For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1044.18 — Refilling excavations; costs

Code of Ordinances of the City of Lansing, Michigan (Codified through Ordinance No. 1343, adopted October 27, 2025 (Supp. No. 64)) · Lansing Codified Ordinances § 1044.18

Corpus is an independent public-information project, not the official City of Lansing website. Stable reference: corpuslaw.us/code/6fbba67a-2788-428d-a94c-b53d96c32075

1044.18. - Refilling excavations; costs.

After the making of connections and the laying of a sewer to within three feet of a building, the refilling of the trench or excavation shall be done under the supervision of the Department of Public Service, and such refilling shall not proceed unless an inspector from the Department or his or her assistant is present. Any person laying a sewer in any public space shall, as speedily as possible, refill the excavation and put the same in as good condition as before. In order to do so, the filling is to be replaced carefully in layers and each layer, before the next is put on, shall be thoroughly flushed so as to make such filling, when complete, sufficiently firm, compact and solid to prevent settling. However, in case of a street, alley or other paved space, such trench or excavation shall be refilled and repaved by the Director of Public Service or his or her assistant, or under his or her immediate supervision. The Department or its inspector (and the Director of Public Service in case of a paved space) shall keep or cause to be kept an accurate account of the cost of inspection, labor and material expended and used in such work, which cost shall be borne by the person having obtained the permit for the work, and such cost shall be deducted from the amount of the deposit made for such purpose.

(Ord. No. 408, 12-1-75)

Ask a question about Lansing law

Corpus searches the Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.