1270.03. - Nonconforming buildings or structures.

(a) Continuation of nonconforming buildings or structures. Where a lawful building or structure exists prior to the effective date of this chapter, or an amendment hereto, that does not comply with the requirements of this chapter because of restrictions such as parking, lot area, coverage, width, height, or yards, that building or structure may be continued so long as it remains otherwise lawful, subject to the following provisions: (1) No such structure may be enlarged or altered in a way which increases its nonconformity. (2) Should such structure be destroyed by any means to an extent of more than 50 percent of its replacement cost at time of destruction, it shall not be reconstructed except as may be permitted by the Board of Zoning Appeals upon a finding that the repair and reconstruction shall: a. Not have a substantial detrimental effect on the use and enjoyment of adjacent uses or lots. b. Comply with any reasonable conditions imposed by the Board of Zoning Appeals that are necessary to ensure that the repair and reconstruction shall not prove detrimental to adjacent properties, the neighborhood, or the community. c. The owner shall provide the necessary information to make a determination as to whether or not repairs to the structure will exceed 50 percent of the replacement cost, exclusive of the foundation. (3) Should a nonconforming building or structure be destroyed to an amount equal to or less than 50 percent of its estimated replacement cost, exclusive of the foundation, it may be reconstructed in its previously nonconforming location. (4) An owner shall commence repair and reconstruction work within 12 calendar months of the Board of Zoning Appeals approval of the application. Upon request, the Zoning Administrator may approve an administrative extension of up to an additional six calendar months where a property owner can demonstrate a good faith effort to start work or demonstrate third-party delays beyond their control. Extensions beyond the six months must be approved by the Board of Zoning Appeals.

(Ord. No. 1331, § 1, 5-5-25)