For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.11.2 — LOT LINE ADJUSTMENTS AND LOT CONSOLIDATIONS

Bloomington, Minnesota City Code · Bloomington City Code § 22.11.2

Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/b3d99dd9-7889-481c-b40c-77254fff0637

§ 22.11.2 LOT LINE ADJUSTMENTS AND LOT CONSOLIDATIONS.

(a) Purpose. The purpose of the lot line adjustment LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. and lot consolidation LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. application process is: (1) To set forth appropriate standards for adjusting lot lines and consolidating lots; and (2) To provide a review process for approval of lot line adjustments LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. and lot consolidations LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. prior to city staff approval of the County authorization form. (b) Review and approval. Lot line adjustments LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. and lot consolidations LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. must be reviewed and approved by the Planning Manager, City Engineer, and City Assessor prior to finalization. (c) Content. Lot line adjustments LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. must include the following items: (1) An application form signed by the property owner(s) or authorized representative; (2) The required application fee as set forth in City Code Appendix A; (3) Written documentation from the property owner explaining the proposed lot line adjustment LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. . (4) A certificate of survey at not less than 1:100 scale showing: (A) Parcels to be included in the lot line adjustment LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. or lot consolidation LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. ; (B) Existing and proposed property lines, right-of-way and easements; (C) Physical features of the property: buildings, retaining walls, driveways, impervious surfaces and the like; (D) Existing and proposed utilities; and (E) Site data: total area, parcel dimensions and area, total impervious surface area, minimum required setback lines, zoning, and existing and proposed legal descriptions. (5) A completed copy of the county form required for lot line adjustments LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. or lot consolidations LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. . (d) Standards. (1) A lot line adjustment LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. or lot consolidation LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. must not be approved unless the lots to be modified are platted lots and meet all applicable requirements of the city code for individual parcels after modification (including but not limited to lot size, lot width, building setbacks, impervious surface coverage, street adjacency and the like). (2) The newly created lot boundaries must not cross zoning district boundaries. (3) The lots within a lot line adjustment LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. or lot consolidation LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. must be contiguous, sharing a common boundary. (4) All created lots must not cross taxing jurisdiction boundaries (city, school district, watershed district and the like). (5) All parties with a property interest, including mortgagors, must consent to the lot line adjustment LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. or lot consolidation LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. . (6) The lot line adjustment LOT LINE ADJUSTMENT. The adjustment of a lot line by the relocation of one or more common boundaries between lots. or lot consolidation LOT CONSOLIDATION. The combination of two or more lots into a lower number of lots. must not require or create the need for any public improvements. (Ord. 2024-61, passed 12-16-2024)

Ask a question about Bloomington law

Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.