Section 4E.03 - Permit required.
It shall be unlawful for any person to construct or erect an electric vehicle charging station upon any property within the city without first having obtained a permit from the Building Division or other designated city division/department. The permit application shall be accompanied by a plot plan prepared by a licensed professional architect, engineer, landscape architect, professional community planner or land surveyor showing the type, size and proposed location of the electric vehicle charging station and payment of the permit fee established by resolution adopted by City Council. The fee shall be based on the existing fee schedule adopted by City Council. The requirement for submission of an official plot plan is not required for properties zoned R-1-A, R-1-B, R-1-C and R-2 when the electric vehicle charging station is located inside a structure. If the electric vehicle charging station is located outside of the structure for properties zoned R-1-A, R-1-B, R-1-C and R-2, a plot plan drawn to scale by the owner, occupant or interested party is required.
(ord. No. 30-1019, § 1, 3-22-16)
Ask a question about Warren law
Corpus searches the Warren sections it holds and shows the ones that match, with their citations. Free, no sign-in.