11-201. CASH DEPOSITS; APPROVAL FOR PLUGGING SEWER CONNECTIONS; FILLING EXCAVATIONS AND REMOVAL OF DEBRIS.
(A) The moving contractor shall make a cash deposit or provide a letter of credit in an amount set by the City Engineer to guarantee the payment of any and all damages to public property caused by the moving operations, including any damage to street surfaces, sidewalks, street lights, public buildings, or any and all other damage to public property, and also to guarantee payment of all inspection fees and expenses incurred by the city as a result of the moving operations. The moving contractor shall secure the approval of the Director of Public Works of the plugging of sewer connections before covering the work. He or she shall fill all excavations which result from the moving of the building and shall remove all materials and debris from the premises from which the building is to be moved if the premises are located within the city, and all materials and debris which may be deposited or disrupted elsewhere during the moving process. The burning of such materials and debris is prohibited. (B) The city shall retain the moving contractor's cash deposit for approximately 30 days after the moving operations are completed, during which time it shall be the duty of the City Engineer to estimate the amount of damage, if any, to public and private property resulting from the moving operations and to ascertain whether all materials and debris have been removed from the premises from which the building was moved and all other areas where materials and debris may have been deposited elsewhere during the moving process. The City Engineer shall make a written report in regard thereto and place the same on file. The amount of the contractor's deposit, less the amount of damage, if any, to public and private property and less the expense, if any, of removing material and debris from public or private properties, shall be returned to him or her as soon as practicable. In case the amount of such damage and/or cleaning up and removal expense shall be more than the amount of the deposit, the contractor shall pay the city the difference within ten days after receiving a statement thereof from the City Engineer. (C) The owner or moving contractor, on the owner's behalf, shall also file a cash deposit in an amount set by the City Engineer to guarantee that the building will be completed according to the plans and specifications on file with the city and will be in full compliance with his or her agreement with the city and the requirements of the City Building Code and fit for occupancy within six months from the date when the moving permit is granted. The owner shall be entitled to the return of the cash deposit upon completion of the building within six months and approval and issuance of a certificate of occupancy by the city. (1978 Code, § 8-201; Ord. No. 396 § 6, 5-6-08) Cross references: Excavations, see Ch. 17; Refuse, see Ch. 23; Sewers, see Ch. 53
Ask a question about Sterling Heights law
Corpus searches the Sterling Heights sections it holds and shows the ones that match, with their citations. Free, no sign-in.