11-29-5: SOLAR ENERGY SYSTEMS:
A. Accessory Use: 1. Solar energy systems shall be allowed as a permitted accessory use in all zoning districts in accordance with the standards in this section. 2. The following systems shall be exempt from the requirements of this section and shall be regulated as any other building element: a. Building integrated solar energy systems that are an integral part of a principal or accessory building, rather than a separate mechanical device, replacing or substituting for an architectural element or structural component including, but not limited to, photovoltaic or hot water solar energy systems contained within roofing materials, windows, skylights and awnings. b. Passive solar energy systems that capture solar light or heat without transforming it into another form of energy or transferring the heat via a heat exchanger. B. System Standards: 1. Electrical: a. All utilities shall be installed underground. b. An exterior utility disconnect switch shall be installed at the electric meter serving the property. c. Solar energy systems shall be grounded to protect against natural lightning strikes in conformance with the national electrical code as adopted by the city. d. No solar energy system shall be interconnected with a local electrical utility company until the utility company has reviewed and commented upon it. The interconnection of the solar energy system with the utility company shall adhere to the national electrical code as adopted by the city. 2. Accessory Structure: Ground mounted solar energy systems shall be regulated as an accessory structure in accordance with section 11-18-7 or 11-18-9 of this title, as applicable, as to the number allowed, setbacks, building coverage, and height. 3. Color: All roof mounted solar energy systems shall use colors that are the same or similar with the color of the roof material of the building on which the system is mounted. C. Location: 1. Roof mounting: a. The solar energy system shall comply with the maximum height requirements of the applicable zoning district. b. TThe solar energy system shall not extend beyond the perimeter of the exterior walls of the building on which it is mounted. c. Use of solar panels as a canopy or affixed to a canopy above off-street parking stalls for multiple family, commercial, industrial, and institutional uses shall be permitted in addition to accessory structures allowed by chapter 18 of this title, subject to the following provisions: (1) The edge of the canopy shall be thirty feet (30') or more from the front and/or side lot line, provided that adequate visibility both on site and off site is maintained. (2) The canopy, including solar panels, shall not exceed twenty four feet (24') in height and must provide fourteen feet (14') of clearance. (3) The canopy fascia shall not exceed three feet (3') in vertical height. (4) Canopy lighting shall consist of canister spotlights recessed into the canopy with no portion of the light source or fixture extending below the bottom face of the canopy. Total canopy illumination may not exceed the limits established by section 11-16-17.A of this title. The fascia of the canopy shall not be illuminated. (5) The architectural design, colors, and character of the canopy shall be consistent with the principal building on the site. (6) Signage shall not be allowed on a detached canopy. (7) Canopy posts shall not obstruct traffic within the off-street parking area. 2. Ground mounting: a. The solar energy system shall only be located in the rear yard as defined by this title. b. The solar energy system shall comply with the maximum height requirements for accessory buildings for the applicable zoning district. c. All components of the solar energy system shall be set back a minimum of five feet (5') from interior side lot lines and ten feet (10') from rear lot lines. d. Solar energy systems shall not encroach upon drainage and utility easements. D. Screening: Solar energy systems shall be screened in accordance with the requirements of section 11-21-13 of this title to the extent possible without affecting their function. E. Certification: The solar energy system shall be certified by Underwriters Laboratories, Inc., and comply to the requirements of the international building code. F. Abandonment: Any solar energy system which is inoperable for twelve (12) successive months shall be deemed to be abandoned and shall be deemed a public nuisance. The owner shall remove the abandoned system at their expense after obtaining a demolition permit. G. Building Permit: A building permit shall be obtained for any solar energy system prior to installation. (Ord. 867, sec. 81, 5-17-2010; Ord. 1031, 6-1-2020; Ord. 1078, 6-5-2023; Ord. 1080, 6-5-2023)
Ask a question about Lakeville law
Corpus searches the Lakeville sections it holds and shows the ones that match, with their citations. Free, no sign-in.