For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-17-5 — GROUNDWATER ELEVATION

Lakeville, Minnesota Code of Ordinances (2026 S-14, code current through Ord. 1122, passed 4-20-2026) · Lakeville Code of Ordinances § 11-17-5

Corpus is an independent public-information project, not the official City of Lakeville website. Stable reference: corpuslaw.us/code/db4b8605-9eb9-41e8-a0e7-de36486ed5cf

11-17-5: GROUNDWATER ELEVATION:

The lowest floor, including basement floor, of all structures shall be at a level at least three feet (3') above the highest known groundwater table elevation. If requested by the building official, the groundwater table elevation shall be determined by a licensed soils engineer using soil borings, piezometers, or the observation of mottled soils. (Ord. 674, sec. 1, 7-17-2000)

Ask a question about Lakeville law

Corpus searches the Lakeville sections it holds and shows the ones that match, with their citations. Free, no sign-in.