For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1264.06 — Approval procedure

Code of Ordinances of the City of Lansing, Michigan (Codified through Ordinance No. 1343, adopted October 27, 2025 (Supp. No. 64)) · Lansing Codified Ordinances § 1264.06

Corpus is an independent public-information project, not the official City of Lansing website. Stable reference: corpuslaw.us/code/387614eb-50b9-4f27-9b87-b92a296de54e

1264.06. - Approval procedure.

(a) Overview of PUD review and approval process. The PUD review and approval process includes the following steps: (1) Preapplication conference with Planning Office on the PUD concept plan. (2) Planning Office review of PUD concept plan. (3) Planning Commission public hearing and recommendation on PUD concept plan. (4) City Council review and approval of PUD overlay zone, PUD concept plan and PUD agreement. (b) Preapplication conference with Planning Office. (1) Applicant request. An optional pre-application conference with the Planning Commission Office may be requested by the applicant to discuss the appropriateness of a PUD and the concept plan to solicit feedback and to receive requests for additional materials supporting the proposal. (c) Planning Office review of PUD concept plan. (1) PUD concept plan. A concept plan for the PUD that contains all of the following information, along with fees established by City Council, shall be submitted for Planning Office review: a. A conceptual plan for the development, drawn to an engineer's scale of not less than one inch equals 50 feet for property less than three acres, or one inch equals 100 feet for property three acres or more in size, that includes all of the following: 1. Title block with sheet number/title; name, address and telephone number of the applicant and firm or individual who prepared the plans; and date(s) of submission and any revisions; 2. Scale and north-point; 3. Location map drawn to a separate scale; 4. Legal description of property; 5. Zoning classification of site and all abutting parcels; 6. Net acreage (minus rights-of-way) and total acreage; 7. Existing lot lines, building lines, structures, parking areas and other improvements on the site and within 100 feet of the site; 8. Proposed lot lines, lot dimensions, property lines, setback dimensions and other improvements; 9. Location and height of all proposed buildings or structures; 10. Location of existing and proposed roads, driveways, parking lots, sidewalks and pathways on or within 250 feet of site; 11. Proposed off-street parking lots and number of spaces; 12. Conceptual landscape plan; 13. The general location of existing plant material; 14. Location of existing drainage courses, floodplains, rivers and EGLE regulated wetlands; 15. Location of existing and proposed sanitary sewers; 16. Location of existing and proposed water mains; 17. Stormwater retention and detention pond locations and existing, or proposed storm sewers; 18. Number and location of residential units; 19. Density calculations by type of residential unit; and 20. Location and size of recreation and open space areas. b. Documentation indicating how the criteria for qualification for a PUD have been met. c. A table which details all deviations from the established zoning district uses; area, height and setback requirements; off-street parking regulations; general provisions; or subdivision regulations which would otherwise be applicable to the uses and development proposed in the absence of this PUD article; this table shall clearly identify the allowed regulation in comparison to the requested deviation. d. The manner of the ownership and dedication, and any mechanism to protect and maintain any areas designated as common areas or open space. e. Any additional information requested by the Planning Commission to better assist in the determination of PUD qualification such as, but not limited to: market studies, fiscal impact analysis, traffic impact studies, and environmental impact assessments. (d) Planning Commission public hearing. A public hearing for the Planning Commission to review the requested PUD concept plan shall be scheduled in accordance with the Michigan Zoning Enabling Act (P.A. 110 of 2006, as amended). (e) Planning Commission review, decision, and recommendation. (1) PUD concept plan. The Planning Commission shall review the PUD concept plan in consideration of public hearing comments, technical reviews from City staff, correspondence from applicable review agencies and compliance with the standards of this article and other applicable standards and requirements of this chapter. The Planning Commission shall recommend approval, approval with conditions or denial of the PUD request to the City Council. The recommendation shall be based on the following: a. Whether the proposal provides the recognizable benefits intended in this chapter; b. Promotes the land use goals and objectives of the City or the Comprehensive Plan; c. Whether all applicable provisions of this article and this chapter are met; d. Whether there is, or will be at the time of development, adequate facilities to accommodate the sanitary sewage, stormwater, solid waste, water supply needs and traffic generated by the proposed project; and e. Whether the project successfully provides a transition between higher and lower density uses and/or between nonresidential and residential. (f) Draft PUD agreement. The applicant shall submit a draft PUD agreement for review and approval by the City Council after review by the City Attorney. The agreement shall provide: (1) A survey of the acreage comprising the proposed development. (2) The manner of ownership of the developed land. (3) The manner of the ownership and of dedication or mechanism to protect any areas designated as common areas or open space. (4) Provision assuring that open space areas shown on the plan for use by the public or residents of the development will be or have been irrevocably committed for that purpose; the City may require conveyances or other documents to be placed in escrow to accomplish this. (5) Satisfactory provisions have been made to provide for the future financing of any improvements shown on the plan for site improvements, open space areas and common areas which are to be included within the development and that maintenance of such improvements is assured by a means satisfactory to the City Council. (6) The cost of installing, improving and maintaining streets and the necessary utilities has been assured by a means satisfactory to the City Council. (7) Provisions to ensure adequate protection of natural features. (8) The PUD site plan shall be incorporated by reference and attached as an exhibit. (g) City Council review of PUD overlay zoning, PUD concept plan and PUD agreement. (1) Following receipt of a recommendation from the Planning Commission on the PUD overlay zoning and PUD concept plan and draft PUD agreement; the City Council shall conduct a public hearing to review the concept plan and PUD agreement. (2) Notice regarding this public hearing shall be given in accordance with Section 3-303 of the Lansing City Charter. (3) After the public hearing, City Council shall either approve, deny, or approve with a list of conditions made part of the approval. (h) Conditions. In accordance with the Michigan Zoning Enabling Act (P.A. 110 of 2006, as amended), reasonable conditions may be required with the approval of a PUD for the purpose of ensuring that public services and facilities affected by a proposed land use or activity will be capable of accommodating increased service and facility loads caused by the land use or activity, protecting the natural environment and conserving natural resources, ensuring compatibility with adjacent uses of land, promoting the use of land in a socially and economically desirable manner, and further the implementation of the City of Lansing Comprehensive Plan. Conditions attached shall be included in the PUD agreement. (i) Time limits for PUD concept plan approval. Approval of the PUD concept plan by the City Council shall confer upon the owner the right to proceed through the subsequent planning phase for a period not to exceed two years from date of approval. If application for final site plan approval for the PUD or a phase of the PUD is not requested within this time period, the PUD concept plan approval shall automatically become null and void and all rights thereunder shall terminate. The Planning Commission may for good cause extend the period up to an additional two years, if requested in writing by the applicant prior to the expiration date. Upon expiration of a PUD concept plan, the City Council may direct the Planning Commission to conduct a public hearing and make a recommendation to remove the PUD overlay district. (j) Final approval of site plan. (1) Following City Council approval of the PUD concept plan, a final site plan for the PUD or individual phases of the PUD shall be submitted in accordance with Chapter 1260 - Site Plan Review Procedures. (2) All site plans subsequently submitted shall conform with the PUD concept plan, all conditions attached to preliminary approval, the PUD agreement and the requirements of this ordinance. Where the Planning Office determines that changes to the final site plan significantly deviate from the PUD concept plan, the Planning Commission Office shall refer the PUD to the Planning Commission to conduct another public hearing, review the plan as an amended resubmission of the PUD concept plan under the requirements of this article, and make a recommendation on the proposed changes to the City Council for approval, denial, or approval with conditions.

(Ord. No. 1331, § 1, 5-5-25)

Ask a question about Lansing law

Corpus searches the Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.