (7) Prior to construction of any structure on a parcel or lot upon which a floodway easement exists, the permittee must obtain from the inspections department a copy of the approved plans, showing the location and design elevations of the floodway. Upon completion of the structure and prior to the issuance of an occupancy permit, the permittee must provide a certification from a registered land surveyor that the floodway grades and dimensions are as designed. If the floodway does not conform to the approved plans, the floodway must be reconstructed and certified prior to the issuance of an occupancy permit for that lot or parcel. Concurrent floodway reconstruction and issuance of an occupancy permit are permitted only if that action does not present a danger to the safety and welfare of any affected property. To permit concurrent action, the permittee shall provide the city with a performance bond, letter of credit or cash deposit to cover the cost of such reconstruction at a dollar amount established by the city.

(Code 2004, § 78-125; Comp. Ords. 1987, § 25.179)