For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 53-82 — MONITORING FACILITIES

Code of Ordinances of the City of Sterling Heights, Michigan (2026 S-46: Local legislation current through Ord. 509, passed 5-19-26) · Sterling Heights City Code § 53-82

Corpus is an independent public-information project, not the official City of Sterling Heights website. Stable reference: corpuslaw.us/code/3fcde43c-0d86-4aba-878d-fafae81a5a09

53-82. MONITORING FACILITIES.

(A) Significant industrial users shall provide, operate and maintain at their own expense a sampling manhole or special structure to facilitate monitoring, inspection, sampling and flow measurement of their discharge by the control authority and the industrial user and to enable the control authority to conduct such other monitoring and sampling as required for determining compliance with discharge requirements, limits and standards as provided for in this article. In the event the control authority determines that the monitoring facility identified in the permit application is inadequate, a new monitoring facility must be identified or provided which shall allow for collection of a representative sample of the wastewater discharged from the facility. Unless otherwise determined at the discretion of the control authority, the facility shall be provided within 90 days of receipt of notification by the control authority. The industrial user shall provide the control authority with 1) a drawing showing all sewer connections and sampling manholes by the size, location, elevation and points or places of discharges into the POTW; 2) a flow schematic showing (i) which connections receive each national categorical process wastestream, (ii) which connections receive storm water, sanitary water or cooling water, and (iii) which lines handle each combines wastestream. This report shall be certified by a professional engineer. If a significant industrial user fails to install the monitoring facilities within the prescribed time limits, then the control authority may install such structure or device and the significant user shall reimburse the control authority for any costs incurred therein. (B) The sampling manhole should be situated on the industrial user’s premises in a location readily accessible to the control authority. It shall be the responsibility of the industrial user to obtain any necessary approvals from the community or other government entities which may be required by the location and construction of monitoring facilities in the public street or sidewalk area. Such construction shall only occur when another location would be impractical or cause undue hardship upon the industrial users. In no case shall the location be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling or monitoring manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility and any permanently installed sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the industrial users. Whether constructed upon public or private property, the sampling and monitoring facilities shall be provided in accordance with the control authority’s requirements and all applicable local construction standards and specifications. (See § 53-83). (1978 Code, § 35-82; Ord. No. 284, § 8, 5-15-90; Ord. No. 284-A, § 1, 5-18-99)

Ask a question about Sterling Heights law

Corpus searches the Sterling Heights sections it holds and shows the ones that match, with their citations. Free, no sign-in.