§ 7-15-9 — PERMIT REQUIREMENT

Lakeville, Minnesota Code of Ordinances (2026 S-14, code current through Ord. 1122, passed 4-20-2026) · Lakeville Code of Ordinances § 7-15-9

Corpus is an independent public-information project, not the official City of Lakeville website. Stable reference: corpuslaw.us/code/eca55704-59f0-4984-8941-29cf1bd98261

7-15-9: PERMIT REQUIREMENT:

A. Permit Required: Except as otherwise provided in this Code, no person may excavate, place a utility service, install or place facilities, or obstruct any right-of-way without first registering and having obtained the appropriate right-of-way permit from the City to do so. The following permits may be required: 1. Excavation Permit: An excavation permit is required by a registrant to excavate that part of the right-of-way as specifically described in such permit and to hinder free and open passage over the specified portion of that right-of-way by placing facilities described therein, for the duration specified therein. 2. Obstruction Permit: An obstruction permit is required by a registrant to hinder free and open passage over the specified portion of that right-of-way by placing facilities described therein, for the duration specified therein. An obstruction permit is required for any obstruction in connection with the installation, relocation, operation or maintenance of a utility service. 3. Small Wireless Facility Permit: A small wireless facility permit is required by a registrant to erect or install a wireless support structure, to collocate a small wireless facility, or to otherwise install a small wireless facility in the specified portion of the right-of-way, to the extent specified therein, provided that such permit shall remain in effect for the length of time the facility is in use, unless lawfully revoked. A small wireless facility permit shall not be required for: a) routine maintenance of a small wireless facility, b) replacement of a small wireless facility with a new facility that is substantially similar or smaller in size, weight, height, and wind or structural loading than the small wireless facility, c) installation, placement, maintenance, operation, or replacement of micro wireless facilities that are suspended on cables strung between existing utility poles in compliance with National Safety Codes. The telecommunication right-of-way user shall provide advance notification to the City of these activities if the work will obstruct a public right-of-way. B. Permit Extensions: No person may excavate, place a utility service, install or place facilities or obstruct the right-of-way beyond the date or dates specified in the permit unless such person: 1) makes a supplementary application for another right- of-way permit before the expiration of the initial permit, and 2) a new permit or permit extension is granted. C. Delay Penalty: In accordance with Minnesota Rule 7819.1000 subparagraph 3 and notwithstanding subsection B of this section, the City shall establish and impose a delay penalty for unreasonable delays in right-of-way excavation, obstruction, patching or restoration. The delay penalty shall be established from time to time by City Council resolution and shall include any delays or damages charged by the City's construction contractor and may include liquidated damages consistent with the contract. D. Permit Display: Permits issued under this chapter shall be conspicuously displayed or otherwise available at all times at the indicated work site and shall be available for inspection by the City. (Ord. 990, 12-4-2017)

Ask a question about Lakeville law

Corpus searches the Lakeville sections it holds and shows the ones that match, with their citations. Free, no sign-in.