§ 138-10.400 — Wind Energy
Code of Ordinances of the City of Rochester Hills, Michigan (Codified through Ordinance No. 203, enacted August 24, 2026 (Supp. No. 54)) · Rochester Hills Land Development Regulations § 138-10.400
Corpus is an independent public-information project, not the official City of Rochester Hills website. Stable reference: corpuslaw.us/code/30f0192e-fbe0-4f1e-9dcf-1e9aadc84511
SECTION 138-10.400 - Wind Energy
A. Purpose. It is the purpose of this Section to promote the safe, effective, and efficient use of wind energy systems to reduce or replace on-site consumption of utility supplied electricity. It is the purpose of this Section to standardize and streamline the review and permitting process for small wind energy systems. B. Findings. The City has found that wind energy is an abundant, renewable, and nonpolluting energy resource and that its conversion to electricity will reduce our dependence on non-renewable energy resources and decrease air and water pollution that results from the use of conventional fossil-fuel inputs. Wind energy systems will also enhance the reliability and power quality of the power grid, reduce peak power demands, and help diversify the City's energy supply portfolio. C. Definitions. The terms used in this section have the following meanings: [image omitted; see the official code] Figure 6. Horizontal and Vertical Axis Systems Height. The vertical distance from grade level adjacent to the base of the structure to the center of the hub for a horizontal axis wind turbine or the highest point of a vertical-axis wind turbine. Roof-Mounted Energy System. A type of small wind energy conversion system that is mounted on a roof with a height not greater than 15 feet above the ridgeline of a pitched roof or parapet of a flat roof. Small Wind Energy System. A wind energy conversion system consisting of a wind turbine, tower or axis, blades or blade system, and associated control or conversion electronics primarily intended to reduce on-site consumption of utility power. Tower Mounted Wind Energy System. A wind energy conversion system that is mounted on a freestanding or guyed tower attached to the ground, and not attached to any other permanent or temporary structure. Utility Wind Energy System. A wind energy conversion system consisting of a wind turbine, tower or axis, blades or blade system, and associated control or conversion electronics primarily intended to provide wholesale or retail energy to the electric utility grid. Wind Energy System. Any wind energy conversion device including all associated control or conversion electronics. D. Where Permitted. 1. Small Wind Energy Systems are permitted by right in any zoning district, provided that the requirements of this Section are met. 2. Utility Wind Energy Systems may be permitted in any zoning district as a conditional use by the City Council, provided that the requirements of this Section are met. E. Review Procedures and Standards. 1. Small Wind Energy Systems. a. Submittal Requirements. Applications for small wind energy systems shall be reviewed administratively by the Planning and Development Department. The applicant shall submit a plan complying with the requirements of Section 138-2.208 for a sketch plan. b. Height Modification. If the applicant requests a height modification, the application shall be reviewed by the Planning Commission following a public hearing held in accordance with the requirements of Section 138-1.203. 2. Utility Wind Energy Systems. The review process for any utility wind energy system shall follow the conditional use review process set forth in Article 2, Chapter 3. F. General Standards. The following requirements are applicable to all wind energy systems. 1. Noise. A wind energy system shall not generate a noise level of 55 dB(A), measured at the property line, for more than three minutes in any hour of the day. EXCEPTION: if the constant ambient sound pressure level exceeds 55 dB(A), measured at the base of the wind energy system, a decibel level of the ambient dB(A) plus five dB(A) shall not be exceeded for more than three minutes in any hour of the day. 2. Shadow Flicker. Shadow flicker is a term used to describe what happens when rotating wind turbine blades pass between the viewer and the sun, causing an intermittent shadow. The application for a wind energy system shall include a shadow flicker analysis demonstrating locations where shadow flicker will occur at sunrise and sunset, along with measures the applicant will take to eliminate or mitigate the effects of shadow flicker on adjacent or nearby affected properties. 3. Lighting. No wind energy system shall be artificially lighted unless required by the Federal Aviation Administration. 4. Appearance, Color, and Finish. The wind energy system shall be maintained in the color or finish that was originally applied by the manufacturer, unless otherwise approved in the building permit. All wind energy systems shall be finished in a non-reflective matte finished color. 5. Signs. All signs other than the manufacturer or installer's identification, appropriate warning signs, or owner identification signs are prohibited. 6. Electrical Wires. All electrical wires associated with a wind energy system other than wire necessary to connect the wind generator to the tower wiring, the tower wiring to the disconnect junction box, and grounding wires shall be located underground. 7. Compliance With Electrical Code. Building permit applications for wind energy systems shall be accompanied by line drawings of the electrical components in sufficient detail to allow for a determination that the manner of installation conforms to the National Electrical Code. 8. System Access. The tower shall be designed and installed such that step bolts, ladders, or other means of access readily accessible to the public are located at least eight feet above grade level. 9. Wind Access. The City makes no assurance of wind access other than the provisions of this Section. The applicant may provide evidence of covenants, easement or similar documentation for abutting property owners providing access to wind for the operation of a wind energy system. G. Tower-Mounted Small Wind Energy Systems. The following standards are applicable to tower-mounted small wind energy systems: RESIDENTIALLY ZONED PARCELS | NONRESIDENTIALLY ZONED AND USED PARCELS Minimum Parcel Area 0.5 acres | No minimum parcel area. Maximum Height The maximum height is: - 35 feet plus the area of the parcel in acres multiplied by 17.5, or - 150 feet, whichever is lower. | The maximum height is: - One foot of height for each 2.5 feet of setback from the base of the tower to the nearest residential dwelling unit, or - 150 feet, whichever is lower. Setback Requirements - The minimum setback from any property line shall be the height of the wind turbine plus five feet. - The minimum setback from any road or overhead utility right-of-way or easement shall be equal to the height of the turbine unless written permission is granted by the governmental agency or other entity with jurisdiction over the right-of-way or easement. - Tower-mounted wind energy systems may not be located in the front yard of any lot unless the principal building is set back 200 feet or more. In such a case, a tower-mounted system may be located in the front yard provided that a minimum 150-foot front yard setback between the tower and the front property line is maintained. | - The minimum setback from any property line shall be the height of the wind turbine plus 5 feet. - The minimum setback from any road or overhead utility right-of-way or easement shall be equal to the height of the turbine unless written permission is granted by the governmental agency or other entity with jurisdiction over the right-of-way or easement. - Tower-mounted wind energy systems may not be located in the front yard of any lot unless the principal building is set back 200 feet or more. In such a case, a tower-mounted system may be located in the front yard provided that a minimum 150-foot front yard setback between the tower and the front property line is maintained. H. Roof-Mounted Small Wind Energy Systems. The following standards are applicable to roof-mounted small wind energy systems: RESIDENTIALLY ZONED PARCELS | NONRESIDENTIALLY ZONED AND USED PARCELS Minimum Parcel Area No minimum parcel area. | No minimum parcel area. Maximum Height The maximum height is 15 feet above the highest point of the roof. | The maximum height is: - 20 feet above the top of roof elevation of the building for any building located within 250 feet of a residential dwelling, or - 150 percent of the building height, whichever is lower. Setback Requirements Roof-mounted wind energy systems shall be set back a minimum of 20 feet from the property line, or the height of the system above the top of roof elevation multiplied by 1.25, whichever is greater. | Roof-mounted wind energy systems shall be set back a minimum of 20 feet from the property line, or the height of the system above the top of roof elevation multiplied by 1.25, whichever is greater. I. Utility Wind Energy Systems. The following standards are applicable to large wind energy systems: 1. Minimum Site Area. Utility wind energy systems may only be developed on a zoning lot with an area of 20 acres or greater. 2. Setbacks. Any utility wind energy system shall be set back a distance equal to the height of the tower plus five feet from any property line, road right-of-way, or overhead utility line. 3. Towers. Utility wind energy systems shall use tubular monopole towers, and shall not contain lettering, company insignia, advertising, or graphics on the tower or turbine that are visible beyond the property boundaries. 4. Environmental Impact. The applicant shall submit an environmental impact analysis prepared by a qualified third party assessing any potential impacts on the natural environment including, but not limited to, wetlands and other fragile ecosystems, historical and cultural sites, wildlife, and antiquities. The applicant shall take appropriate measures, if possible, to minimize, eliminate or mitigate adverse impacts identified in the analysis. If the adverse impacts cannot be sufficiently mitigated or eliminated, City Council shall deny the request for a conditional use permit for the utility wind energy system. 5. Community Impact. The applicant shall be responsible for repairing any public roads or other public infrastructure damaged or otherwise worn beyond typical usage by the construction of the utility wind energy system. 6. Decommissioning. The applicant shall submit a decommissioning plan, including the following items of information: a. The anticipated life of the project. b. The estimated decommissioning costs and net salvage value in present dollars. c. The method of ensuring funds will be available for decommissioning and removal of towers, and restoration of the site to a pre-construction condition. d. Anticipated manner in which the project will be decommissioned and the site restored. 7. Complaint Resolution. The applicant shall develop a process to resolve any potential complaints from nearby residents concerning the construction and operation of the project. The process may use an independent mediator or arbitrator and shall include a time limit for acting upon a complaint. The process shall not preclude any governmental body from acting on a complaint. The applicant shall maintain and make available to nearby residents a telephone number where a project representative can be reached during normal business hours.
Ask a question about Rochester Hills law
Corpus searches the Rochester Hills sections it holds and shows the ones that match, with their citations. Free, no sign-in.
