For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.160 — PERMITS REQUIRED

Bloomington, Minnesota City Code · Bloomington City Code § 15.160

Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/499a5c18-2a42-4a0f-9c8d-e206e6a0df48

§ 15.160 PERMITS REQUIRED.

(a) No person shall construct or reconstruct RECONSTRUCT or RECONSTRUCTION. Repairs of an existing well that involve either the modification, removal or insertion of a well casing or screen, or the modification of the diameter or depth of the well below the upper termination of the well casing. a dewatering well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. , environmental well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. , or water supply well WATER SUPPLY WELL. Means a well that is not a dewatering well or an environmental well and includes wells used: (a) For potable water supply (except for community water supply wells and noncommunity public water supply wells serving facilities which are licensed by the state); (b) For irrigation; (c) For agricultural, commercial or industrial water supply; (d) For heating or cooling; and (e) For testing water yield for irrigation, commercial or industrial uses, or residential supply. without a permit and inspection at a time designated by the city. (b) No person shall seal a dewatering well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. , environmental well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. or water supply well WATER SUPPLY WELL. Means a well that is not a dewatering well or an environmental well and includes wells used: (a) For potable water supply (except for community water supply wells and noncommunity public water supply wells serving facilities which are licensed by the state); (b) For irrigation; (c) For agricultural, commercial or industrial water supply; (d) For heating or cooling; and (e) For testing water yield for irrigation, commercial or industrial uses, or residential supply. without a permit and inspection at a time designated by the city. (c) Annual maintenance permits shall be obtained and renewed: (1) By the owner of property containing any unsealed water supply well WATER SUPPLY WELL. Means a well that is not a dewatering well or an environmental well and includes wells used: (a) For potable water supply (except for community water supply wells and noncommunity public water supply wells serving facilities which are licensed by the state); (b) For irrigation; (c) For agricultural, commercial or industrial water supply; (d) For heating or cooling; and (e) For testing water yield for irrigation, commercial or industrial uses, or residential supply. not in use; and (2) By the owner of property containing an environmental well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. or dewatering well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. remaining unsealed 14 months after completion of its construction. (d) The fees for permits obtained under this section shall be as set forth in City Code Appendix A. (e) When “emergency conditions EMERGENCY CONDITIONS. Exceptional circumstances where a delay in starting the construction, reconstruction or sealing of a well poses an immediate and significant danger to health or safety and there is no time for prior notification or to obtain the required permit. Exceptional circumstances include, but are not limited to, cases where well failure should leave livestock or persons without drinking water, where inaction presents an imminent threat of contamination of the well or groundwater, where delay would result in the endangerment of health or safety (such as in an unstable excavation) or where such work is court ordered. ” exist, a dewatering well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. , environmental well WELL, DEWATERING WELL, ENVIRONMENTAL WELL and TEMPORARY BORING. Shall have the meanings given in M.S. Chapter 103I, as it may be amended from time to time. or water supply well WATER SUPPLY WELL. Means a well that is not a dewatering well or an environmental well and includes wells used: (a) For potable water supply (except for community water supply wells and noncommunity public water supply wells serving facilities which are licensed by the state); (b) For irrigation; (c) For agricultural, commercial or industrial water supply; (d) For heating or cooling; and (e) For testing water yield for irrigation, commercial or industrial uses, or residential supply. may be constructed, reconstructed or sealed, prior to obtaining a permit, in compliance with the following procedures. (1) If the emergency conditions EMERGENCY CONDITIONS. Exceptional circumstances where a delay in starting the construction, reconstruction or sealing of a well poses an immediate and significant danger to health or safety and there is no time for prior notification or to obtain the required permit. Exceptional circumstances include, but are not limited to, cases where well failure should leave livestock or persons without drinking water, where inaction presents an imminent threat of contamination of the well or groundwater, where delay would result in the endangerment of health or safety (such as in an unstable excavation) or where such work is court ordered. arise during normal business hours, the work may proceed after the City Environmental Health Division is verbally notified and provided with the information required for the applicable permit and authorization from that Division to proceed is received. (2) If the emergency conditions EMERGENCY CONDITIONS. Exceptional circumstances where a delay in starting the construction, reconstruction or sealing of a well poses an immediate and significant danger to health or safety and there is no time for prior notification or to obtain the required permit. Exceptional circumstances include, but are not limited to, cases where well failure should leave livestock or persons without drinking water, where inaction presents an imminent threat of contamination of the well or groundwater, where delay would result in the endangerment of health or safety (such as in an unstable excavation) or where such work is court ordered. arise after business hours or on a non-business day, the work may proceed with verbal notification provided to the City Environmental Health Division on the next business day. (3) A written application for the work performed pursuant to these emergency provisions must be received by the city, together with applicable permit fees, within five days of the commencement of the work. The person who performed the work shall be responsible for submitting the permit application. (4) All work performed pursuant to these emergency provisions must comply with the standards and requirements of state law and regulations and city ordinances. (1958 Code, § 58.02) (Added by Ord. 194, passed 11-10-1952; Ord. 196, passed 11-25-1952; Ord. 201, passed 2-3-1953; Ord. 37, passed 3-23-1954; Ord. 74, passed 11-21-1955; Ord. 76, passed 3-5-1956; Ord. 124, passed 8-19-1957; repealed and new Division added by Ord. 135, passed 4- -1958; Ord. 71-23, passed 4-12-1971; Ord. 89-12, passed 2-27-1989; amended by Ord. 93-29, passed 6-7-1993; Ord. 2014-14, passed 10-13-2014; Ord. 2017-26, passed 7-24-2017; Ord. 2019-29, passed 7-15-2019; Ord. 2021-39, passed 11-29-2021; Ord. 2023-42, passed 12-18-2023)

Ask a question about Bloomington law

Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.