17-51. EXCAVATIONS.
(A) Setbacks. No cut or excavation shall be closer than 100 feet from the nearest street, highway or alley right-of-way line, nor from the nearest perimeter property line; provided, however, that the Office of Engineering may prescribe more strict requirements in order to give sublateral support to surrounding property where swell or geographic conditions warrant it. (B) Standing water. No soil, sand, clay, gravel, or other similar material shall be removed in such a manner as to cause water to stand or accumulate or to result in a place of danger or menace to the public health or safety. The premises shall at all times be graded so that surface water drainage is not interfered with. Where removal or grading operations result in a body of water forming, the owner or operator of the quarry shall erect "Keep Out - Danger" signs on the required fence around the excavation not more than 200 feet apart. (C) Fencing. Where an excavation, subject to this article, is in excess of five feet in depth, the permit holder shall erect a fence around the perimeter of the site of at least six feet in height of wire to prevent unauthorized access to the site. Any gates required shall be kept locked when operations are not carried on. (D) Topsoil replacement. Whenever topsoil exists suitable for growing vegetation at the time the operations begin, a sufficient quantity of the existing topsoil shall be stockpiled on said site so that the entire site, when excavation operations are completed, may be recovered with a minimum of four inches of topsoil. The replacement of such topsoil shall be made immediately following the termination of the excavation operation. In the event, however, that such operations continue over a period of time greater than 30 days, the operator shall replace the stored topsoil over the stripped area as he or she progresses. The replacement of the topsoil shall be in a manner suitable for growing vegetation. (E) Slopes. The slopes of the banks of the excavation shall in no event exceed a minimum ratio of three feet horizontal to one foot vertical, and where ponded water results from the operation, the slope must be maintained and extended into the water to a depth of five feet. Suitable vegetation shall be planted on all finished slopes to deter erosion. (Ord. No. 384 § 1, 8-15-06)
Ask a question about Sterling Heights law
Corpus searches the Sterling Heights sections it holds and shows the ones that match, with their citations. Free, no sign-in.