§ 138-9.203 — Review Criteria
Code of Ordinances of the City of Rochester Hills, Michigan (Codified through Ordinance No. 203, enacted August 24, 2026 (Supp. No. 54)) · Rochester Hills Land Development Regulations § 138-9.203
Corpus is an independent public-information project, not the official City of Rochester Hills website. Stable reference: corpuslaw.us/code/faaff403-fcbc-422c-af6e-ed3793c62eea
SECTION 138-9.203 - Review Criteria
In reviewing any request for a steep slope permit, the reviewing authority shall consider all relevant facts and circumstances. Any steep slope permit application must satisfy the following review criteria: A. General Criteria. 1. Structures shall be designed in a manner that averts or minimizes alteration to the steep slope and that otherwise complies with the grading standards in 138-9.203.B. 2. Feasible alternatives to the proposed action, including avoidance of disturbance of the steep slope area and the availability of reasonable alternative building locations on the subject site or on any other adjacent parcels under the control of the applicant. 3. The suitability of the proposed activity to the area for which it is proposed. Structures should be sited on existing level areas of the site. 4. The suitability of soils and/or other structural characteristics of the slope that make the slope suitable for development, or unsuitable for development due to the slope's susceptibility to erosion, creep, or failure. 5. The proposed mitigation measures will adequately protect steep slopes from erosion, sedimentation, or damage beyond a natural rate of change. 6. The availability of technical improvements, safeguards, or other mitigation measures that could feasibly be added to the proposal. 7. Proposed method(s) of restoring disturbed areas of a steep slope. B. Specific Criteria. 1. The alignment of roads and driveways shall follow the natural topography to minimize regrading and comply with design standards for maximum grades set forth in the City's engineering standards. 2. The natural elevations and vegetative cover of steep slopes shall be protected from disturbance to the maximum extent possible. 3. All regrading shall blend in with the natural contours of the land. 4. Cuts and fills shall be rounded off to eliminate sharp angles at the top, bottom and side of regraded slopes. 5. The angle of cut and fill slopes shall not exceed the natural angle of repose of the soil in the cut or fill, except where retaining walls or other structural stabilization is used; generally, for soils, cut and fill slopes should be not steeper than one vertical to three horizontal (33 percent slope). 6. Any disturbance of steep slopes shall be completed within one construction season, and disturbed areas shall not be left bare and exposed during the winter and spring thaw periods. 7. The disturbance of existing vegetative ground cover shall not take place more than seven days prior to commencing grading and construction. 8. Permanent deep-root vegetative cover shall be planted within three days after completion of grading. The vegetative cover proposed to be used shall be identified as part of the application and is subject to review and approval by the reviewing authority and City Engineer. Where final grading and permanent planting cannot be established within a short period of time, temporary seeding or mulching shall be applied. Upon good cause being shown by the applicant and based upon consideration of the time of year, slopes, soils and environmental sensitivity of the area involved, the Building Department may modify these specified time periods after consultation with the reviewing authority and City Engineer. 9. Measures for the control of erosion and sedimentation shall be undertaken in accordance with the Soil and Sedimentation Control Act (See Soil Erosion Act, Part 91 of PA 451 of 1994, as amended), which is administered by the Oakland County Drain Commissioner's Office. Topsoil that will be stripped from all areas of disturbance shall be stockpiled in a manner so as to minimize erosion and sedimentation and shall be replaced on the site at the time of final grading. 10. Fill material shall be composed only of nonorganic material that will allow for appropriate compaction and cover by topsoil. No voids are to be created or left remaining in the fill material that will allow further settlement of the fill or habitat for rodents, vermin or other undesirable species. 11. Compaction of fill materials in fill areas shall be such that it ensures support of proposed structures and stabilization for intended uses. 12. Permanent physical markers will be used to identify and delineate the steep slope setback area.
Ask a question about Rochester Hills law
Corpus searches the Rochester Hills sections it holds and shows the ones that match, with their citations. Free, no sign-in.
