§ 10-5-1 — GENERAL PROVISIONS
Lakeville, Minnesota Code of Ordinances (2026 S-14, code current through Ord. 1122, passed 4-20-2026) · Lakeville Code of Ordinances § 10-5-1
Corpus is an independent public-information project, not the official City of Lakeville website. Stable reference: corpuslaw.us/code/0e78a84d-b890-4ff0-960b-fa0710b53906
10-5-1: GENERAL PROVISIONS:
A. Before a final plat is signed by the city, the subdivider shall pay all applicable fees and enter into a development contract setting forth the conditions under which the plat is approved. (Ord. 673, sec. 1, 7-17-2000) B. Before a final plat is signed by the city, the subdivider shall also furnish the city financial security in the form of a cash escrow or letter of credit. Letters of credit must be from a state or federally chartered bank or savings and loan association, insured by the Federal Deposit Insurance Corporation, that has an office in the state of Minnesota or a subsidiary of such bank or savings association with an office in the state of Minnesota. If the subdivider fails to perform any obligations under the development contract, the city may apply the security to cure the default. (Ord. 795, sec. 1, 11-7-2005) 1. If the developer is going to install the public improvements, the required security shall be the sum of the following fixed or estimated costs: a. Utilities. b. Streets. c. Streetlights. d. Erosion control. e. Engineering, to include developer's design, surveying and construction observation. f. Landscaping. g. Principal amount of special assessments previously levied against the property together with one year of interest. h. Real estate tax for one year, if there are special assessments. i. City engineering fees. j. Wetland mitigation. k. Custom graded lots. l. Removal of buildings, encroachments and temporary improvements as required. m. Tree preservation. n. Lot corners/iron monuments. o. Retaining walls. p. Site restoration. q. Private signage and pavement markings. r. Record drawings. s. Grading certification. t. Stormwater basins. u. City legal expenses. v. Abandonment of any wells or septic systems. w. Undergrounding of utilities. (Ord. 866, sec. 52, 5-17-2010) 2. If the city is going to install the public improvements, the required security shall be the sum of the following fixed or estimated costs: a. Principal amount of special assessments for public improvements to be installed together with one year of interest. b. Streetlights. c. Erosion control. d. Deferred park dedication charges on commercial and industrial property. e. Landscaping. f. Storm sewer connection charges. g. Real estate tax for one year. h. Principal amount of special assessments previously levied against the property together with one year of interest. (Ord. 795, sec. 1, 11-7-2005) C. No final plat shall be approved by the council without first receiving a report from the city engineer that the improvements described therein together with the agreements and documents required under this section, meet the requirements of the city. The administrator shall also certify that all fees required to be paid to the city in connection with the plat have been paid or that satisfactory arrangements have been made for payment. (Ord. 673, sec. 1, 7-17-2000) D. The city shall require of a subdivider submission of a warranty/maintenance bond in the amount equal to the original cost of the improvements or such lesser amount as agreed to by the city engineer. The required warranty period for materials and workmanship from the utility contractor installing public sewer and water mains shall be two (2) years from the date of final acceptance by city council or one year following final acceptance by city council of the final bituminous wearing surface for city streets as approved by the city engineer. The required warranty period for materials and workmanship from the street contractor installing public streets shall be one year from the date of final acceptance by city council of the final bituminous wearing course. The required period for sod, trees and landscaping shall be two (2) years. (Ord. 866, sec. 53, 5-17-2010) E. The subdivider is required to submit the final plat in electronic format. The electronic format shall be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading, utilities, streets) shall be in electronic format in accordance with standard city specifications. The subdivider shall also submit one complete set of reproducible construction plans on mylar. (Ord. 866, sec. 54, 5-17-2010) F. All of the required improvements to be installed under the provisions of this title shall be approved by and subject to the inspection of the city engineer. All of the city's expenses incurred as the result of the requirement improvements shall be paid either directly, indirectly or by reimbursement to the city by the subdivider. (Ord. 673, sec. 1, 7-17-2000) G. Prior to the release of the required grading security, an as built certificate of survey shall be submitted to verify that the final as built grades and elevations of the lot and building and building setbacks are consistent with the approved grading plan for the development and amendments as approved by the city engineer and that all required property monuments are in place. (Ord. 866, sec. 58, 5-17-2010)
Ask a question about Lakeville law
Corpus searches the Lakeville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
