For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.20 — General provisions

City Code of the City of Eagan, Minnesota (Codified through Ordinance No. 644, 2nd series, enacted April 7, 2026. (Supp. No. 43)) · Eagan City Code § 13.20

Corpus is an independent public-information project, not the official City of Eagan website. Stable reference: corpuslaw.us/code/823d9d2c-ed9f-4d06-b7ee-5fcce5e9b6dc

Sec. 13.20. - General provisions.

Subd. 1. Model homes. Model homes or dwelling units, in a number authorized by the council, may be permitted in any residential subdivision subject to the following conditions: A. The model home area shall be designated on the preliminary plat, reviewed by the planning commission, and approved by the council. Said approval shall include an approved site plan detailing the area so designated and temporary improvements such as public parking areas, nonresidential structures and/or similar improvements normally associated with a model home area. B. The model home area shall exist for a time period specified in the development contract or until the project is sold out or rented out, whichever shall be sooner. At the end of said time period, the subdivider shall be required to restore the area to a normal residential character, unless a time extension is granted by the council, so that the model home may serve to advertise another area. C. The city may require a bond, in an amount determined by the council, to insure restoration of a model home area. D. Signs in a model home area shall be regulated by City Code section 4.20 and amendments thereto. E. Individual units, built on speculation, with no exterior alterations for model home purposes, shall be exempt from these requirements. F. Model homes may not be constructed prior to final plat approval by the council. G. Model homes may be constructed prior to the availability of public utilities, but not occupied as residential living units until public utilities are connected to the dwellings. Subd. 2. Grading of site prior to final plat. Subsequent to preliminary plat approval, the developer may apply for an excavation permit from the council and, upon receipt of such permit, may commence construction to the grades and elevations required by the approved preliminary plat. Said "excavation permit" shall be issued under the provisions of City Code section 4.30 and amendments thereto. Issuance of said "excavation permit" does not obligate the council, in any manner, to approve a final plat. Lot grading prior to the approval of a final plat shall be done under the requirements of section 13.30, subdivision 15, subparagraph H of this chapter. Subd. 3. Effective period of preliminary plat approval. The approval of a preliminary plat shall be effective for a period of one year or longer, as specified by the council. The council, however, may, upon adequate cause shown, grant an extension of the approval period. At the end of this time, final plat approval on the subdivision shall have been obtained from the council. Any preliminary plat not receiving final approval within the period of time set forth herein shall be null and void, except as provided by Minn. Stat. § 462.358, subd. 3c, and the developer shall be required to resubmit a new application for preliminary plat approval subject to all new zoning restrictions and subdivision regulations of the city existing at the time of submission of the new application. (See section 13.10, subdivision 4.) Subd. 4. Zoning regulations. Every plat shall conform with existing zoning provisions of the City Code and subdivision regulations applicable at the time of proposed final approval, except that any plat which has received preliminary approval shall be exempt from any subsequent amendments to the zoning chapter rendering the plat nonconforming, provided that final approval is obtained within the one-year or longer period, as specified by the council. Said conformance shall not be interpreted as restricting the council's authority to allow flexibility in density and dimensional requirements in areas zoned planned development (PD) as provided in the zoning chapter. Subd. 5. Private ownership of multiple-dwelling lots. Where the filing of a final plat on a multiple-dwelling project is to be delayed as approved by the council until after foundations, which will form lot boundaries, are constructed, said delay in filing shall be subject to the following conditions: A. All final plat procedures shall be followed and completed prior to issuance of building permits except for the preparation of final plat map, signing of the final plat, unless signature is not required by state law, and dedication of public lands shown on the plat. In place of the final plat map, the subdivider shall prepare a preliminary copy of the final plat map which the council shall use in granting its approval and the city shall use in issuing building permits. B. The final plat map shall be submitted, signed by the city, unless signature is not required by state law, and recorded with the county, and final plat requirements shall be met in all other respects prior to the occupancy for residential use of any dwelling unit included in the area of the final plat. Subd. 6. Findings related to preliminary and final plats. In the case of all platting, the planning commission and the council shall be guided by criteria, including the following, in approving, denying or establishing conditions related thereto: A. That the proposed subdivision does comply with applicable City Code provisions and the comprehensive guide plan. B. That the design or improvement of the proposed subdivision complies with applicable plans of the county, the state, or the metropolitan council. C. That the physical characteristics of the site, including, but not limited to, topography, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, water storage and retention, are such that the site is suitable for the type of development or use contemplated. D. That the site physically is suitable for the proposed density of development. E. That the design of the subdivision or the proposed improvements are not likely to cause environmental damage. F. That the design of the subdivision or the type of improvements are not likely to cause health problems. G. That the design of the subdivision or the type of improvements will not conflict with easements of record or with easements established by judgment of court. H. That completion of the proposed development of the subdivision can be completed in a timely manner so as not to cause an economic burden upon the city for maintenance, repayment of bonds or similar burden. I. That the subdivision has been properly planned for possible solar energy system use within the subdivision or as it relates to adjacent property. (Refer to city handbook on solar access.) J. That the design of public improvements for the subdivision is compatible and consistent with the platting or approved preliminary plat on adjacent lands. K. That the subdivision is in compliance with those standards set forth in the city's water quality and wetland management plan which is properly approved and filed in the office of the city clerk and in effect as of the date the subdivision application was received by the city, hereinafter referred to as the "water quality management plan." Said document and all of the notations, references and other information contained therein shall have the same force and effect as if fully set down herein and is hereby made a part of this chapter by reference and incorporated herein as fully as if set forth herein at length. It shall be the responsibility of the city clerk to maintain the water quality management plan and make the same available to the public. L. That the subdivision is in compliance with the city's storm water management regulations pursuant to the federal Clean Water Act as set forth elsewhere in this Code. M. That the subdivision is in compliance with the city's wetland protection and management regulations as set forth elsewhere in this Code. Subd. 7. Platting additions. A. Prior to granting final plat approval, the council may permit or require the plat to be divided into two or more additions and may impose such conditions upon the filing of the additions as it may deem necessary to assure the orderly development of the plat. B. The city may also require the developer to plat all areas not developed at the time of platting the first addition into outlots. Subd. 8. Public uses. A. Parks, trail, recreational areas, ponding areas and other public uses. 1. Designation on preliminary plat. Where a proposed park, recreational facility as defined in Minn. Stat. § 471.191, playground, wetland, trail, ponding or open space area, shown on the city's comprehensive guide plan, park development guide, official map, or suitable alternate approved by the council, is located in the whole or in part in a subdivision, such area or areas shall be shown on the preliminary plat or otherwise designated to the city. The city must first reasonably determine, however, that such area or areas will need to be acquired for the purposes stated above in this subsection. The city, whether acquiring land or a cash contribution in lieu thereof, shall give due consideration to the open space, recreation or common areas and facilities open to the public that the applicant proposes to reserve for this subdivision in making such determination. Such area or areas shall also be dedicated to the city by the subdivider if the council requests such dedication under the remaining provisions of this subdivision. 2. Parkland dedication or cash contribution. Said dedicated land, which shall be buildable land, shall be in an amount determined to be reasonable by the council as established by resolution. The cash contribution amount shall be established pursuant to section 13.20, subd. 10 of this ordinance. The cash contribution amount shall be based on the fair market value of the land no later than at the time of final approval. In lieu of the conveyance of dedicated land as provided above, the owner or subdivider may, at the option of the city, pay to the city, for use in acquisition and development of parks, a cash payment. The cash payment shall be placed in a special fund to be used only for the purposes for which the payments were obtained. Cash payments received must be used only for the acquisition and development or improvement of parks, recreational facilities, playgrounds, trails, wetlands, or open space based on the approved park system's plan. Cash payments must not be used for the ongoing operation or maintenance of parks, recreational facilities, playgrounds, trails, wetlands or open space. Previously subdivided property, from which a park dedication has been received, that is being resubdivided with the same number of lots, is exempt from additional park dedication requirements. As a result of resubdividing the property, if the number of lots is increased, then new park dedication or per lot cash contribution shall apply to the net increase of lots. 3. Dedication credits for construction. Dedication credit shall not be granted for the construction of recreational facilities unless a specific agreement granting credit is approved by the council. 4. Dedication of wetlands and ponding areas. (a) Wetlands and ponding areas, needed as a part of the overall city storm drainage plan, shall be dedicated in fee or easement at the option of the city and in a form acceptable to the city. However, no credit shall be given for park dedication unless said area meets the criteria for public parks as stated in the city's comprehensive plan and the city's park dedication resolution and is approved as such by the council. Said dedication of land or easement shall be in a form approved by the council. (b) As a prerequisite to plat approval and/or a waiver of plat approval, the applicant shall dedicate wetlands and ponding areas required under the city water quality management plan and/or shall make a cash contribution to the city's water quality management fund at the city's option. Wetland and ponding area dedication shall be in an amount as determined by the council as reasonably necessary to comply with the city's water quality management plan. The cash contribution amount shall be as established pursuant to section 13.20, subd. 10 of this ordinance. 5. Land in excess of dedication requirements. Where land proposed for public use exceeds the amount legally and reasonably required by the city and the subdivider will not dedicate the additional amount, the council shall have a maximum of four months from the date of preliminary plat approval by the council to proceed with an option or purchase of said additional amount. Where a purchase is not initiated, the plat shall be revised to permit another use and the processing of the plat shall continue. 6. Timing of dedication. If a new subdivision is designed to be platted into more than one addition, all park or other public use lands contemplated under this section for each phase of the subdivision, except streets, alleys or easements other than those leading directly to such sites, shall be dedicated by the time of approval of the final plat for that phase. 7. Condition of areas to be dedicated. Areas to be dedicated for public use, trail, wetland or ponding shall be brought to a suitable condition by the subdivider prior to acceptance by the city. All dead and diseased trees, trash, junk, unwanted structures or similar undesirable elements shall be removed by the owner at his expense. Said condition shall also be in accordance with the city handbook on environmental protection. 8. As a prerequisite to plat approval and/or a waiver of plat approval, the applicant shall dedicate land required to complete the city's trail plan and/or shall make a cash contribution to the city's park trail fund, at the city's option. Land dedication shall be in an amount as determined by the council as reasonably necessary to comply with the city's trail plan in accordance with the city's trail dedication policy. The cash contribution shall be as established pursuant to section 13.20, subd. 10 of this ordinance. For residential property, the cash contribution shall be made at the time of approval of the final plat or approval of the waiver of plat in the amount as determined by the rate schedule in effect at the time of the approval. With respect to commercial, industrial, or public facility property, the cash contribution shall be made at the time of the issuance by the city of a building permit in the amount as determined by the rate schedule in effect at the time of the issuance of the permit. B. Title and survey requirements. Lands so dedicated shall be accompanied by a certificate of survey or shall be designated as a lot or outlot on the plat as determined by the city. Further, such lands shall be free and clear of all liens and encumbrances including special assessments as evidenced by an up-to-date abstract of title or registered property abstract to be submitted at developer's cost to the city for its examination. Such dedication shall be in the form and manner as prescribed by the city attorney. Subd. 9. Landlocked parcels. As a general rule, the city shall not permit landlocked parcels or parcels that are only served by private easements. However, the city may permit the following: A. Landlocked parcels in a multiple-dwelling or commercial complexes provided said parcel(s) have access to a public street by an easement over another parcel within the same multiple-dwelling or commercial complex. Said landlocked parcel is permitted in this instance only for the purpose of establishing separate taxable parcels within a complex. B. Landlocked parcels which are unbuildable (outlots or parcels) reserved as permanent public open spaces such as ponding areas may be permitted. Subd. 10. Fees. Where fees are not specifically stated in this chapter, said fees shall be established by resolution of the council, which may revise the fee schedule from time to time. A schedule of all fees established by this chapter shall be published and available at the city hall. Subd. 11. Council vote. All actions related to this chapter, including amendments, variances, waivers and plat approvals, shall require a majority vote of the members of the council present at a duly constituted council meeting. Subd. 12. Planned developments. In platting areas zoned planned development (PD) districts as described in the zoning chapter, the following shall be required: A. A valid "planned development agreement" shall be entered into at or prior to final plat approval by the city or said approval shall be null and void. B. As a part of the approval of a plat, the council may grant any dimensional deviations from the strict dimensional requirements for each base zoning district as deemed necessary to accomplish an overall plan under the provisions of a planned development district. C. Said deviation as described in the above subparagraph shall not be interpreted to automatically increase densities above those permitted in the planned development agreement. Said deviations shall relate only to dimensions. D. Said dimensional deviations approved as a part of a plat in a planned development district shall not require individual variances. E. Said dimensional deviations as referenced in this subdivision of this chapter shall relate to lot area, lot width, lot depth, frontage on a public street, street width, setbacks for any yard, height, setback from adjacent zoning district or use, length of culs-de-sac, length of block and radius of culs-de-sac. F. Said dimensional deviations shall be clearly stated and documented at the time of approval by the council before they shall have full form and effect. Subd. 13. Plat approved without variances. Where a plat has been approved by the city and recorded with the county which contains a lot or lots which do not meet the minimum required dimensions as stated in this chapter or in the zoning chapter, said lots shall have the following status: A. Said lot(s) shall be considered conforming lots and be entitled to all rights normally expected with a conforming lot under the circumstances of subparagraphs B and C below. B. Said lot(s) shall not be entitled to any special consideration for other variances and no other dimensional variances other than those existing on the plat shall be automatically accrued. C. Deviations from the zoning chapter are noted in subdivision 12 of this section. Subd. 14. Building permits prior to public and private services. A. No permits until contract awarded. In plats that are to be served by municipal water and sanitary sewer, the city shall not issue building permits until a contract has been awarded for the installation of said water and sewer by the city or by the developer and as approved by the city. (See subdivision 1 of this section.) B. No occupancy until public and/or private utilities available. Where building permits are issued as provided in subparagraph A above, the building or units therein shall not be occupied (except model homes—see subdivision 1 of this section) until said building(s) are provided with public sewer and water service, private services (gas, electricity, sewer, water) and an improved public street to the extent that the street is graded and gravel surfaced. C. Where a building permit is issued under subparagraph B above, the person to whom the permit is issued proceeds at his own risk and the city assumes no obligation to provide public services within a specified time limit. D. Private septic system and well. Exceptions to subparagraph B above shall be automatically granted for public sewer and water utilities for lots which are served by private septic systems and private water wells when said private systems are approved by the city. Subd. 15. Noise abatement. Where a plat is located along a freeway, major arterial or other area which generates high volumes of noise, the subdivider shall be required to prepare a plan to provide noise abatement. Said plan shall provide for noise abatement through architectural site design, the construction of earth berms, dense vegetation, walls, or the combination thereof or similar means which shall be reviewed and approved by the city. Such barriers shall be constructed in accordance with PCA standards for the appropriate land use. Subd. 16. Consolidation of lots of record. The owner of contiguous platted lots of record may consolidate those lots at any one location into one lot by recording the consolidation with the county and filing a copy of a certificate of survey, showing same, with the city clerk within 30 days of recording. Subd. 17. Division of lots of record. Contiguous platted lots of record which have been consolidated shall not be resubdivided except through a replat or waiver of platting as provided in this chapter. Subd. 18. Preliminary plat compliance with floodplain requirements. With the approval of a preliminary plat, the city shall review the plat to insure that each lot or parcel contains sufficient area outside of the floodplain for structures, sewer systems and related activities.

(Code 1983, § 13.20, eff. 1-1-83; Ord. No. 54, 2nd series, eff. 6-10-88; Ord. No. 74, 2nd series, eff. 1-6-89; Ord. No. 96, 2nd series, eff. 2-16-90; Ord. No. 102, 2nd series, eff. 5-25-90; Ord. No. 138, 2nd series, eff. 4-29-92; Ord. No. 401, 2nd series, § 2, eff. 9-26-06; Ord. No. 516, 2nd series, § 1, eff. 3-5-2013)

Ask a question about Eagan law

Corpus searches the Eagan sections it holds and shows the ones that match, with their citations. Free, no sign-in.