For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.06 — Public right-of-way regulations

City Code of the City of Eagan, Minnesota (Codified through Ordinance No. 644, 2nd series, enacted April 7, 2026. (Supp. No. 43)) · Eagan City Code § 7.06

Corpus is an independent public-information project, not the official City of Eagan website. Stable reference: corpuslaw.us/code/bdecb8ec-3e65-47a9-84d2-3f059128db43

Sec. 7.06. - Public right-of-way regulations.

Subd. 1. Application and scope. This section shall apply exclusively to excavations and obstructions within public rights-of-way by any person who owns or controls, or intends to own or control, any utility service facility therein. All other excavations or obstructions are regulated elsewhere in this Code. Subd. 2. Definitions. The following words, terms and phrases, as used herein, shall have the following meanings: Abandoned facility means: (1) a facility no longer in service or physically disconnected from any other facility that is in use or still carries service; and that is deemed abandoned by the owner of the facility. Applicant means any public right-of-way user required to obtain a permit under this section. City means City of Eagan, Minnesota. City management costs. The actual costs incurred by the city for public right-of-way management, including, but not limited to, costs incurred in connection with the registration process, the right-of-way excavation or obstruction permit process, the inspection of project work and restoration and enforcement and correction of non-complying project work, mapping of public right-of-way users and maintenance and regulation of public rights-of-way occupied by public right-of-way users. Management costs do not include payment by a public right-of-way user for the use of the right-of-way, unreasonable fees of a third-party contractor used by a local government unit as part of managing its public right-of-way, including but not limited to any third-party contractor fee tied to or based upon customer counts, access lines, revenue generated by the public right-of-way user, or a local government unit, or the fees and cost of litigation relating to the interpretation of the act or any ordinance enacted under the act, or the city fees and costs related to appeals taken pursuant to this chapter. Collocate or collocation. Install, mount, maintain, modify, operate, or replace a small wireless facility on, under, within, or adjacent to an existing wireless support structure that is owned privately or by the city or other local government unit. Degradation means a decrease in the useful life of the right-of-way caused by excavation in or disturbance of the right-of-way, resulting in the need to reconstruct such right-of-way earlier than would be required if the excavation or disturbance did not occur. Degradation cost subject to Minnesota Rules 7819.1100 means the cost to achieve a level of restoration as determined by the city at the time the permit is issued, not to exceed the maximum restoration shown in plates 1 to 13, set forth in Minnesota Rules parts 7819.9900 to 7819.9950. Degradation fee means the estimated fee established at the time of permitting by the city to recover costs associated with the decrease in the useful life of the right-of-way caused by the excavation, and which equals the degradation cost. Director means the City of Eagan Director of Public Works and his/her designee. Emergency means a condition that (1) immediately endangers the life or safety of persons; (2) cause an immediate threat of significant loss or injury to property; or (3) requires immediate repair or replacement in order to restore service to customers. Equipment means anything tangible used to install, repair or maintain facilities in any public right-of-way. Excavate or excavation means to dig into or in any way remove or physically disturb or penetrate any public right-of-way ground surface, or any portion thereof. Excavation permit means a permit which is issued by the city authorizing the permittee to excavate in a public right-of-way as specifically described in the permit. Facility or facilities means anything tangible, including equipment, which is required to provide utility services, including wireless services. Hole means an excavation having a length that is equal to or less than the width of the public right-of-way for the section of the roadway where the work is occurring. Local representative means a person or designee of such person authorized by a public right-of-way user to accept service and to act and make decisions regarding matters within the scope of this section on behalf of the public right-of-way user. Micro wireless facility. A small wireless facility that is no larger than 24 inches long, 15 inches wide, and 12 inches high, and whose exterior antenna, if any, is no longer than 11 inches. Obstruct or obstruction means to place or the placement of any object or material within a public right-of-way, or to remove or the removal of an existing structure, or any portion thereof, from a public right-of-way. The term obstruction includes any operation or parking of a motor vehicle, trailer, or equipment within or on boulevards, sidewalks, trails, or other public property within a public right-of-way other than the vehicular traffic portion thereof. Obstruction permit means a permit which is issued by the city authorizing the permittee to obstruct a public right-of-way as specifically described in the permit, including the specified portion of the right-of-way, the permitted equipment, material, or other object, the permitted duration of the obstruction, and the permitted work/activity within the right-of-way. Patch or patching means a method of roadway surface replacement or restoration that consists of: (1) the compaction of the sub-base and aggregate base; and (2) the replacement, in kind, of the existing roadway surface for a minimum of two feet beyond the edges of the excavation in all directions. Permittee means a person to whom an excavation or obstruction permit has been issued by the city under this section. Person means an individual or entity subject to the laws and rules of this state, however organized, whether public or private, whether domestic or foreign, whether for profit or nonprofit, and whether natural, corporate, or political. Project or project work means any activity, including construction, reconstruction, installation, maintenance, relocation, or replacement of any facility or a public right-of-way in which the facility is located and restoration of the public right-of-way that is regulated under this section. Public right-of-way or public rights-of-way means the surface, air space above the surface and the area below the surface of any public street, highway, lane, path, alley, sidewalk, trail, avenue, boulevard, drive, court, concourse, bridge, tunnel, park, parkway, skyway, waterway, dock, bulkhead, wharf, pier, easement or similar property or waters within the city owned by or under control of the city, or dedicated or otherwise conveyed to the city for general public use, including, but not limited to, any riparian right, which, consistent with the purposes for which it was created, obtained or dedicated, may be used for the purpose of installing, operating and maintaining utility service facilities. No reference herein to a "public right-of-way" shall be deemed to be a representation or guarantee by the city that its interest or other right to control or use such property is sufficient to permit its use for the purpose of installing, operating and maintaining utility service facilities. Public right-of-way user means any person or entity which owns or controls a facility that is located, or is sought or intended to be located, in a public right-of-way including persons who have installation and maintenance responsibilities by contract, lease, sublease or assignment. Restore or restoration means the process, including patching, by which a public right-of-way and surrounding area, including pavement and foundation, is returned to the same condition that existed before any project work. Restoration cost means the amount of money paid to the city by a permittee to meet restoration requirements in accordance with plates 1 to 13 of the PUC rules. Service or utility service means: (1) Those services provided by a public utility as defined in Minnesota Statutes; (2) Services of a telecommunications right-of-way user, including transporting of voice or data information; (3) Services of a cable communications system as defined in Minnesota Statutes; (4) Services of natural gas or electric energy or telecommunications, including wireless services; (5) Services provided by a cooperative electric association organized under Minnesota Statutes; and Small wireless facility means: (1) A wireless facility that meets both of the following qualifications: (i) Each antenna is located inside an enclosure of no more than six cubic feet in volume or, in the case of an antenna that has exposed elements, the antenna and all its exposed elements could fit within an enclosure of no more than six cubic feet; and (ii) All other wireless equipment associated with the small wireless facility, excluding electric meters, concealment elements, telecommunications demarcation boxes, battery backup power systems, grounding equipment, power transfer switches, cutoff switches, cable, conduit, vertical cable runs for the connection of power and other services, and any equipment concealed from public view within or behind an existing structure or concealment, is in aggregate no more than 28 cubic feet in volume; or (2) A micro wireless facility. Trench means an excavation in the roadway surface having a length that is equal to or in excess of the width of the roadway or sections of roadway where the work is occurring. Utility pole means a pole that is used in whole or in part to facilitate telecommunications or electric service. Wireless facility means: (a) Wireless facility means equipment at a fixed location that enables the provision of wireless services between user equipment and a wireless service network, including: (1) Equipment associated with wireless service; (2) A radio transceiver, antenna, coaxial or fiber-optic cable, regular and backup power supplies, and comparable equipment, regardless of technological configuration; and (3) A small wireless facility. (b) Wireless facility does not include: (1) Wireless support structures; (2) Wireline backhaul facilities; or (3) Coaxial or fiber-optic cables (i) between utility poles or wireless support structures, or (ii) that are not otherwise immediately adjacent to or directly associated with a specific antenna. Wireless service means any service using licensed or unlicensed wireless spectrum, including the use of Wi-Fi, whether at a fixed location or by means of a mobile device, that is provided using wireless facilities. Wireless service does not include services regulated under Title VI of the Communications Act of 1934, as amended, including a cable service under United States Code, title 47, section 522, clause (6). Wireless support structure means a new or existing structure in a public right-of-way designed to support or capable of supporting small wireless facilities, as reasonably determined by a local government unit. Wireline backhaul facility means a facility used to transport communications data by wire from a wireless facility to a communications network. Subd. 3. Franchises. The city may, in addition to the requirements of this section, require any public utility or cable operator who has or seeks to have facilities or equipment located in any public right-of-way to obtain a franchise. Subd. 4. Registration requirement. A. Registration. As of the effective date of this chapter, any public right-of-way user, including any person or entity with installation and maintenance responsibilities by lease, sublease, collocation agreement or assignment, which owns or controls a facility within any public right-of-way, or any portion thereof, shall register with the city. Registration shall be deemed completed upon the public right-of-way user submitting to the city a completed registration form furnished by the city and paying the registration fee. A right-of-way user is required to update its registration within 60 days of any change of the information contained in a current registration statement. B. Transfer of ownership or interest. Whenever any public right-of-way user transfers, sells, assigns or otherwise conveys ownership or interest in facilities or equipment to another person, the registered public right-of-way user shall notify the city of the date of the conveyance and the name of the transferee within 30 days of the conveyance. Subd. 5. Permit requirement. A. Permit required. Except as otherwise provided in this Code, no person or public right-of-way user may obstruct or excavate any public right-of-way or install or collocate a small wireless facility or support structure without first having obtained the appropriate permit from the city unless another reporting process is approved by the director or his/her designee. An excavation permit is required for any excavation. An obstruction permit is required for any obstruction in connection with the installation, relocation, operation or maintenance of a utility service. Any public right-of-way user, which owns or controls a facility within any public right-of-way, or any portion thereof, on the effective date of this section, that subsequently excavates or otherwise obstructs any public right-of-way, or any portion thereof, shall first obtain a permit therefor as required under this section. B. Permit applications. 1. An application for a permit shall be on a form furnished by the city and completed and submitted to the city with the following information: a. The applicant's name; business mailing and headquarter location address; e-mail address; telephone number; and facsimile number. b. The local representative's name; address; e-mail address; telephone number; facsimile number; and current information regarding how to contact the local representative in an emergency. c. The name, address and telephone number of the person(s) or entities, other than the applicant, to perform the project work or any portion thereof. d. A certificate of insurance or self-insurance verifying the coverage as required in this section. e. All mapping data and information in form and substance as required in this section, except a registrant who is not applying for an excavation or obstruction permit need not provide this information. f. A detailed description and drawing to a scale as required by the city of the proposed project and project work, including identification of the obstructions to be placed, the size and depth of any excavation, the schedule for commencement and completion of the proposed project, and the location and size of any trees impacted in the designated work area. 2. Permits for multiple telecommunications facilities, including small wireless facilities, may be filed in consolidated applications as required by state law (Minn. Stats. § 237.163, Subd. 3a). Permit applications that propose collocation of facilities shall indicate to extent practicable the owner of the other facility or facilities, and if the city is the owner of those facilities, the application shall include a request for a collocation agreement using a form and providing such information as required by the city. C. Issuance or denial of permit. 1. Except as otherwise provided herein for small wireless facility permits, if the applicant has satisfied the requirements of this section, the city shall issue a permit within 90 days of receiving a completed application, or shall provide written reasons for denial of the application if the city believes the requirements have not been satisfied, unless that time period is extended or tolled as specified in state law, (Minn. Stats. § 237.163, Subd. 3c). If the city receives applications within a single seven-day period from one or more applicants seeking approval of permits for more than 30 facilities, the city may extend the 90-day deadline by an additional 30 days. If the city elects to invoke this extension, it must inform in writing any applicant to whom the extension will be applied. 2. For applications related to placement of small wireless facilities, the deadline for the city's action on each application will be in accordance with FCC Rules and regulations. As in effect as of December 31, 2018, the city will review and act on an application for collocation of a small wireless facility on an existing support structure no later than 60 days from date of receipt of complete application and an application for placement of a small wireless facility on a new support structure no later than 90 days from date of receipt of complete application. If the applicant has satisfied the requirements of this section, then a permit will be issued; otherwise the city shall provide written reasons for denial of the application. 3. The city may deny a permit for failure to meet the requirements and conditions of this section or if the city determines that the denial is necessary to protect the public health, safety, and welfare or when necessary to protect the right-of-way and its current and future use. The city may deny a permit if the public right-of-way user has failed to comply with previous permit conditions. The city may withhold issuance of a permit until conditions of previous permits are met. The denial of a permit must be made in writing and must document the basis for the denial. The city must notify the applicant in writing within three business days of the decision to deny a permit. If an application is denied, the applicant may address the reasons for denial identified by the city and resubmit its application. If the application is resubmitted within 30 days of receipt of the notice of denial, no additional application fee shall be imposed. The city must approve or deny the resubmitted application within 30 days after submission. 4. Permit applications that propose collocation of facilities on city-owned poles, buildings, or other structures owned or under the control of the city shall be authorized by the council upon terms and conditions established by the council. A wireless service provider that is granted authority to collocate small wireless facilities on wireless support structures owned or controlled by the city and located within the public roads or rights-of-way is required to enter into a standard small wireless facility collocation agreement, but not an individual license, franchise, or other similar agreement with the local government unit or any other entity. Any initial engineering survey and preparatory construction work associated with collocation must be paid by the cost causer in the form of a onetime, nonrecurring, commercially reasonable, nondiscriminatory, and competitively neutral charge to recover the costs associated with a proposed attachment. Subd. 6. Conditions of permit and registration. 1. All permits issued and all registrations made under this section shall be subject to the following requirements: A. All permits issued under this section or a copy of the permit shall be conspicuously displayed or otherwise available at all times at the indicated project work site and shall be available for inspection immediately upon request by the director or his/her designee. B. If the obstruction or excavation of the public right-of-way begins later or ends sooner than the dates specified in the permit, the permittee shall promptly notify the director. C. Installation, placement, location, and relocation of equipment and facilities shall comply with all federal, state and local laws. D. Public right-of-way restoration shall be in accordance with the restoration regulations set forth in this section. E. Installation of all underground utilities shall be in accordance with the underground utilities regulations set forth in this section and all other applicable federal, state and local laws. F. Precautions shall be taken as are necessary to avoid creating unsafe or unsanitary conditions and a permittee shall not obstruct a public right-of-way, except as expressly authorized by the permit, so as to hinder the natural free and clear passage of water through the gutters or other waterways. Personal vehicles of those doing work in the public right-of-way may not be parked within or next to a permit area, unless parked in conformance with city parking regulations. The loading or unloading of trucks must be done solely within the defined permit area unless specifically authorized by the permit. G. Project operations and work shall be conducted in a manner so as to ensure the least obstruction to and interference with present and continued use of the public right-of-way. H. Precautions shall be taken to assure the safety of the general public, employees, invitees and those who require access to abutting property, including appropriate signage. I. The permittee shall notify abutting property owners with a 48-hour written notice prior to commencement of any project work that may disrupt the use of and access to the abutting property. J. The permittee involved in underground projects shall register with Gopher State One Call and comply with the requirements thereof. K. The permittee shall comply with the Uniform Traffic Manual for Traffic Control at all times during any project work and shall protect and identify excavations and work operations with barricade flags in the daylight hours and by warning lights at dusk and night. L. The permittee shall comply with all conditions of the permit. M. When any trail or drive has been cut, the appropriate signage must be kept in place and maintained until restoration is complete. N. The permittee shall provide proper trench protection as required by O.S.H.A. to prevent any cave-in; injury to property or persons; or enlargement of the excavation. O. Excavations, trenches and jacking pits off the roadway surface area or adjacent to the roadway or curbing shall be sheathed and braced. When unattended, all excavations, trenches and jacking pits shall be protected to prevent surface drainage. P. The permittee shall protect the root growth of significant trees and shrubbery located within the public right-of-way and adjacent thereto. Q. The permittee shall coordinate project work and installation of facilities in co-locations involving other public right-of-way users. R. The permittee shall maintain access to all properties and cross streets during project work, including emergency vehicle access. S. The permittee shall physically locate property lines abutting the project work. The permittee shall replace, with the services of a Minnesota-licensed surveyor, any property corners or monuments disturbed as a result of the project. T. The permittee shall complete restoration of the public right-of-way in conformance with this section. U. No permittee, or any agent, subcontractor or employee thereof, shall use lugs (steel tracks) on any roadway surfaces. V. The permittee shall remove daily all dirt or debris from sidewalks, trails, public and private roadway surfaces and curbs and gutters during project work. W. The permittee shall obtain all other necessary permits, licenses and approvals, pay all required fees therefore and comply with all requirements of local, state and federal laws. X. The permittee shall not do any work outside the project area as specified in the permit. Y. The permittee shall screen all aboveground facilities and make reasonable accommodations for decorative enclosures, support structures or signs, as required by the director of public works, to be aesthetically compatible with existing streetscape and the ornamental design or theme of the immediate area. Screening methods shall include the use of shrubs, trees and/or with landscape rock or installation using stealth or camouflaged forms of the facility. The director may also impose reasonable restocking, replacement, or relocation requirements when a new support structure is placed in a public right-of-way. No equipment or facilities shall visibly or physically block or in any manner interfere with any existing streetscape, ornamental structures or displays, or other amenities located within the city's right-of-way. Z. Any facility collocated on a city-owned support structure shall be of a color and design so to match the color, design and pattern of the existing support structure(s) and any replacement structures after the issuance of the permit. Any new support structure, and any facility located thereon, erected within a city-owned right-of-way shall be of a color and design so to match the color, design and pattern of existing structures (e.g., light/lampposts) and any replacement structures after the issuance of the permit. AA. Small wireless facilities shall be subject to the regulations set forth in Minn. Stats. ch. 237, if not otherwise set forth herein. BB. The city may impose other reasonable conditions to protect the public health, safety and welfare or, when necessary, to protect the right-of-way and its current and future use. 2. Small wireless facility conditions: in addition to the conditions set forth above as applicable, the placement or installation of a new wireless support structure, the collocation of a small wireless facility, or other installation of a wireless facility in the right-of-way shall be subject to the following requirements: A. A small wireless facility shall only be collocated on the particular wireless support structure, under those attachment specifications, and at the height indicated in the applicable permit application. B. No new wireless support structure installed within the right-of-way shall exceed 50 feet above ground level in height without the city's written authorization, provided that the city may impose a lower height limit in the applicable permit to protect the public health, safety and welfare or to protect the right-of-way and its current use, and further provided that a wireless support structure that replaces an existing wireless support structure in the public right-of-way that is greater than 50 feet above ground level in height may be placed at the height of the existing wireless support structure, subject to such conditions or requirements as may be imposed in the applicable permit. C. No wireless facility constructed in the right-of-way after May 30, 2017, may extend more than ten feet above a wireless support structure existing on May 30, 2017. D. Where an applicant proposes to install a new wireless support structure in the right-of-way, the city may impose separation requirements between such structure and any existing wireless support structure or other facilities in and around the right-of-way. Notwithstanding, there shall be no less than 600 linear feet between each support structure on which a small wireless facility(s) is located. E. Where an applicant proposes collocation on a decorative wireless support structure, sign, or other structure not intended to support small wireless facilities, the city may impose reasonable requirements to accommodate the particular design, appearance, or intended purpose of such structure. F. Where an applicant proposes to replace a wireless support structure, the city may impose reasonable restocking, replacement, or relocation requirements on the replacement of such structure. G. No small wireless facility shall be collocated on any city owned traffic control device. H. No more than three small wireless facilities shall be collocated on a single support structure. Subd. 7. County or state rights-of-way. Any public right-of-way user who is required to obtain any county or state permit for excavation or obstruction in any Dakota County or Minnesota Department of Transportation right-of-way must provide notification of permitting to the city within one week of obtaining the permit but no less than 48 hours before the excavation would begin. Subd. 8. Installation of underground facilities within public rights-of-way. The permittee shall comply with the following requirements when installing underground facilities: A. Underground facilities shall, where reasonably possible, be installed outside the paved or surface area. If unable to install outside the surfaced area, the installation shall be as close to the edge of the roadway surface as possible to allow access thereto without unnecessarily disturbing paved areas of the roadway; B. Public right-of-way alignment and grade shall be maintained; C. Fiber facilities shall be buried in a proper conduit and at a depth of no less than three feet deep and no more than four feet; copper facilities below concrete or bituminous paved roadway surfaces shall be buried no less than three feet deep and no more than four feet deep, and all other copper facilities shall be buried no less than 30 inches deep and no more than four feet deep; D. All underground facilities which cross streets or hard surfaced driveways shall be bored and installed in conduit when requested by the city. Gas does not need to be installed in conduit. E. When required, the permittee shall excavate an observation hole over a city utility to ensure that a city utility is not damaged; F. If the project work involves an open cut, the permittee shall install visual tracers 12 inches over buried facilities. If other construction methods are used, substitute location methods may be used upon approval by the city; G. During plowing or trenching of facilities, a warning tape shall be placed at a depth of 12 inches above copper cables with over 200 pairs and fiber facilities and a locating wire or conductive shield shall be installed above buried telecommunication facilities, except for di-electric cables. H. Restoration of areas disturbed by facilities will include returning the right-of-way to the same condition that existed before excavation as per Minn. Rules 7819.1100 Subject to this standard, plates 1 to 13, shown in parts 7819.9900 to 7819.9950, indicate maximum limits of restoration methods and area requirements the local government unit can impose when a right-of-way user excavates in the public right-of-way. The local government unit and right-of-way user may agree to a lesser requirement. The right-of-way user is responsible for all of its work done in the public right-of-way, whether by employees, agents, or independent contractors. All levels of restoration include compaction of the materials placed in the excavation of the sub-grade and aggregate base, plus pavement replacement, in kind. If required by the local government unit, all work must be performed according to the local government unit's specifications and drawings. I. All facilities shall be located so as to not interfere with existing and potential future traffic signals and signs; J. Unless approved by the city, all above ground appurtenances shall be located no closer than ten feet to city hydrants, waterline valves, manholes, lift stations, catch basins; not in front of or within visual sight lines of any city sign, monument or amenity for facilities or parks; and no closer than two feet from sidewalks and trails; K. Underground facilities shall not be installed between a hydrant and an auxiliary valve; L. Where utility easements exist beyond the roadway surface area of the public right-of-way and space is available therein, underground facilities shall not be installed within five feet of hydrants, waterline valves, lift stations, manholes or catch basins. In those areas in which no utility easement exists, placement of an underground facility shall be between the edge of pavement and no closer than three feet to an existing city utility appurtenance, unless approved by the city. M. The location and installation of telecommunications facilities shall comply with the National Electric Safety Code, as incorporated by reference in Minnesota Statutes. Subd. 9. Supplement permit or permit extension. A. Limitation on area. No permittee shall obstruct or excavate an area greater than that specified in the permit without first obtaining a new permit or permit extension therefor by the city. B. Limitation on dates. No permittee shall begin its work before the permit start date or, except as provided herein, continue working after the completion date. Subd. 10. Revocation of permits. A. Grounds for revocation. The city may revoke a permit issued hereunder on the following grounds: 1. A material provision or condition of the permit or City Code was substantially breached. 2. A material misrepresentation in the application for a permit. 3. The permittee failed to maintain the required bonds or other security and insurance. 4. The permittee failed to complete the project work within the time specified in the permit unless the failure to complete work is due to reasons beyond the permittee's control. 5. The permittee failed in a timely manner to correct work that does not conform to applicable standards, conditions, federal, state or local laws. 6. An evasion or attempt to evade any material provision of the public right-of-way permit, or the perpetration or attempt to perpetrate any fraud or deceit upon the city. B. Notice of revocation. If the director determines that grounds for revocation exists, the director shall provide written notice to the permittee. If the permittee's violation is related to non-complying project work, the director shall notify the permittee of the actions necessary to remedy such violation within a reasonable period of time or be subject to potential revocation of the permit. The director may impose additional or revised conditions on the permit to mitigate or remedy the violation. C. Right to hearing by city council. In the event that the permittee fails to remedy the violation for which the director gave the permittee notice, a revocation of permit hearing shall be held before the city council at the immediately next city council meeting. The purpose for the hearing shall be to determine whether any of the grounds for revocation as set forth herein exist against the permittee. No suspension or revocation shall take effect, until the permittee has been afforded a hearing as provided in this subparagraph. Such hearing shall be set by the city council upon written notice to the permittee served by U.S. Mail not less than 15 days prior to the hearing date, specifically stating the date, time and purpose thereof. D. Revocation costs. If a permit is revoked, the permittee shall reimburse the city for its reasonable costs (including restoration costs) incurred in connection with the revocation. Subd. 11. Permit fees. A. All permit fees shall be submitted to the city with the application. Permit fees shall be set to recover the city management costs and, where applicable, restoration costs. The permit fees shall be established by city Council resolution. No permit fee shall be refundable. No permit fees shall be required for any obstruction or excavation permit issued to the city, although the city shall be allocated its full portion of the city management costs in calculating the permit fees. Except where an extension permit has been granted, the permittee shall, as a delay penalty, be required to obtain a new permit and pay the associated fee for failure to complete the project work under the initial permit within the required time period. Applicants may jointly apply for permits to excavate or obstruct the right-of-way at the same place and time. There shall be a single permit and permit fee for joint excavation and obstruction permit applications. Applicants must agree among themselves as to the portion each will pay and indicate the same on the application. B. Total application fees for a small wireless facility permit must comply with this section with respect to costs related to the permit. For each small wireless facility attached to a wireless support structure owned by the city, the small wireless provider shall pay the following fees: 1. $270.00 per year for rent to occupy space on a wireless support structure owned by the city; 2. The application fee for collocation or new support structures within city property shall be established by city council resolution; and 3. A monthly fee for electricity used to operate a small wireless facility, if not purchased directly from the applicable electrical utility provider, at the rate of: (a) $73.00 per radio node less than or equal to 100 max watts; (b) $182.00 per radio node over 100 max watts; or (c) The actual costs of electricity, if the actual costs exceed the amount in clauses (i) or (ii) above. Permit fee for small wireless facilities: as required by state law, a person is not required to pay a small wireless facility permit fee, obtain a small wireless facility permit, or enter into a small wireless facility collocation agreement to solely conduct any of the following activities: 1. Routine maintenance of a small wireless facility; 2. Replacement of a small wireless facility with a new facility that is substantially similar or smaller in size, weight, height, and wind or structural loading than the small wireless facility being replaced; or 3. Installation, placement, maintenance, operation, or replacement of micro wireless facilities that are suspended on cables strung between existing utility poles in compliance with national safety codes. Prior to the performance of any of the above excepted activities, the small wireless facility provider shall provide the city advance notification of these activities if the work will obstruct a public right-of-way. Subd. 12. Public right-of-way restoration. A. Timing. All project work under a permit shall be completed within the dates specified in the permit, unless the project work could not be completed due to circumstances beyond permittee's control, including seasonal weather prohibitions or inclement weather. B. Restoration costs. The permittee shall restore the public right-of-way and assume all costs therefor unless otherwise agreed upon. The right-of-way user shall remain responsible for replacing and compacting the sub-grade and aggregate base material in the excavation. The city, at its option, may choose to perform its own restoration including any paving. If the city performs the restoration pursuant to this paragraph, the permittee shall pay to the city all costs thereof within 30 days of billing. If following such restoration, the roadway surface, boulevard, sidewalk, curb or related infrastructure settles due to permittee's improper back-filling; the permittee shall, at its option either correct the defect or pay to the city all costs associated with correcting the defective work within 30 days of billing. If the permittee restores the public right-of-way, the city may require, and the permittee shall provide at the time of application for the permit, a city specified type of security, in accordance with PUC rules, to cover the cost of repair and restoration. If within 24 months after completion of restoration of the right-of-way, the director determines the right-of-way has been properly restored, the posted security will be released. C. Standards. All restoration shall be in accordance with the standards and materials specified by the city. The city shall establish written procedures and standards for public right-of-way restoration, which shall comply with PUC standards. Subject to PUC rules, the city shall have the authority to prescribe additional restoration procedures and standards on a case by case basis based on the following considerations: 1. The number, size, depth and duration of the excavation, disruption or damage to the public right-of-way; 2. The traffic volume carried by the public right-of-way; 3. The character of the neighborhood surrounding the public right-of-way; 4. The pre-project condition of the public right-of-way; 5. The remaining life-expectancy of the public right-of-way due to the project; 6. The costs of the restoration method in relation to the prevention of an accelerated depreciation of the public right-of-way that could result due to the project work in the public right-of-way; and 7. The likelihood that the particular restoration method would be effective in slowing the depreciation of the public right-of-way that would otherwise occur. D. Duty to correct defects. The permittee shall guarantee the restoration of the public right-of-way for 24 months following its completion (12 months for turf establishment). During the 24-month period, the permittee shall, upon written notification from the city, correct all non-complying restoration work, using the method required by the city. The correction work shall be completed within ten calendar days of the receipt of the notice from the City, not including days during which work cannot be done due to circumstances constituting force majeure or of unseasonable or inclement weather. E. As built drawings. The permittee shall, if not already provided through another filing made within one year of completion of the project; annually submit to the city "as-built" drawings in a format usable by the city, as per state statutes, incorporating project work and restoration. Subd. 13. Inspection. A. Site inspection. The permittee shall make the project work site available to the director, and all others authorized by law, for inspection at all reasonable times during the execution and upon completion of the project work. B. Inspection findings and requirements. 1. The director may order the immediate cessation of any project work which poses a serious immediate threat to the life, health, safety or welfare of the public. 2. The director may order the permittee to correct any project work to comply with the terms of the permit or other applicable standards, conditions or laws. The order shall state the violation, the terms of correcting the violation and that failure to correct the violation within the stated time limits shall be cause for revocation of the permit. If the violation is not corrected within the stated time limits, the director may initiate revocation of the permit. C. Notice of completion. The permittee shall sign a certificate of project completion stating the completion date, identification of the installer and designer of record and certifying that the project work was completed in accordance with the requirements herein. Subd. 14. Permissible work without a permit. A. Emergency exception. All persons with facilities in the public right-of-way shall include the city in its list of those to be notified immediately of any event regarding its facilities that may be considered as an emergency. The owner of the facilities may proceed to take whatever actions are necessary to respond to the emergency, but shall apply for the necessary permits, pay the fees associated therewith and fulfill all requirements as set forth in this section within two business days after the occurrence of the emergency. These permitting requirements shall not apply if the repair is made within the hole of the permitted excavator. If the city becomes aware of an emergency regarding facilities, the city will attempt to contact the local representative of each facility affected, or potentially affected, by the emergency. The city may take whatever action it deems necessary to respond to the emergency, the cost of which shall be assumed and paid by the owner of the facility which occasioned the emergency. Subd. 15. Mapping data. A. Information required. All permittees shall provide mapping information in accordance with Minnesota Rules and as follows: 1. The location of underground and above ground appurtenances of the public right-of-way user's mains, cables, conduits, switches and related equipment and facilities, identified by: (a) Offsets from property lines, distances from the centerline of the public right-of-way and curb lines and/or other reference points as requested by the city; or (b) Coordinates derived from the coordinate system being used by the city. 2. The type, quantity and size of the equipment; 3. A dimensional description of above-ground appurtenances; 4. A legend explaining symbols, characters, abbreviations, scale and other data shown on the map; and 5. The location of any facilities that were abandoned in conformance with Minnesota Statutes. B. Submittal requirements. 1. Within six months after the effective date of this section, all public right-of-way users which own or control facilities within public rights-of-way within the city on the effective date of this section shall submit detailed mapping data in accordance with this subdivision for all facilities and equipment located within the public right-of-way. Following initial mapping, all right-of-way users shall submit detailed mapping data by April 1 st of every year for all new facilities located within public rights-of-way in the city during the preceding calendar year. 2. At the request of any public right-of-way user, information required by the city which qualifies as "trade secret" data under the Minnesota Data Practices Act shall be protected accordingly. Subd. 16. General public right-of-way regulations. A. Undergrounding facilities. Any new non-replacement facilities or equipment shall be located underground or contained within buildings or on other structures unless prohibited/restricted in accordance with all applicable federal, state or local laws. B. Corridors. The city may assign specific corridors within the public right-of-way, or portion thereof, as may be necessary for each type of facility. All permits issued by the city involving the installation or replacement of facilities shall designate the proper corridor for the facility at issue. C. Limitation of space. To protect the health, safety, and welfare of the city or when necessary to protect the public right-of-way and its current use, the city may prohibit public right-of-way users from a particular right-of-way after consideration of the public interest, the public's needs for the particular utility service, the condition of the public right-of-way, the time of year with respect to essential utilities, the protection of existing facilities in the public right-of-way, and future City plans for public improvements and development projects which have been determined to be in the public interest. D. Relocation of facilities. A public right-of-way user shall promptly, and at its own expense, with due regard to seasonal working conditions, permanently remove and relocate any facility in the public right-of-way when it is necessary to prevent interference and not merely for the convenience of the City, in connection with: (1) a present or future city use of the public right-of-way for a public project; (2) the public health or safety; or (3) the safety and convenience of travel over the public right-of-way. The public right-of-way user shall restore any public rights-of-way in accordance with this section. A right-of-way user is not required to remove or relocate its facilities from a right-of-way that has been vacated and in favor of a non-governmental entity unless and until the reasonable costs to do so are first paid to the right-of-way user. E. Damage to other facilities. Public right-of-way users shall be subject to all restoration requirements provided in this section. Every public right-of-way user shall be responsible for the cost of repairing any facility it damages. This provision is intended to include costs for damages to boulevard amenities placed by adjacent property owners, (e.g., sprinkler systems, etc.). Each facility owner shall be responsible for the cost of repairing any damage to the facilities of another occasioned by an emergency related to that owner's facilities. Subd. 17. Public right-of-way vacation. A. Reservation of right. If the city vacates a public right-of-way which contains the equipment or facilities of a public right-of-way user and the vacation does not require the relocation of the equipment or facilities, the city shall reserve, to and for itself and the public right-of-way user, the right to install, maintain and operate any equipment and facilities in the vacated public right-of-way and to enter upon such public right-of-way at any time for the purpose of reconstruction, inspecting, maintaining or repairing the same. B. Relocation of facilities. If the vacation requires the relocation of the public right-of-way user's equipment or facility; and the vacation proceedings are initiated by the public right-of-way user or the city, for a public project, the public right-of-way user shall pay the relocation costs. If the vacation proceedings are initiated by a person or persons other than the public right-of-way user, the initiating person or persons shall pay the relocation costs. Subd. 18. Indemnification and liability. A. Limitation of liability. Upon the issuance of a public right-of-way permit, the city does not assume any liability (i) for injuries to persons, damage to property or loss of service claims by parties other than the registrant or the city, or (ii) for claims or penalties of any sort resulting from the installation, presence, maintenance or operation of equipment or facilities by registrants or permittees or activities of registrants or permittees. B. Indemnification. A registrant or permittee shall indemnify, keep and hold the city, its officials, employees and agents, free and harmless from any and all costs, liabilities, and claims for damages of any kind arising out of the construction, presence, installation, maintenance, repair or operation of its equipment and facilities, or out of any activity undertaken in or near a public right-of-way, whether or not any act or omission complaint of is authorized, allowed or prohibited by a public right-of-way permit. The foregoing does not indemnify the city for its own negligence except for claims arising out of or alleging the city's negligence in issuing the permit or in failing to properly or adequately inspect or enforce compliance with a term, condition or purpose of a permit. This section is not, as to third parties, a waiver of any defense or immunity otherwise available to the registrant, permittee or the city, and the registrant or permittee, in defending any action on behalf of the city, shall be entitled to assert in any action every defense or immunity that the city could assert on its own behalf. If the registrant or permittee is required to indemnify and defend, it shall thereafter have control of the litigation, but the registrant or permittee may not settle the litigation without the consent of the city. Such consent will not be unreasonably withheld. Subd. 19. Abandoned facilities. A. Notification. A public right-of-way user shall notify the city when facilities are, abandoned. The public right-of-way user shall submit to the director a plan for the removal of the abandoned equipment or facility. The director may require the public right-of-way user to post a bond in an amount sufficient to reimburse the city for reasonably anticipated costs to be incurred in removing the equipment and facilities if the public right-of-way user fails to do so. B. Removal of abandoned facilities. A right-of-way user that has abandoned facilities in the right-of-way shall remove them from that right-of-way if required in conjunction with other right-of-way repair, excavation or construction, at right-of-way user's expense, unless the city waives this requirement. A right-of-way user that has abandoned facilities in the right-of-way shall continue to comply with and complete a "locate" and map/mark the location of the abandoned facility upon all locate requests/orders as required by Minnesota law. When a right-of-way user fails to complete a locate of an abandoned facility when requested or upon issuance of a locate order and such failure results in a city project to be delayed, the right-of-way user shall pay for the city's costs, claims and damages, including the loss of revenue of its project contractors, for forced delay on project due to failure to locate and map abandoned facilities as required herein. Subd. 20. Appeal. A public right-of-way user that: (1) has been denied registration; (2) has been denied a permit; (3) has had permit revoked; or (4) believes that the fees imposed are invalid, may have the denial, revocation, or fee imposition reviewed by the city council upon written request. The city council shall act on a written request at its next regularly scheduled meeting. The decision by the city council shall be in writing and supported by written findings establishing the reasonableness of the decision. Subd. 21. Insurance. All certificate(s) of insurance or self-insurance required under this section shall provide the following: (1) that an insurance policy has been issued to the applicant by an insurance company licensed to do business in the State of Minnesota, or a form of self-insurance acceptable to the director; (2) verify that the applicant is insured against claims for personal injury, including death, as well as claims for property damage arising out of the (i) use and occupancy of the public right-of-way by the permittee, its officers, agents, employees and permittees, and (ii) placement and use of facilities and equipment in the public right-of-way by the permittee, its officers, agents, employees and permittees, including, but not limited to, protection against liability arising from completed operations, damage of underground facilities and collapse of property; (3) name the city as an additional insured as to whom the coverages required herein are in force and applicable and for whom defense will be provided as to all such coverages; (4) require that the director be notified 30 days in advance of cancellation of the policy or material modification of a coverage term; (5) indicate comprehensive liability coverage, automobile liability coverage, workers compensation and umbrella coverage established by the director in amounts sufficient to protect the city and the public and to carry out the purposes and policies of this chapter: Public Liability, including premises, products and complete operations GENERAL LIABILITY: | Bodily Injury Liability $1,000,000 each person, $3,000,000 each occurrence Property Damage Liability $3,000,000 each occurrence In lieu of (1) and (2) Bodily Injury and Property Damage Combined $3,000,000 single limit Automobile Liability Insurance, including owned, non-owned and hired vehicles COMPREHENSIVE: | Bodily Injury Liability $1,000,000 each person, $3,000,000 each occurrence Property Damage Liability $3,000,000 each occurrence In lieu of (1) and (2) Bodily Injury and Property Damage Combined $3,000,000 single limit The city may require a copy of the actual insurance policies. If the person is a corporation, a copy of the certificate required to be filed under Minn. Stats. § 300.06 as recorded and certified by the secretary of state. A copy of the person's order granting a certificate of authority from the Minnesota Public Utilities Commission or other applicable state or federal agency, where the person is lawfully required to have such certificate from said commission or other state or federal agency. A franchise agreement may exempt a permittee from this paragraph.

(Code 1983, § 7.06, eff. 1-1-83; Ord. No. 299, 2nd series, § 2, eff. 9-14-00; Ord. No. 582, 2nd series, § 1, eff. 3-8-2019)

Ask a question about Eagan law

Corpus searches the Eagan sections it holds and shows the ones that match, with their citations. Free, no sign-in.